Muhammad Ali Munir
Control Engineer at Sitara Chemical Industries Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Experience
-
Sitara Chemical Industries Limited
-
Chemical Manufacturing
-
100 - 200 Employee
-
Control Engineer
-
Mar 2016 - Present
Responsibilities: Reporting Directly to Manager Electrical & Operations; Plan and Schedule the daily maintenance activities on Plant. Implementation of SOP’s in Operation & Maintenance Activities on Plant Programming & interlocking of Boiler (WUXI), Turbine(HTC) and Generator(JPEC) for safe Operation of System Communication of BOP’s (RO PLANT ,COAL HANDLING SYSTEM,LIMESTONE,FABRICBAG & CEMS) PLC With DCS Erection Commissioning of MV VFD(POWER ELECTRONICS) and Motors up to 1250KW and Communication with Holly Sys DCS WOOD WARD 505 & BENTLY NEVIDD 3500. Modification and Addition of Any Loop & Interlocking on DCS (HOLLYSIS). Work on PLC (SIEMENS) ,Sematic S7 300, 200 and Communication With DCS Configuring and faults diagnosis of DCS, PLC, SCADA, Mod Bus, Profibus Communication and Control Loops. Installation, calibration and loop checking of the field instruments Maintenance and calibration of the control valves (Pneumatic, MOV, NRV) Designing, Implementing and Commissioning of new control loops as per site requirements. Preparing master data sheet for PM schedule; ensuring safe and efficient performing of CM Technical Support for the team Spares balance investigation and inventory control of spare parts for maintenance Activity
-
-
-
Ittehad Chemicals Ltd.
-
Pakistan
-
Chemical Manufacturing
-
100 - 200 Employee
-
instrument and control engineer
-
Nov 2012 - Feb 2016
Responsibilities: Reporting periodically to Maintenance Manager; preparing KPI, PM and CM reports. Update The Routine Maintenance Log Book –Break Down Analysis Equipment Ranking & Critical Spare List Preparing of SOP’s of All Instruments Troubleshooting the DCS ABB ACF800R Troubleshooting of PLC system (ADAM, Mitsubishi, IT cell. ). Programming of process Controllers Planning required for the identification of critical instruments and execution at scheduled calibrations. Maintenance and calibration of pneumatic control valves Maintenance and calibration of different analyzers: PH, Humidity. Maintenance and calibration of transmitters PT, LT, TT, DPT : Ensure Spares balance and inventory control for all instruments’ spare parts: Involved in the mixing plants erection works, commissioning and maintenance. Troubleshooting of PLC system and faults diagnosis (ADAM, Mitsubishi, IT cell.). Calibrating of weighting systems including load cell (120,80,2) ton capacity I designed, implemented and commissioned automatic control systems for Mercury Recovery Plant... Planning and implementing additional control loops as per site requirements Work & Installation of VFD’s. (ABB ,Schneider, Mitsubishi) Programming PLC (Mitsubishi ) by Ladder Diagram, and hardware troubleshooting
-
-
Education
-
University of the Punjab, Lahore
Master's degree, Master in industrial Engineering and Management -
Comsats Institute Of information Technology Abbottabad
Bachelor of Engineering (BEng), Electrical and Electronics Engineering -
Ali Cadet College Kot Addu
FSc, Science -
Govt. High School Kot Addu
Matric, Science