Muhammad Gad El Rab
Design Coordinator at Align JV- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Arabic Native or bilingual proficiency
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Align JV
-
United Kingdom
-
Civil Engineering
-
100 - 200 Employee
-
Design Coordinator
-
Jan 2020 - Present
-
-
-
Sir Robert McAlpine
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Design Coordinator
-
Jan 2020 - Present
-
-
-
Jacobs
-
Netherlands
-
Retail Office Equipment
-
1 - 100 Employee
-
Civil Engineer
-
Oct 2018 - Jan 2020
Heathrow Expansion Project (£1.4bn)I am currently working on the Heathrow expansion project, leading the design development of Stanwell Moor Junction and the A3113. My role includes coordinating sub-disciplines for design development and working collaboratively with other consultancies also on the HEP. Oxford to Cambridge ExpresswayThe Oxford to Cambridge expressway project aims to improve connectivity between Oxford and Milton Keynes. As part of the Development Consent Order (DCO), stakeholder engagement was conducted in the impacted areas. Working in the Stakeholder Engagement team, I liaised with stakeholders from the impacted regions in order to gather local intelligence for the design development of potential route options. Show less
-
-
Graduate Civil Engineer
-
Sep 2016 - Oct 2018
Heathrow Expansion Project (£14bn)The potential expansion of Heathrow Airport would have an impact on all surrounding roads and junctions. The assessment of options for the future connectivity of the impacted road network was conducted. Based in the Highways team, I was assisting the Highways Lead to develop preliminary design options for the local roads and junctions as well as assisting the Project Manager with key client deliverables.A428 Black Cat to Caxton Gibbet Scheme (£1bn)The A428 Black Cat to Caxton Gibbet improvements aims to support the local growth plans by reducing congestion and improving the reliability of journeys. As a Graduate Engineer in the Highways team, I reviewed design options according to the Design Manual for Roads and Bridges (DMRB). I also assisted the Project Manager with key deliverables for the client, Highways England. Show less
-
-
-
G A M CONTRACTOR LIMITED
-
Construction
-
Engineer
-
May 2014 - Oct 2016
Managing and engineering home improvement solutions for various property types. My responsibilities included: • Liaising with clients to understand their requirements, inform them of building regulations and discuss potential solutions. • Liaising with councils to obtain planning permissions. • Researching and procuring materials, considering price and quality. • Setting contractual agreements with clients to include rights, programme and payments. • Planning construction sequence considering time, budget and material logistics. • Performing quality checks for building control approval. Show less
-
-
-
Tesco PLC
-
Appliances, Electrical, and Electronics Manufacturing
-
Checkout Team Leader
-
Oct 2012 - Jan 2016
Managed the front end of a Tesco Extra store. This included prioritising and allocating tasks to ensure maximum productivity and effectively communicating with my team on a frequent basis. Managed the front end of a Tesco Extra store. This included prioritising and allocating tasks to ensure maximum productivity and effectively communicating with my team on a frequent basis.
-
-
Education
-
Brunel University London
Civil Engineering with Sustainability (MEng), Civil Engineering -
William Morris Sixth Form