Mubashar Ilyas
Production Planning Engineer/Project Manager at Heavy Mechanical Complex (HMC)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Heavy Mechanical Complex (HMC)
-
Mechanical Or Industrial Engineering
-
100 - 200 Employee
-
Production Planning Engineer/Project Manager
-
Oct 2015 - Present
Taxila Pakistan •Study drawing/BOQ and prepare BOM for procurement in liaison with Supply Chain Management (MRP). •Assigning tasks as per drawing requirement (Routing) to shops (Fabrication, Machine, Assembly & Casting/Forging). •Responsible for issuance of Job/Work order for Production to different shops depending upon nature of work to be done. •Getting approvals for urgent materials, shop drawings, and technical proposals. •Preparing technical proposals for shop problems and sending to the… Show more •Study drawing/BOQ and prepare BOM for procurement in liaison with Supply Chain Management (MRP). •Assigning tasks as per drawing requirement (Routing) to shops (Fabrication, Machine, Assembly & Casting/Forging). •Responsible for issuance of Job/Work order for Production to different shops depending upon nature of work to be done. •Getting approvals for urgent materials, shop drawings, and technical proposals. •Preparing technical proposals for shop problems and sending to the design for approval. •Reviewing drawings and modifying any item that may be changed to be done quicker, and to avoid any production mistakes for not repeating the job. •Responsible for generation of Weekly and Monthly Look-ahead plans to keep project stick to the Plan. •Responsible for generating Daily, Weekly and Monthly Progress, Top Sheets, Executive Summary and Bottleneck reports to keep the Top Management up-to-date. •Planning with Chief Operating Officer and GM Works (Production) the goals to be achieved and scheming how to drive all parties to the same direction. Show less
-
-
-
-
Junior Engineer
-
May 2014 - Sep 2015
Islamabad Planning and designing methods to improve production processes and minimize rejection. Reviewing existing processes and developing solutions to increase productivity and reduce costs. Ensuring compliance with approved production methods and quality standards. Performing Internal audit and maintaining Quality standards. Reporting to Manager.
-
-
-
-
Internee
-
Jan 2013 - Oct 2013
Worked as Project Group Leader at Dadex Eternit, Karachi Pakistan from Jan 2013 to Oct 2013 Key tasks included Reduction in manufacturing Cost by removing waste from different processes like Material Handling, Inventory Control, Time and Motion Study, Production Planning and Control & Quality Control.
-
-
-
-
Internee
-
Dec 2012 - Dec 2012
Karachi To Design The Housings of Switch-Gear using Auto-CAD Software. To study different working departmental aspects of an Industry.
-
-
Education
-
NED University of Engineering and Technology
Bachelor of Engineering (B.E.) -
University of the Punjab, Lahore
Bachelor's degree