Muhammad Arief Hidayat

Instrument and Control Technician at PT. Bhumi Jepara Service
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jepara Regency, Central Java, Indonesia, ID
Languages
  • Indonesian Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Ovation-Windows Configuration (DCS)
    Emerson
    Oct, 2016
    - Oct, 2024
  • First Aid Training
    Shanghai Donghai Vocational & Technical College
    May, 2016
    - Oct, 2024
  • Instrument and Control Power Generation Maintenance
    Hakit
    Sep, 2021
    - Oct, 2024

Experience

    • Indonesia
    • Oil and Gas
    • 100 - 200 Employee
    • Instrument and Control Technician
      • Sep 2020 - Present

      2x1000MW Tanjung Jati B Unit 5&6 Ultra-Supercritical Power Plant − Performs corrective maintenance by troubleshooting, repairs, and installation assorted plant control, process monitoring instrumentation, valves, dampers, sensor, gauges, thermocouple/RTD, fire and gas system, and hydraulic power unit. − Performs scheduled preventive maintenance of various types of field instruments and planned inspections to identify and report status of equipment, including cleaning, stroke test, function test, tightening, flushing, and visual check. − Performs function test, calibration and documented the equipment condition of field instruments, including transmitters, thermocouple/RTD, gauges, switch, and shut-off and control valves/dampers. − Develops Root Cause Analysis (RCA) report in the instrumentation section. − Determines the existence of electrical hazards and problems. Safely isolate, ground, and preparecircuits and electrical apparatus to enable repairs. − Completes all written and electronic records (work orders, preventive maintenance form, and calibration sheets) required to document the work in progress and as it is completed. − Analyzes DCS Toshiba TOSMAP and PLC Siemens logic sequence and modify when necessary. − Review work order status, evidences, and spare parts availability in CMMS IBM Maximo before submit work order to PTW staff. Show less

    • China
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Instrument and Control Technician
      • Jun 2016 - Jul 2020

      2x200MW Pangkalan Susu Power PlantMay 2019 – July 2020− Performed corrective maintenance on defects of the field instruments and electrical devices.− Performed preventive maintenance by conducting inspection, spare part replacement, cleaning, and tightening to identify and report status of equipment.− Ensured smooth functioning, lubricant oil change on 6kV and 400V motors, corrosion and dustremoval fromthe sensors, field instruments, local control panels, and MCC control panels.− Conducted maintenance daily work with refer to Permit to Work (PTW) and company safety andenvironment rule implementation.− Worked with various types of electrical cableway routings, electrical conduits, and electrical raceways.2x150MW Mabar Elektrindo Power PlantJune 2016 – May 2019− Responsible for checking and setting up the Ovation DCS function block diagram and its configuration based on Emerson, control system architecture, instrument index, I/O list, P&ID, and datasheet.− Cooperated with EPC contractor or Emerson Process Management engineers to update or revise the P&ID,DCS function block diagram, and installation when necessary.− Interpreted drawing, wiring diagram, flow chart, and written description of the project requirements.− Cooperated with EPC to do commissioning activities in the boiler system.− Cooperated with EPC to do calibration, stroke test, and adjustment on the field instruments.− Cooperated with EPC to review the SWCF (Site Work Confirmation Files) documents.− Created and ensured the document of the maintenance, work instruction procedures, and calibrationprocess are approved by maintenance manager.− Cooperated with EPC to do field walkdown inspections to check the field instrument defects andensure that the field instrument devices are installed properly and refer to P&ID drawing.− Ensured that punch lists items are accurate and properly filed and closed. Show less

    • Technician Trainee
      • Dec 2015 - Jun 2016

      • On-the-job training at 2x300MW Wujing Coal-Fired Power Plant, Shanghai.• DCS training at Emerson Process Management, Shanghai.• DCS training at Shanghai University of Electric Power.• First Aid Training Program by Shanghai Donghai Vocational Technical College.• Power generation system training

    • United States
    • Financial Services
    • 1 - 100 Employee
    • Information Technology Intern
      • Feb 2015 - Mar 2015

      PABX installation at PT. Riau Andalan Pulp and Paper. PABX installation at PT. Riau Andalan Pulp and Paper.

Education

  • Politeknik Negeri Medan
    Associate's degree, Computer Engineering
    2012 - 2015
  • Universitas Pembangunan Panca Budi (UNPAB)
    Bachelor's degree, Computer Systems
    2017 - 2020

Community

You need to have a working account to view this content. Click here to join now