Muhamad Zulkiflli
Atex Inspector at K2 Energy Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Credentials
-
Lead QMS Auditor ISO 9001 :2015
Guardian Independent CertificationDec, 2019- Nov, 2024 -
IECEx Copc
IEC (International Electrotechnical Commission)Jan, 2020- Nov, 2024 -
CompEx Certification of Core Competence
UKASDec, 2017- Nov, 2024 -
Degree in Applied Science Physic Electronic & Instrumentation
Universiti Malaysia Terengganu -
IECEx 001,003,007&008
Ex Zon Sdn Bhd -
Process instrumentation & control technology
Pahang Skills Development Centre -
Siemens Simatic S7 300 (PLC)
Siemens
Experience
-
K2 Energy Group
-
Singapore
-
Oil and Gas
-
1 - 100 Employee
-
Atex Inspector
-
Jan 2021 - Present
-
-
-
Applus+ Angola
-
Angola
-
Oil and Gas
-
1 - 100 Employee
-
E&I Inspector
-
Dec 2019 - Jan 2021
-
-
-
Sapura Drilling
-
Malaysia
-
Oil and Gas
-
300 - 400 Employee
-
E&I Inspector
-
Mar 2019 - Nov 2019
• Conduct site inspection and ensure all electrical installations ensuring compliance with the design specifications, as per drawings and as per applicable standard. • To assist and coordinate with the sub-contractor to plan and control work activities in accordance with approved drawings, work methods/inspection & specification requirements etc. • Develop electrical equipment commissioning and site integration testing procedures. • Highlighting all discrepancies/anomaly detected during monitoring/inspection and informing the same to Supervisor. • Submitting a daily report to the OIM at the end of each day of work. • Loop Checking, Commissioning & Trouble Shooting. • Determine procedures for maintenance, installation, modification and repair of electrical equipment. • Observe functioning installed equipment or systems to detect hazards and need for adjustments, modifications, relocation or replacement. • Recommend procedure revisions when necessary to fully utilize assigned personnel and equipment. Show less
-
-
-
Bureau Veritas Group
-
France
-
Environmental Services
-
700 & Above Employee
-
E&I Inspector
-
Nov 2018 - Feb 2019
-
-
-
Tecnicas Reunidas
-
Spain
-
Engineering Services
-
700 & Above Employee
-
PL Coordinator(HANDOVER)
-
Jan 2018 - Nov 2018
General Duties: 1. Coordinate the task completion and punch list management, tracking and updating the master punch list database.(HCS SYSTEM) 2. Coordinate and follow up of material status in conjunction with the Supply Chain Coordinator making sure all specific punch lists associated with the delivered materials are being tracked, cross referenced and cleared. 3. Issuing of daily punch list progress reports & break down reports by discipline & material for the Construction Superintendents, Construction Manager and Commissioning Manager. 4. Actively involved in construction & commissioning activities identified for specific systems and sub systems in the work packages. 5. Responsible to send all cleared and outstanding punch list to their disciplinary and company on thrice in a weekly, and monthly basis, for push them to clear punch items on and before due dates. 6. Ensure all the walk down punch items should be capture by the input members and review them before sending CPL in use. 7. Make sure all SCM (System Completion Manual) dossiers must contains consolidate punch list after move to RFSU. 8. Generating punch list report daily, weekly, and monthly status for all subcontractors, contractors, top management, and client, also supporting other status reports such as Vendor, Engineering, As-built, Red Markup Drawings and day to day activities. Show less
-
-
-
Fulkrum
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
E&I Inspector
-
Jan 2017 - Oct 2017
General Duties: 1. Comply with applicable safety instructions and other Company procedures. 2. Make sure that assessments of safety, economic impact and technical importance are performed whenever required. Due diligence shall be observed and initiative taken to secure the best result. 3. Treat all information, both written and spoken, obtained in the course of the work with confidentiality. 4. Carry out work in compliance with: • Company values and policies • Relevant laws and regulations • Applicable contracts 5. Actively monitor quality related activities such as pre-installation checks, installation compliance, pre-commissioning checks and associated risks with each of these areas and ensure problem areas are identified, reported and closed out. 6. Timely completion of assigned projects and tasks. 7. Bring forward suggestions for improvements within the areas of responsibility. 8. Undertake any other work and responsibilities as per separate instruction. Specific Duties: • Visual inspection for complete and correct application/installation • QC related duties shall be monitored and related activities verified through inspections where applicable. • Review and Sign off on relevant ITP’s and check sheets for discipline activities. • Review company specifications, drawings, method statements, QC procedures and inspection test plans. Maintain daily reports and log of daily activities • Ensure monitoring/ surveillance activities are being conducted on an ongoing basis Mandatory fields of competence are: • Instrument/Telecommunication/Fire & Gas • Electrical • HVAC • ESD and SCADA • IP Protection • ATEX regulations • IEC regulations Show less
