Muhammad Saeed
Quantity Surveyor at Tamimi Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Urdu Full professional proficiency
-
English Professional working proficiency
-
Arabic Limited working proficiency
Topline Score
Bio
Experience
-
Tamimi Group
-
Saudi Arabia
-
Construction
-
300 - 400 Employee
-
Quantity Surveyor
-
May 2023 - Present
-
-
-
Saudi BinLaden Group
-
Saudi Arabia
-
Mining
-
700 & Above Employee
-
Quantity Surveyor
-
Sep 2009 - May 2023
Preparation and Submitting of Interim Payment Certificate (IPC). To prepare Bar Bending Schedule to release for production. Maintaining of Measurement Book (M B). Progress Report. Preparation of Road & Dam Cross-Section. Preparation of Contour Planes by using Topo Survey data on Land Desktop (Road Calc.) Bridges Box Culvert and Pipe Culvert. Grouted Rip Rap. Guard Rail. Chain Link Fence, Barbed Fence. Layout of Center line & Fixing preservation of all control points of the whole project. Perpetration of Constrictions Drawing and Relevant Details. Designing of Horizontal Alignment. Design Vertical Profile & Revising. Importing Survey data in Auto CAD from MS Excel. Checking of Steel Cages & Net on site as per Drawing & Schedule. Area of all type X-section. Calculation of Volumes. Calculation of Concrete, Steel Weight & Bricks Quantities of all type Structure. Road Elevation & Coordinate, Earth Work Cross Section, Design Horizontal and Vertical alignment with vertical profile, contouring. Co-ordination with Production Team & Material Engineer to emphasize the output and minimize the wastage. Show less
-
-
-
-
Quantity Surveyor
-
Aug 2008 - Aug 2009
Quantities calculations for Interim Payment Certificate Variation Orders Bill of Quantities, Escalation Claim, Monthly Progress Report, Earth work cross sections, Concrete & Reinforcement for Bridges (Rail & Roads) Shop Drawing Work for: Bridges, Box Culverts, Pipe Culvert Road Elevation & Coordinate, Earth Work Cross Section, Design Horizontal and Vertical alignment with vertical profile, contouring. Quantities calculations for Interim Payment Certificate Variation Orders Bill of Quantities, Escalation Claim, Monthly Progress Report, Earth work cross sections, Concrete & Reinforcement for Bridges (Rail & Roads) Shop Drawing Work for: Bridges, Box Culverts, Pipe Culvert Road Elevation & Coordinate, Earth Work Cross Section, Design Horizontal and Vertical alignment with vertical profile, contouring.
-
-
Education
-
Government College of Technology Rasul. Punjab Board of Technical Education Lahore. Pakistan
Diploma Associate Engineer, Construction Engineering -
G.H.S.S