Moushumi Biswas

Lead Electrical Engineer at F&C Engineers
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Lead Electrical Engineer
      • Aug 2019 - Present

      • Supervising, planning, organizing, and coordinating Engineering activities and deliverables schedule for electrical suppliers, and subcontractors to meet deadlines. Coordinated with the multidisciplinary project engineering team. • Developed schedules for technical deliverables, coordinate related activities and ensuring that overall efforts are as per expectation of customer and Company requirements, ensuring timely deliverables. • Approved purchase requisitions for technical compliance, i.e., contract materials and services, quality assurance and control requirements. • Maintain close contact with customers and project participants to identify and resolve issues of mutual concern and to seek opportunities for additional business. • Designed and sizing electrical equipment and performed required calculation. • Managed project risks to avoid penalties, warranty repairs or other charges that may have substantial financial impact to the company. • Mentoring and providing technical direction to other engineers and reviewing their works and activities. • Prepared Single Line Diagram based on load calculation and system study. • Attended Factory Acceptance Test (FAT) for all electrical equipment including switchgears, power, and distribution transformers. • Performed audit along with the quality team for various electrical equipment. • Regularly meet and correspond with clients and vendors. • Supervise or perform load flow, short circuit, motor starting, and arc flash studies. • Manage a cable schedule by interacting with controls engineers. • Write specs to purchase electrical equipment.

    • Oil and Gas
    • 700 & Above Employee
    • Principle Electrical Engineer
      • Dec 2014 - Mar 2018

      • Prepared Single Line Diagram based on load calculation and system study. • Prepared Duct Bank, Load Flow, Short Circuit and Motor Starting Analysis, Arc Flash reports using ETAP • Attended Factory Acceptance Test (FAT) for all electrical equipment including switchgears, power and distribution transformers. • Performed audit along with the quality team for various electrical equipment. • Prepared wiring diagrams, interconnection diagrams, reviewed cable schedule, equipment layouts, grounding and lightning protection layout. • Prepared datasheet for medium voltage switchgear, bus duct and Motor Center Control (MCC).Prepared typical I/O list/Alarm List of Electrical Switchgear, MCCs for hook-up with DCS, PMS. • Coordinate all free issue equipment vendor drawings, FATs, and deliveries to Powell as well as coordinate Powell needs from the free issue equipment. • coordinate any field inspection activities required • Issued Area classification for over all plant. • Issued all Project Deviation note (PDN), In charge of man hours estimation, Monthly project progress report update with milestone updates.

    • Oil and Gas
    • 700 & Above Employee
    • Senior Electrical Engineer
      • Jan 2010 - Dec 2014

      • Supervised, planned, organized and coordinated Engineering activities and deliverables schedule for electrical suppliers, subcontractors to meet deadline. Coordinated with multidisciplinary project engineering team. • Sized, selected, specified major electrical equipment such transformers, distribution transformers, NGRs, Arc resistant medium and low voltage switchgears (13.8kV and 4.16kV), DC & UPS Systems, MV & LV MCCs, • Prepared bid documents for major electrical equipments, performed techno-commercial bid evaluation culminating into issue of PO, reviewed vendor design/documents, assisted procurement during delivery and order execution. • Inspected for workmanship and quality of fabrication, supervision of equipment installation & wiring of the substation Complex. • Prepared scope of work, pricing labor and materials, vendor management, change order processes, document control for the projects. • Estimated materials take off for each Engineering Work Package, calculate Unit Price and prepared bill of quantities. • Participated Bid Clarification Meetings and respond to Bid RFI's from electrical contractors. • Analyzed and performed voltage drop calculations, DC and AC UPS Load Studies, Battery bank sizing calculations, rectifiers and UPS systems. • Conducted AC and DC Load studies, determined size of battery bank. • Analyzed and performed protection coordination, short circuit and load flow studies. • Extensively worked in hazardous area classification Class 1 Div 2 Group C, D areas.

    • Canada
    • Construction
    • 1 - 100 Employee
    • Senior Electrical Engineer
      • Jul 2006 - Sep 2009

      • Supervised, planned, organized and coordinated Engineering activities and deliverables schedule for electrical suppliers, subcontractors to meet the deadline. Coordinated with multidisciplinary project engineering team. • Sized, selected, specified major electrical equipment such transformers, distribution transformers, NGRs, Arc resistant medium and low voltage switchgear (13.8kV and 4.16kV), DC & UPS Systems, MV & LV MCCs, Prepared bid documents for major electrical equipment, performed techno-commercial bid evaluation culminating into the issue of PO, reviewed vendor design/documents, assisted procurement during delivery and order execution.

    • Electrical Engineer
      • Mar 2003 - Jul 2006

      Analyzed & prepared 13.8kV, 4.16kV, 480V Single Line diagrams, protection and control single line diagrams. Reviewed and remarked vendors’ drawings for SWGR, MCC and various process equipment. Analyzed & performed load calculations & prepared load list. Calculated equipment sizing and performed equipment selection (transformer, switchgear, MCC etc.) Analyzed & prepared grounding layouts and typical grounding details based on grounding study done by 3rd party for Pile/Structural, Process Skid, Fence, electrical equipment. Prepared hazardous area classification drawings, cable schedules, cable tray layouts, outdoor directly buried cable route layout, Panel Schedules for LV power and lighting distribution panels. Analyzed & prepared interconnection/termination drawings for SWGR/MCC for various vendor-supplied process equipment packages/skids.

  • (ATI) American Technologies, Inc.
    • Markham, Ontario, Canada
    • Test Engineer
      • Dec 2000 - Mar 2002

      Responsible for in-depth fault analysis, electrical analysis, verification on ATE (Automated Test Equipment). Digital & Analog signals analysis, analog to digital converters. Responsible for in-depth fault analysis, electrical analysis, verification on ATE (Automated Test Equipment). Digital & Analog signals analysis, analog to digital converters.

  • Celestica International Inc
    • Toronto, Ontario, Canada
    • Production Assistant
      • Mar 2000 - Dec 2000

      • Responsible for the in-circuit test of Controllers, Complexers, mother Boards, NVRAMS. • Responsible for the in-circuit test of Controllers, Complexers, mother Boards, NVRAMS.

    • Electrical Engineer
      • Jun 1998 - Dec 1999

      • Performed protection coordination, short circuit, and load flow studies. Conducted AC and DC Load studies, determined the size of the battery banks, rectifiers, and UPS systems. • Analyzed and prepared a single line diagram, AC schematics, and DC control schematics for MV/LV switchgear, MCCs. Prepared cable schedule, interconnection and termination drawings, interface with DCS and SCADA for field construction. • Prepared switchgear room layout, outdoor switchyard general arrangement drawings, earthing layout, power and control cable route layouts, cable tray layout and typical construction details. Designed LV building services distribution.

Education

  • Binoba Bhabe University
    Bachelor of Technology - BTech, Electrical Engineering

Community

You need to have a working account to view this content. Click here to join now