Muhammad Khizer Iqbal
Formwork application engineer at FRIEDR. ISCHEBECK GMBH- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Urdu Native or bilingual proficiency
-
German Limited working proficiency
Topline Score
Bio
Credentials
-
BIM Manager: Managing BIM 360
LinkedInJun, 2022- Nov, 2024 -
Creating a BIM Execution Plan
LinkedInJun, 2022- Nov, 2024 -
Introduction to ISO Global BIM Standards
LinkedInJun, 2022- Nov, 2024 -
Navisworks Essential Training
LinkedInJun, 2022- Nov, 2024 -
Revit: Structural Analysis Tools
LinkedInJun, 2022- Nov, 2024 -
BIM Foundations
LinkedInMay, 2022- Nov, 2024 -
A Hands-on Introduction to Engineering Simulations. Cornell University
edXApr, 2020- Nov, 2024
Experience
-
FRIEDR. ISCHEBECK GMBH
-
Germany
-
Construction
-
1 - 100 Employee
-
Formwork application engineer
-
Nov 2022 - Present
• Review of documents for preliminary planning. • Selection of ISCHEBECK products to be planned, according to cost-effectiveness. • Simple static calculations and creation of formwork plans in Autodesk REVIT for presentation to the customer. • Creation of material lists with material value for the initial offer to the customer. • Review of documents for preliminary planning. • Selection of ISCHEBECK products to be planned, according to cost-effectiveness. • Simple static calculations and creation of formwork plans in Autodesk REVIT for presentation to the customer. • Creation of material lists with material value for the initial offer to the customer.
-
-
-
Institut für Strukturmechanik (ISM)
-
Bauhaus-Universität Weimar
-
Master Thesis
-
Oct 2021 - Jan 2022
Thesis: Optimization of the structural system for a foldable structural system for temporary tent constructions - Modelling concept for the erected structure • Structural modeling concept is developed, to assess the erected structural system under typical loading conditions taking into account the relevant regulations from EU and German standards. - Modelling concept for the erection process • A simplified modeling concept is developed to predict the erection process of the tent structure considering the large deformation taken into account to describe the lifting process of the structure. Show less
-
-
-
ZKB-RELIABLE
-
Lahore, Punjab, Pakistan
-
Site Engineer
-
Jun 2017 - Sep 2017
-
-
Education
-
Bauhaus-Universität Weimar
Master of Science - MS, Natural Hazards and Risks in Structural Engineering -
The University of Lahore
Bachelor of Science - BS, Civil Engineering