Muhammad Rehan Sheikh
Senior Project Manager at Dolmen Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Urdu Native or bilingual proficiency
Topline Score
Bio
Experience
-
Dolmen Group
-
Pakistan
-
Real Estate
-
200 - 300 Employee
-
Senior Project Manager
-
Feb 2019 - Present
Dolmen Sky Towers, Karachi: 35 Storey Twin Towers – Modern High-rise Office & Hotel Buildings, Built-up Area of 1.4 million Sq ft (approx.) Associated with the Project during finishing stage i.e. Façade works, Parking Floors, ID works of more than 10 high-end Lobbies, Prayer Areas, Stair-cases, Cargo Elevators & Tower-cranes dismantling and their allied works, etc. Intensive coordination with MEP Teams for execution of civil works associated, such as equipment foundations, slab re-strengthening, construction of prefab structures/rooms for transformers, ELV & gen sets. Lift shafts works and protection against smoke penetration, AHU & Electrical Rooms, MEP Shafts and sealing all shafts, floors and joints with fire-retardant sealants and sprays as per NFPA’s code. Rigorous coordination with contractors & suppliers, as such to complete the Project in all respects, and start of Building hand-over process. Responsibilities: Complete coordination among Owners, Architects, MEP Consultants and different Contractors. Top supervision of Civil, ID and Façade works. Get prepared project presentations, budgetary reports, feasibility reports, cost estimations, tender evaluation reports etc. B. HEADING Dolmen Malls & Sky Towers’ Fit-out Department: Responsibilities: Leading a Team responsible for all Fit-out related activities of new and vacant premises. Prequalification of Tenant’s Architects, MEP Consultants & Contractors, review of Architectural & MEP Drawings in-line with Mall’s SOPs & specs. Approving construction materials’ submittals and giving special attention to quality & fire-retardant properties. Ensuring frequent site visits during construction phase andlooking-after processes involving final inspections with Mall’s FM & Operation’s Teams for hand-over. Show less
-
-
-
Bank AL Habib Limited
-
Pakistan
-
Banking
-
700 & Above Employee
-
SCM – Building Projects Lead
-
Sep 2014 - Jan 2019
A. Corporate Headquarter Building, Karachi: 20 Storeys – Contemporary, classical style Bank’s Head-office Building, Built-up Area of 450,000 Sq ft (approx.) Project Cost: Pak Rs. 5.0 Billion (approx.) Responsibilities: Coordination among Owners, Architects and MEP Consultants. Preparation of user brief, Project presentations, Budgetary reports, Feasibility reports. B. ID Works of 14th & 15th floors, Centre Point Building, Karachi: Completed, Interior Finishes of 2 floors for Bank’s IT Divisions, comprising of 20,000 Sq ft. Executive Board Room, MacKinnon’s Building, Karachi: Completed, Exquisite Interior with Hi-tech gadgets ID Works of 12th floor, Techno City, Karachi: Completed, Admin Division’s floor, comprising of 8,500 Sq ft Responsibilities: Coordination among Building Owners, Users, Architects/MEP Consultants & Contractors Detailed Site Supervision of Civil, ID, Electrical & Low-current, Fire-fighting, HVAC, Furniture System, etc. Korangi Warehouse, Karachi: Completed, structural retrofitting with columns jacketing and strengthening. C. Regional Head-office Building, Lahore: 8 Stories, Modern Banking Building, Built-up Area of 100,000 Sq ft Finalization of user requirements, Concept Development, Schematics, Designing and Planning stage. Responsibilities: Coordination among Owners, Architects and MEP Consultants. Preparation of User Brief, Project Presentations and finalized Contract Agreement with Architect. D. Registered Office Building, Multan: Multi-story Modern Banking Building, Built-up Area of 60,000 Sq ft Construction stage. Responsibilities: User Brief, Concept Development/Schematics, Budgeting, Designing & Planning, Preparation of Bid Documents & Tendering, Award of Works, 50% Grey structure completed. E. Multistory Buildings, All-over Pakistan: Typically Comprising of basement, ground plus 4 floors, catering Bank’s requirements. Area between 15,000 ~ 20,000 Sq ft. Show less
-
-
-
Institute of Business Administration
-
Pakistan
-
Education Administration Programs
-
700 & Above Employee
-
Senior Manager Projects
-
Apr 2013 - Jul 2014
A. AMAN TOWER: 14 Storeys, Modern High-rise Educational Building, Built-up Area of 155,000 Sq ft (approx.) Project Cost: Pak Rs. 1.5 Billion Major Responsibilities: Project Coordination among Client, Architect, Consultants, Contractors & Suppliers and Construction Supervision at Site. B. JS AUDITORIUM: For 404 persons, latest Audio/Visual, Lighting Control, High-definition Projection, Acoustics. Project Cost: Pak Rs. 200 Million Major Responsibilities include Top Supervision & Coordination. C. HBL ACADEMIC CENTRE: Multistory Building having Robotics, Web-sciences, Signal-processing Labs Project Coordination & Construction Supervision at Site, includes renovation of existing Building as well as new structure, for under-graduate & post-graduate Programs. Show less
-
-
-
Novatex Limited
-
Pakistan
-
Plastics Manufacturing
-
200 - 300 Employee
-
Project Manager/ Coordinator
-
May 2005 - Apr 2013