-
-
-
Yokogawa
-
Japan
-
Automation Machinery Manufacturing
-
700 & Above Employee
-
Service Engineer/Qc
-
Jan 2016 - Oct 2016
Electrical & Instrument construction Installation and Testing for FAT. Fabrication, Installation new analyzer house and testing activities as follows:- - Supervise for fabrication analyzer house activities work tasks. - Monitor and arrangement hot work & analyzer equipment installation . - Hot work activities for installation E&I structure & support. - Cable Pulling, E&I Installation for PWT Skid. - Oversaw the installation & testing of Electrical / Pneumatic Hook-Ups: Cable Routing, Laying, Segregation, Sealing, Termination & Grounding Insulation Resistance & Continuity tests, OTDR Tests (FOC) o Installation inspection of impulse tube, airline pneumatic air header as per hook-up and AFC Drawing & Inspection of pressure testing /leak test of all pneumatic lines, impulse lines. - Adroit with the concept of inspection on installation of Ex-equipments (Exd, Exe, Exi etc.) and associated accessories in potentially explosive hazardous atmosphere (IEC60079 – 14 & 17) - Accountable for witnessing Calibration, Installation, Loop Checking & Functional Tests of Pressure, Flow, Temperature, Level instruments, Analyzers, Control / On-Off Valves, Fire & Gas Instruments, etc. - Implementing Factory Acceptance Tests (FAT) - Review of all instrument accepted documents such as Instrument data sheet, vendor drawings, Instrument and Piping diagram with latest revisions, quality control inspection report documents signed by QC inspector and Owner representatives. - Responsible for punch list clearing to ensure that the installation of instruments are complete and accepted by the client Show less
-
-
-
Sapura Energy Berhad
-
Oil and Gas
-
700 & Above Employee
-
Instrument Engineer
-
Dec 2012 - Dec 2015
E&I construction for Installation commissioning and services, maintenance skids & hook up. Responsible for : - Supervised / monitor the progress of Electrical & Instrument construction : - Inspection for Electrical & instrument construction & support installation to meet client requirement - Field inspection with client & QC on punch list clearance for all non-compliance and final acceptance. - Inspection of electrical and instrument installation works, testing and commissioning. - Involved in electrical equipment installation, cable pulling and function Test. - Inspection of the electrical & instrument installation works, testing and commissioning, various testing, inspection and loop check - Prepare check sheet construction & commissioning for electrical & instrument discipline. - Compile check sheet for system start up and system handover - Monitor the E&I progress (fabrication and installation) activities as follows: - Cable Pulling, Field Instrument and Tubing Installation , Installation E&I devices - Tubing Pressure and Leak Test , Installation solar panel , Cable Ladder - Hot work activities for installation piping & structure - Mechanical activities installation pump skids & valve ,Drip pan & system drain - Preparation of MTO (Material Take Off), PR (Purchase Requisition) and TBE (Technical Bid Evaluation) for all E&I item required for onshore (yard) and offshore installation. - Involved in PDMS review for comparison of actual site observation with 3D Model (Platform). - Reviewed derivative issues / highlight probable deviations on IFC drawings and prepared the construction especially E&I progress monitoring report & activity breakdown schedule. - Planning work activity for cable pulling, panel installation and all Electrical and Instrumentation devices installation. - Working closely with commissioning team in regards of Power Up solar & RTU control CCR activity. Show less
-
-
-
-
Analyzer Technician
-
Jan 2012 - Aug 2012
- Checking gas analyzer (O2 analyzer) limit switch - Total Organic Carbons (TOC manually /daily inspection and change reagents) - Servicing and install analyzer equipment - Familiar color analyzer, Co2 analyzer, Gas chronographs. - Able to servicing AP panel - Remove, servicing the sample thief and install back - Cleaning pH panel (using buffer solution 4,7,10) - Doing maintenance activities for analyzer and instrumentation - Checking gas analyzer (O2 analyzer) limit switch - Total Organic Carbons (TOC manually /daily inspection and change reagents) - Servicing and install analyzer equipment - Familiar color analyzer, Co2 analyzer, Gas chronographs. - Able to servicing AP panel - Remove, servicing the sample thief and install back - Cleaning pH panel (using buffer solution 4,7,10) - Doing maintenance activities for analyzer and instrumentation
-
-