Muhammad Iqbal

Account Service Engineer for Asia Pacific at Anitox
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Biotechnology Research
    • 1 - 100 Employee
    • Account Service Engineer for Asia Pacific
      • Sep 2018 - Present

    • France
    • Chemical Manufacturing
    • 700 & Above Employee
    • Technical Engineer
      • Aug 2016 - Aug 2018

    • Indonesia
    • Oil and Gas
    • 700 & Above Employee
    • Instrument Engineer
      • Apr 2015 - Jul 2016

      Sabah Ammonia Urea (SAMUR) Project Sabah Ammonia Urea (SAMUR) Project

    • Indonesia
    • Non-profit Organizations
    • 1 - 100 Employee
    • Instrument and Electrical Engineer
      • Jan 2013 - Mar 2015

      Project : EPCC Orifice Metering System and Gas Pipeline Project For PLTG Duri Client : PT. Indonesia Power Location : Duri, Riau Time : Januari 2013-April 2014 Engineering and Project Management Consultant as instrument and Electrical Engineer Responsible : Review Contractor instrument specification, datasheet and Detail Drawing (Electrical, instrument, and cathodic protection) - Inspection Electrical, instrument, and cathodic protection material - Witness Installation, testing and commissioning electrical and instrument (Metering System, DCS and Fire & Gas System, CAthodic Protection) Instrument Engineer Client : Gagas Energi Indonesia Location : Jakarta Year : May-June 2014 Main project features: Engineering Design, SPBG Sukabumi Activities performed: Developed Instrument Engineering Design for CNG Station include F&G, CCTV and billing system. Instrument Engineer Client : Gagas Energi Indonesia Location : Jakarta Year : September-October 2014 Main project features: Engineering Design, SPBG BATAM Activities performed: Developed Instrument Engineering Design for CNG Station include F&G, CCTV and billing system.

    • Instrumentation, SCADA and Telecom Engineer
      • Jun 2013 - Dec 2014

      Project : EPC SCADA and Communication system Client : PT. Perusahaan Gas Negara (PGN) Location : Jakarta, West Java and Banten Time : June 2013-Februari 2014 Engineering and Project Management Consultant Responsible : Developed Pre eleminary Instrument Design : SCADA and Telecom Design ( Specifiacation, Datasheet, and Drawing) - SCADA - Offtake Metering Regulating Station - Automatic Meter Reading (AMR) - Pressure Monitoring Device (PMD) - Communication System ( Fiber Optic, GSM, Microwave Radio) - Fire and Gas System Review Contractor instrument, SCADA and Telecom specification, datasheet and Detail Drawing Inspection instrument material Monitoring Installation, testing and commissioning SCADA Project : EPC Muara Karang – Muara Bekasi Pipeline Project Client : PT. Perusahaan Gas Negara (PGN) Location : Jakarta, West Java and Banten Time : September 2013-December 2014 Engineering and Project Management Consultant Responsible : Developed Instrument Design : Metering Regulating Station and SCADA ( Specifiacation, Datasheet, and Drawing) : - Control valve - Gas Metering System - Fire and Gas System - CCTV System - Pressure Shutdown Valve - SCADA Review Contractor instrument, SCADA specification, datasheet and Detail Drawing

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • Engineer and Procurement (under PT. Fast Track Indonesia)
      • Apr 2013 - Jun 2013

      Procurement - analyzed engineering design CNG Tube skid - Prepared Technical Bid Analysis CNG TUbe Skid - Procured CNG Tube skid - Procured sparepart of CNG Compressor Engineering : Developed Engineering Design for PRessure Regulating Skid for CNG Procurement - analyzed engineering design CNG Tube skid - Prepared Technical Bid Analysis CNG TUbe Skid - Procured CNG Tube skid - Procured sparepart of CNG Compressor Engineering : Developed Engineering Design for PRessure Regulating Skid for CNG

    • Indonesia
    • Non-profit Organizations
    • 1 - 100 Employee
    • Apprenticeship as Instrument Engineer
      • Jun 2011 - Jul 2011

      Project : Perusahaan Gas Negara (PGN) Responsible : - Review Engineering Design Metering Regulating System - Sizing Control Valve - Sizing Orifice Flow meter Project : EPC CNG Mother Station PT. Java Energi Semesta Location : Gresik, East Java - Review Engineering Design CNG Mother Station PT. Java Energi Semesta Project : Perusahaan Gas Negara (PGN) Responsible : - Review Engineering Design Metering Regulating System - Sizing Control Valve - Sizing Orifice Flow meter Project : EPC CNG Mother Station PT. Java Energi Semesta Location : Gresik, East Java - Review Engineering Design CNG Mother Station PT. Java Energi Semesta

Education

  • Institut Teknologi Sepuluh November
    Sarjana Teknik (Bachelor Of Engineering), Engineering Physics
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now