Muhammad Afzal

Deputy Manager Engineering at Shafi Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lahore, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Ist Class Boiler Engineer
    Board of Examining Engineers Punjab
    Oct, 2022
    - Nov, 2024
  • 2nd class Boiler Engineer
    Board of examining engineers Punjab. Lahore
    Mar, 2017
    - Nov, 2024

Experience

    • Pakistan
    • Apparel & Fashion
    • 1 - 100 Employee
    • Deputy Manager Engineering
      • Nov 2021 - Present

      - Independently leading all corrective & breakdown troubleshooting on 09 Tons/day Yarn Dyeing facility - Planning preventive maintenance activities & execution - Spare parts inventory management & technical procurement - Utilities management & operations (Boilers, Chiller, Air Compressor, Dryer, RO, Genset, Pumps, Transformer, LT/HT & Distribution networking) - Utilities & Energy data monitoring & controlling - Projects, Installation & commissioning, Solar 360KW, Workshop Operations - Erecting and commissioning of Biomass boiler of capacity 05 Ton/HR Show less

    • Chief Mechanical Engineer
      • Mar 2018 - Nov 2021

      - Plant maintenance & shutdown of 8500 TCD - Boilers & Steam Turbine (13.5 MW cogeneration power plant) - Costing & Budgeting – Technical sourcing -Manpower management & Training - Workshop operations (Welding, Fabrication, Lathe, Milling, Shaper, Power Tools etc.) - Troubleshooting of equipment & leading day to day Breakdowns/Corrective actions. - Arranging spare parts inventory in store - Generating annual preventive maintenance plan and execution - Plant maintenance & shutdown of 8500 TCD - Boilers & Steam Turbine (13.5 MW cogeneration power plant) - Costing & Budgeting – Technical sourcing -Manpower management & Training - Workshop operations (Welding, Fabrication, Lathe, Milling, Shaper, Power Tools etc.) - Troubleshooting of equipment & leading day to day Breakdowns/Corrective actions. - Arranging spare parts inventory in store - Generating annual preventive maintenance plan and execution

    • Senior Shift Manager
      • Jul 2017 - Apr 2018

      - Smooth operations of complete sugar mill & Utilities 12000 TCD & (13.5 MW cogeneration power plant) - Troubleshooting during shifts – Downtime data recording & analysis - Ensuring Utility cost at minimum level - Modification of Economizer heating surface to from 170 m2 to 250 m2 of 60 TPH boiler & addition of cyclone to increase efficiency of ash removal system and fuel saving - Smooth operations of complete sugar mill & Utilities 12000 TCD & (13.5 MW cogeneration power plant) - Troubleshooting during shifts – Downtime data recording & analysis - Ensuring Utility cost at minimum level - Modification of Economizer heating surface to from 170 m2 to 250 m2 of 60 TPH boiler & addition of cyclone to increase efficiency of ash removal system and fuel saving

    • Shift Engineer
      • Jul 2015 - Jun 2017

    • Trainee/Assistant Engineer
      • Nov 2014 - Jun 2015

      - Successfully assisted Erecting of 100 TPH (2 Nos) D-Type water tube boiler (HMC) to ensure the availability of material and parts via BOM and indent during Erection- Installation of back pressure steam turbine 8 MW (02 Nos) Triveni, India.- Fabrication and Errection of feed water pipe line and steam pipe line according to isometric and piping plain drawings.- Successfully controlled treated water supply –RO plant operation by performing the proper treatment of boiler feed water including washout, boil out of boiler.- Productively supervised the maintenance and internal and external cleaning of boiler tubes.- Provided assistance in managing operation of bagasse fired boiler, observed safety, maintenance procedure and suggestive measures assures smooth workflow.- Receiving and managing the work orders.- Perfectively assisted scheduled maintenance of 8 MW impulse turbine - Planning and executing the annual plant shutdown activities- Perfectively supervised the maintenance of heat exchanger like tube plugging, bundle cleaning, mechanical cleaning (Scrapping, Roding) and plate type heat exchanger. - Assisted in installation of 80 TPH bagasse fired water tube boiler to meet the steam requirement for operation. Show less

Education

  • University of Engineering and Technology, Lahore
    Bachelor of Science - BS, Mechanical Engineering
    2009 - 2013
  • Punjab Board Technical Education Lahore
    Diploma Of Associate Engineer, Mechanical
    2004 - 2007

Community

You need to have a working account to view this content. Click here to join now