A. G&T TOWER: 16 Storeys, Modern High-rise Office Building, comprising of 200,000 Sq ft covered Area Project Cost: Pak Rs. 1.2 Billion Associated with the Project from start to end i.e. Concept Development, Planning, Schematics Designing, MEP Coordination, Approvals, Pre-qualification of Contractors, Tendering, start of Structural & MEP Works, Correspondence & Scheduling, Coordination of Architects, Consultants & Contractors, Erection of Power House, Commissioning of Chillers & Lifts, Execution of ID Works with different Contractors & Suppliers, completed the Project in all respects and Handed-over the Building. Responsibilities: Complete coordination between Owners, Architects, MEP Consultants, Building Control Authorities, Utility Service Providers and Contractors. Preparation of Project Presentations, Budgetary Reports, Feasibility Reports, Cost Estimations, Tender Evaluation Reports etc. Detailed Site Supervision i.e. Civil, Façade Works, Electrical, Plumbing, HVAC, Interior, Lifts, Gen Sets etc. B. PRIVATE RESIDENCY: French Riviera style Villa Key Responsibilities: Detailed supervision & coordination of Villa among Client, Architect, Contractors & Suppliers. Assisting Owner & Architect in pre-qualification & selection of Contractors, scheduling of Works, selection of materials & finishing items and their procurements. Strict quality control on furnishing of exquisite materials with high-end finishing. C. NOVATEX LIMITED FACTORY: Karachi Export Processing Zone, Landhi Project Cost: Exceeding Pak Rs. 5.0 Billion Responsibilities: Detailed Construction Supervision at Site, Inspection of Shuttering, Steel and Concreting, checking & verification of Bar-bending Schedules, Embedded plates, Sleeves, Opening etc. Show less
-
-
-
Usmani Associates
-
Karāchi, Sindh, Pakistan
-
Site Engineer (Civil)
-
Nov 2004 - Apr 2005
KPT INTERCHANGE AT KORANGI ROAD: A 3 Tear project with 450 Piles (approx.) Project Cost: Pak Rs. 300 Million (approx) Site Supervision, execution planning of construction activities, accurate requisition for material & equipment and ensured their timely delivery. Implementation of QA/ QC and HSE. Executed Sub-soil Investigations, boring & casting of Test Piles and Load Pile Testing. Conducted boring & casting of more than 300 piles through percussion & rotary method. Site Coordination with Client & Consultants and preparation of Monthly Progress Reports. Show less
-
-
-
Liaquat National Hospital and Medical College
-
Pakistan
-
Hospitals and Health Care
-
400 - 500 Employee
-
Civil Engineer - Execution
-
Apr 2002 - Nov 2004
A. SYED WAJID ALI COMPLEX: New Building for OPDs, Operation Theaters & I.C.Us Project Cost: Pak Rs. 750 Million Successful on-time completion of the Building with special emphasis on Quality, Infection Control & Cost containment. Also involved in the commissioning works of HVAC, Lifts & Electrical systems. Responsibilities: Site supervision & execution of different construction activities of civil and MEP works in a proper sequence. Rigorous coordination among Architects, Consultants & Contractors with followups & constant feed-backs. Daily monitoring & tracking of Project’s Schedule using MS Projects. B. CARDIAC WARDS & C.C.U. II Supervision of day to day operations of site works, conducting regular job site inspections. Daily Interaction with Senior Engineer on Project’s progress, delays, clarifications in design/RFI. Effective and site coordination among different trade Contractors to achieve deadlines. Ensuring correct specifications of different activities being implemented and communication regarding changes has reached to Contractors. Show less
-
-
-
Loya Associates
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
Jr. Structural Design Engineer
-
Jan 2001 - Mar 2002
Designing of different components of Beam-Slab Bridges of Makran Coastal High-way i.e. piers, abutments, transom, pre-stressed concrete I-girders. Structural designing of some portions of Islamabad Serena Hotel. Rehabilitation of RCC Structure of a Sugar Mill, damaged in earthquake. Designing of different components of Beam-Slab Bridges of Makran Coastal High-way i.e. piers, abutments, transom, pre-stressed concrete I-girders. Structural designing of some portions of Islamabad Serena Hotel. Rehabilitation of RCC Structure of a Sugar Mill, damaged in earthquake.
-
-
-
Adnan Asdar & Associates
-
Karāchi, Sindh, Pakistan
-
Junior Site Engineer (Civil)
-
Sep 1999 - Nov 2000
A. MCB TOWERS, KARACHI: 29 Storeys - One of the tallest Buildings of Pakistan Supervised regular & secant Pilling through rotary method, assisted in enforcement of Quality & HSE Carried-out pre-Qualification process for Contractors - Phase II B. SSGCL HEAD OFFICE BUILDING, KARACHI: Modern 9 Storey Office Building Conducted regular site inspections and daily follow-ups with Contractor, to ensure work is being carried-out as per approved drawings, specifications and meeting schedule dates. Close interaction with Resident Engineer and daily reporting of Progress of Works, all noncompliance, delays and assisting in necessary Project documentation. Civil & ID work’s Quality Control & Quality Assurance and ensured HSE plan being implemented. Monitoring Schedule & tracking of critical activities using Project Management software. Supported in verifications & certifications of Bills and extra items raised by Contractors Show less
-
-
Education
-
NED University of Engineering and Technology
Bachelor of Engineering - BE, Civil Engineering -
Pakistan Institute of Management (PIM)
PG Diploma, Project Management -
PIMSAT
Master's degree, Information Technology