Muhammad Azizuddin Bin Mohd Haris

Project Engineer at Misi Setia Oil & Gas (MSOG) Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
MY
Languages
  • English Professional working proficiency
  • Bahasa Malaysia Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Board of Engineers, Malaysia (BEM)
    -
  • OHD Medical Check Up (Offshore)
    -
  • The Institution of Engineers, Malaysia (IEM)
    -

Experience

    • Oil and Gas
    • 1 - 100 Employee
    • Project Engineer
      • Jan 2017 - Present

      Project involved: 1). EPCIC of 1 unit Light Fuel Oil Tank & 2 units Condensate Water Storage Tank for Toshiba Energy Malaysia Sdn Bhd (Jimah East Power 2x1000MW Coal Fired Power Plant Project) 2). Offshore Shutdown/Turnaround activity: Installation & Commissioning of Ultrasonic Flare & Vent Meter for PETRONAS Carigali Sdn Bhd (Sabah) - Samarang A, B, C, Sumandak B & Erb-West B Platform 3). Site Installation of Package 4, The Amine Recovery Units (ARU), Sulphur Recovery Units (SRU), Sour Water Stripping Units (SWSU), Liquid Sulphur Storage Unit (LSSU) and Sulphur Solidification Units (SSU) - PETRONAS Refinery And Petrochemical Integrated Development (RAPID) Project Pengerang, Johor. Job duties: 1). Accountable for project execution, progress monitoring and liaison with client, vendors and sub-contractors. 2). Issue Technical Query to client for any changes of engineering design. 3). Supervise fabrication works, cutting and rolling activity to meet specific design requirement. 4). Assist document controller in compiling Dossier prior handover to client. 5). Monitor raw material inspection and verification of mill certificate. 6). Carry out final inspection of the product prior deliver to client. 7). Ensure quality of fabrication work comply with project specification and standard. 8). Coordinate shutdown activity for 4 platforms concurrently to meet shutdown schedule. 9). Coordinate material delivery including dealing with Custom for material clearance from port. 10). Lead Test Pack & Final Document compilation for PETRONAS RAPID Project (site installation)

    • Oil and Gas
    • 700 & Above Employee
    • Project Engineer
      • Jun 2014 - Dec 2016

      Project involved:1). EPCIC of 4 units Wellhead Platforms for JDA Block B-17 and B-17-01 Field Phase 3 Development Project for Carigali – PTTEPI Operating Company (CPOC): Thailand. (Total weight: approx. 8,000 MT)2). EPCIC of 3 units Wellhead Platforms for Mumbai High South Redevelopment Phase 3 (MHSRD-III) Project for Oil and Natural Gas Corporation Limited (ONGC): India. (Total weight: approx. 12,000 MT)Job duties:- Onshore scope - Fabrication of CPOC Phase 3 & MHSRD-III Project: 1). Responsible for project execution, progress monitoring, budget controlling and liaison with client, vendors and sub-contractors. 2). Monitor and manage quality compliance according to standard, specification and project specific procedure. 3). Check and supervise all the fabrication work are as per construction drawing. 4). Initiate HSE campaigns and monitor HSE progress throughout the project period. 5). Initiate Change Order as and when required and manage it.- Offshore scope - Installation of CPOC Phase 3 Wellhead Platform: 1). Supervise, monitor and provide technical support for offshore installation works at field. 2). Ensure safety is taken into account during offshore installation activity. 3). Initiate Daily Shift Meeting prior to start any works in order to have good coordination between teams. 4). Prepare Shift Report on all activities carried out and submit to Offshore Installation Manager. 5). Ensure project quality according to client’s specification are fully fulfill.

    • Civil Engineer
      • Nov 2012 - Jun 2014

      Project involved:1). Construction of new yard jetty (Jetty 10) with wharf load-out capacity 3000 MT.2). Developing new yard area (Sector 4) with total area 70 acres for Wheatstone Project for Bechtel Corporation: United States of America:- Construction of Client Office Building, Staff & Crew Canteen, Piping Workshop, Module Assembly Workshop, Radiography Bunker, Sewage Treatment Plant and Labour Camp.- Installation, Testing and Commissioning of Tower Crane, Gantry Crane, EOT Crane, Centralised Air Compressor System and Firefighting System.- Infrastructure Works.Job duties:1). Monitor and manage overall fabrication yard development activity and provide project team with all facilities needed.2). Check and supervise every construction work of new facility are execute as per schedule, budget and construction drawing.3). Ensure quality of the construction work are comply to the specification and standard requirement.4). Control and monitor status of project material or equipment available at work site.5). Ensure safety practise at work site are perform by all party involved.

    • Research Assistant
      • Sep 2011 - May 2012

      Job duties: - Execute research activity and prepare report to Research Leader. - Prepare journal based on the research outcome. - Present research outcome to UMP Research Panel. Job duties: - Execute research activity and prepare report to Research Leader. - Prepare journal based on the research outcome. - Present research outcome to UMP Research Panel.

Education

  • UNIVERSITI MALAYSIA PAHANG
    Bachelor of Applied Science (BASc), Civil Engineering
  • Pusat Asasi Sains Universiti Malaya (PASUM)
    Matriculation
  • Malay College Kuala Kangsar (MCKK)
    Sijil Pelajaran Malaysia

Community

You need to have a working account to view this content. Click here to join now