Muhammad Bayomi
Technical Office Engineer at Samco-National Construction Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Elementary proficiency
-
Arabic Native or bilingual proficiency
Topline Score
Bio
Credentials
-
IPMA Level D
IPMA: International Project Management AssociationMar, 2022- Nov, 2024 -
Google Project Management: Professional Certificate
Google -
Revit and BIM
Right Angle Egypt
Experience
-
Samco-National Construction Company
-
Egypt
-
Construction
-
300 - 400 Employee
-
Technical Office Engineer
-
Jun 2021 - Present
• Receive drawings, BOQ and Specs from the consultants in order to make sure if there are any amendments needed in the upcoming project.• Coordinate with the Structural and architectural disciplines and check if there is any RFI needed to be sent to the consultant.• Making shop drawings for bridges elements.• Quantity surveying of bridge projects.• Issuing submittal of all materials used in the projects.• Coordinate with other Technical Office engineers to produce shop drawings with a focus on aesthetics and cost control.• Resolve arising conflicts between various design components.• Preparing Cost breakdown and documents needed for price discussion committees• SAP ERP USER Show less
-
-
Site Engineer
-
Feb 2021 - Jun 2021
• Supervise all structural concrete construction activities of Alferdos axis bridge.• Ensure execution of work according to approved drawings, design and specifications.
-
-
-
X Design
-
Egypt
-
Construction
-
1 - 100 Employee
-
Site and Technical Office Engineer
-
Nov 2020 - Dec 2020
• Preparing executive Drawings, tender, abstracts and implementation of RC Foundation for carrying water pumps for HelioPower in Mostorod Water Station. • Implement a footpath for ELSERAFY ENGINEERING LLC in Qalyub Central.
-
-
Technical Office Engineer
-
May 2020 - Oct 2020
• Negotiate with clients regarding the preparation of reconciliation files of construction.• Surveying the facility, drawing architectural and construction drawings as built.• Structural design of the facility to ensure structural safety & Preparing the calculation notes• Approval of drawings and reports from consulting engineers & Follow up on the issuance of the safety certificate of origin from the Engineers AssociationP.S. greater than 100 clients were treated preparing the reconciliation document Show less
-
-
-
Egyptian Armed Forces Engineering Authority - الهيئة الهندسية للقوات المسلحة المصرية
-
Egypt
-
Construction
-
300 - 400 Employee
-
Supervision & Technical Office Engineer
-
Mar 2019 - Feb 2020
Project | East Port Said Naval Base • Supervising infrastructure, construction, Landscape, and finishing works and ensuring execution of work according to approved drawings, design, and specifications. • Supervise soil improvement by CMC (Controlled Modulus Column) method. • Follow-up performance rates and submit daily reports. • Managing the distribution of materials to the various operating companies. • Perform quantity surveying for some different work items of buildings. Project | East Port Said Naval Base • Supervising infrastructure, construction, Landscape, and finishing works and ensuring execution of work according to approved drawings, design, and specifications. • Supervise soil improvement by CMC (Controlled Modulus Column) method. • Follow-up performance rates and submit daily reports. • Managing the distribution of materials to the various operating companies. • Perform quantity surveying for some different work items of buildings.
-
-
-
Bauer Foundation Corp.
-
United States
-
Construction
-
200 - 300 Employee
-
Trainee
-
Mar 2018 - May 2018
Projects | 500500 Hospital, 57357 Hospital, and Extensions of the Bar Association of Cairo. • Follow-up construction of the diaphragm wall and its Tieback (Soil nails) of 500500 Hospital. • Follow-up construction of the diaphragm wall and its temporary Tieback (anchor) & dewatering of 57357 Hospital. • Follow-up Jet grouting soil improvement and the process of dewatering at Extensions of the Bar Association of Cairo. Projects | 500500 Hospital, 57357 Hospital, and Extensions of the Bar Association of Cairo. • Follow-up construction of the diaphragm wall and its Tieback (Soil nails) of 500500 Hospital. • Follow-up construction of the diaphragm wall and its temporary Tieback (anchor) & dewatering of 57357 Hospital. • Follow-up Jet grouting soil improvement and the process of dewatering at Extensions of the Bar Association of Cairo.
-
-
-
Directorate of Housing and Utilities, Qalyubia Governorate
-
Qaha, Al Qalyubiyah, Egypt
-
Trainee
-
Jun 2016 - Jul 2016
• Residential construction work. • Residential construction work.
-
-
-
The Arab Contractors
-
Egypt
-
Construction
-
700 & Above Employee
-
Trainee
-
Jun 2015 - Jun 2015
• Study in practical workshops for construction works. • Concrete form works, steel-reinforced works, masonry works, plaster works, electric works, plumbing works, woodworks, metal works, and paints works. • Study in practical workshops for construction works. • Concrete form works, steel-reinforced works, masonry works, plaster works, electric works, plumbing works, woodworks, metal works, and paints works.
-
-
Education
-
Benha University
Master of Engineering - MEng, Structural Engineering -
Pyramids higher institute for engineering and technology, PHI
Bachelor's degree, Civil Engineering