Experience

    • Construction
    • 1 - 100 Employee
    • chief surveyor / survey coordinator
      • Oct 2020 - Present

      1 LEMIRAGE FIT OUT Qatar Project Abu Hamour Shopping Village Position chief Surveyor/ Survey Coordinator Period Oct.2020 to until Responsibilities:- Working as chief Surveyor. It’s Qatar's largest Shopping village along with Services including infrastructure. Prepare the data for site work and data download from total station and G.P.S. Lay-out and setting out of vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout and electrical layout. To establish and maintain the control points. Lay out (setting out) of project. And Writing technical reports. Planning and overseeing building work. Control top level of slab and marking of block works. Take the as built of slab and submit to consultants. Show less

    • Qatar
    • Civil Engineering
    • 1 - 100 Employee
    • Chief Surveyor / survey coordinator
      • Feb 2017 - Oct 2020

      1 AL JABER MAKHLOUF CONSTRUCTION Qatar Project New Orbital Highway (NOH contract 3) Project B-RING ROAD (current project) Position chief Surveyor/ Survey Coordinator Period (Feb. 2017 to till now) Responsibilities:- A 10 lane of total length 42 kilometer, Highway project, including Truck Route with 5 junctions, under ASHQAL (Municipality of Qatar). As a senior surveyor my responsibilities. Prepare the data for site work and data download from total station and G.P.S Responsible for all control points with static method. Provided technical support to any other surveyors involved with each project. Ensured that all data from surveying expeditions was safely stored. Maintained an updated database of project. Dealing with consultant. Dealing with Design Department. Providing training for new Equipment to the surveyor. Quality control for survey work as well as accuracy. Closely following surveyor’ daily progress report Show less

    • Qatar
    • Construction
    • 100 - 200 Employee
    • Sr. Surveyor/ Survey Coordinator
      • Jun 2012 - Feb 2017

      Current Project: Mall of Qatar, Qatar. Working as Survey Coordinator at Mall of Qatar. Its Qatar's largest Shopping Mall along with Services including infrastructure. Prepare the data for site work and data download from total station and G.P.S. Lay-out and setting out of vertical and horizontal alignment of concrete column,footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanicallayout and electrical layout. To establish and maintain the control points. Lay out (setting out) of project. And Writing technical reports. Planning and overseeing building work. Control top level of slab and marking of block works. Take the as built of slab and submit to consultants. Show less

    • senior land surveyor
      • Jun 2012 - Sep 2013

      Project Lakhwiya Football Stadium duhail (infrastructure work) Position Sr. Surveyor Period June 2012 – Sep. 2013 Responsibilities I’ve worked in this project As Sr.Surveyor from june-2012 up to Sep. 2013. In this project I’ve worked on Infrastructure (Roads, 4500 Parking’s, Utility Services, 1 Service Building, 6 Substations, Land Scaping, Service Tunneling and Satellite Irrigation System), 1 Football Stadium, Multipurpose facility, Hotel, 4 Foot Ball Training Fields, 2 Changing Rooms n 1 Fitness Center Building. ...more Show less

    • Construction
    • 1 - 100 Employee
    • senior land surveyor
      • May 2010 - Jun 2012

      Project: AL Falah Abu Dhabi 730 villas) Position as Senior land Surveyor Period (may2010 to June 2012) Responsibilities Prepare the data for site work and data download from total station and G.P.S Excavation of Earthwork. Check and finalize construction drawing. Check the vertically of walls. Inspection with consultants. Advising clients about building. To establish and maintain the control points. Lay out (setting out) of project. And Writing technical reports. Planning and overseeing building work. Control top level of slab and marking of block works. Take the as built of slab and submit to consultants. Show less

    • United Arab Emirates
    • Civil Engineering
    • 1 - 100 Employee
    • Land Surveyor
      • Aug 2009 - Dec 2009

      Name of employer Al Manarah Consultant & Engineering Co. Musqut (Oman) Project Topographic Survey Position as land Surveyor ResponsibilitiesI’d worked with Al Manarah from June 2009 up to September 2009 on behalf of City Survey on design Surveying related with Sewerage Planning of diff. Cities as a Project Coordinator with client Haya. I have worked on topographic of these cities i.e. Madinath Al Sultan Qaboos, Madinath Al Aallam, and Madinath Al Qurum (Musqut). Show less

    • senior land surveyor
      • Sep 2005 - Dec 2009

      Name of employer AL Naboodha Project Jebal Ali airport, Dubai Position senior land Surveyor Responsibilities• Excavation of Earthwork.• Layout (setting out) of Runway Level mark of Embankment, Capping and ABC.• Setting out for asphalt and control level on runway, Taxi area.• Setting out Apron, Taxi way, Turn Pad area and Control Levelling.• Setting out of all approach Road and Accesses Road and Control Level.• Setting out Drain and Low flow swale Area and Control Level.• Setting out for secondary Duct Bank in Runway, Taxi, Apron, and Turn Pad Area.• Setting out For Man hole And hand whole And Light Points in Airport Area.• Setting out For AGL On Runway ,Taxi A,B,C, And Both Turn Pad• Establishment of Horizontal and Vertical control points for fixed reference using Total • Station and level. Show less

    • Land Surveyor
      • Apr 2007 - Dec 2007

      Name of employer CCC & Dutco Project Largest Dubai Mall- (Dubai)Position as land Surveyor Responsibilities Control top level of concrete. Establishment of Horizontal and Vertical control points for fixed reference using Total Station and level. Inspection of Control points and Joint surveys with sub- contractors. Piles Cut Level, Load Test of Slab with (DNA03 LIECA).Precise . levelling & as Built of slab. Setting out of Leis line marking. Supervising of Excavation and Concrete Piling Work.Lay- out of Grid lines and Axis for columns and footings. Lay-out and setting out of vertical and horizontal alignment of columns and footings, slabs, doors. Stairs Show less

    • Senior Surveyor
      • Oct 2002 - Apr 2005

      Name of employer Engineering Survey Consultants Project Different project in Punjab Position As land Surveyor Period October 2002 to April 2005 Responsibilities Topographic Survey Roads & Bridges Different Road Survey (National High. Survey Bench Marking Leveling & Traverse. Topographic Survey City Khan Pur. City, jaranwala city, sarray-alamgir city Preparation Detail Drawings in AutoCAD. and make the profile and X- session of road . Show less

    • United Kingdom
    • IT Services and IT Consulting
    • Senior Surveyor
      • Feb 2001 - Sep 2002

      Project Attack oil Refinery (Rawal Pindi) Position As land Surveyor Period February 2001 to October 2002 Responsibilities Data Collection & Processing. Cross Sectional & Longitudinal Survey Preparation Detail Drawings in Auto cad topographic Surveys. Survey of Pipe Line Oil Tank, Embankment & Other activities. Contouring, X-Section & Building Survey Contouring Survey (D.G.Khan) Contouring Survey 40,000 Acre. Project Attack oil Refinery (Rawal Pindi) Position As land Surveyor Period February 2001 to October 2002 Responsibilities Data Collection & Processing. Cross Sectional & Longitudinal Survey Preparation Detail Drawings in Auto cad topographic Surveys. Survey of Pipe Line Oil Tank, Embankment & Other activities. Contouring, X-Section & Building Survey Contouring Survey (D.G.Khan) Contouring Survey 40,000 Acre.

Education

  • Preston University
    Bachelor degree in Civil Engineering Technology
    2011 - 2016
  • hamad hassan polytechnical college (lahore pakistan)
    3 years Diploma of Associate Engineer in (Civil)