Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Design
    • 1 - 100 Employee
    • Founder
      • 2013 - Present
    • United States
    • Advertising Services
    • 1 - 100 Employee
    • Lead Electrical Engineer
      • Jan 2019 - Dec 2020

      Projects: Woodside (Pluto): Pluto-NWS Interconnector Project Woodside (KGP): NWS EARLY ORO Project The Pluto-NWS Interconnector is intended to unlock incremental value for both Pluto and Karratha LNG plants by facilitating the acceleration of Pluto area reserves by installing a pipeline connection between the two LNG Plants. The Pluto-NWS Interconnector tie-in at both Pluto plant and KGP plant were subject of two separate projects. The project started with FEED, continued with detail design and procurement. KGP end was delivered in EP (brownfield) format. My responsibility as electrical discipline lead at Worley was to develop engineering deliverables for these two projects. Four designers and a graduate engineer under my supervision helped me to execute the engineering phase of the project. I was responsible for electrical packages to be delivered within the scheduled time. Around 150 deliverables developed and issued during engineering phase of the project. Show less

    • France
    • Recreational Facilities and Services
      • Jan 2017 - Dec 2018

      Project: INPEX - Offshore FPSO Facility - Alarm Management CampaignI was seconded to INPEX offshore commissioning team as a consultant engineer. I was Lead on the offshore alarm management campaign to review facility standing alarms on daily basis to determine what action is required, coordinate the efforts across teams, drive efforts to reduce the standing alarms KPI, and to provide support to reduce other alarm KPIs for flooding and frequency. Provided detailed technical direction to Inlec technicians as well as proposing and developing ICSS changes for implementation by LTSA engineers. This included development and implementation of additional suppression schemes, setpoint changes and logic changes as appropriate. Had close cooperation with facility MTL, PTL and start-up superintendent, and participated in risk assessment workshops to verify subsystems start-up readiness. Project: Offshore Platform Goodwyn-A DCS MigrationAs part of an integrated Woodside and Honeywell FAT team, delivered Factory Acceptance Test for the control system to validation integration of DCS migrated from ABB infi90 to Honeywell Experion PKS. I was seconded to Woodside commissioning team as a consultant and commissioning engineer. Project: Woodside OT GovernancePerformed Cyber Security Risk Assessment for integrated control and safeguarding systems (ICSS) for Woodside operated gas plant facilities. The outcome of risk assessment was cyber Security Level (SL1 to SL4) requirements based on IEC 62443 for each system. The security level requirement is determined by probability of cause, and extend of safety, environmental and commercial consequences. High risk systems are defined as critical systems. “ICSS Critical System Recovery Plans” delivered, documented actions and procedures must be taken in case of an incident of cyber-attack. In addition, “Continuity Plans” delivered addressed actions required to keep system integrity. I delivered risk assessments as an advisory consultant. Show less

      • 2017 - 2017

      The project was in Oil & Gas sector delivered part of Construction Management.- Compiled construction job cards/workpacks;- Provided constructability inputs into engineering design where appropriate to assure constructability aspects of design have been achieved;- Had HSE inputs to workpack; and- Ensured deliverable quality has been produced.

    • Snr Control Systems Engineer
      • Jan 2016 - Dec 2016

      Project: Pilgangoora Lithium Plant The project was defined in Mining sector in EPCM format. Altura Mining Pilgangoora Lithium Project is located at Pilgangoora WA. It is planned to develop infrastructure to commence mining and processing of 1.4Mtpa of ore to produce approximately 215,000 tonnes of lithium spodumene concentrate per annum. As a team lead, I was responsible to design and develop Process Control System (PCS) based on Schneider Modicon 580 PLCs. Five PLCs implemented in total. I used Unity Pro to program the PLC’s (1500 IOs). Wonderware software was utilized for SCADA system and used for creating HMI pages. I assisted with the improvement and continuing development of the project and had effective coordination with client technical and commercial teams. VSD (Schneider type ATV600) and motor control units (Schneider type T-sysT) configurations and their connections to PLC was part of delivered project. Show less

    • Oil and Gas
    • 700 & Above Employee
    • Electrical Field Engineer - EEHA Completion
      • Jan 2015 - Dec 2016

      APLNG project proposed to develop a world scale LNG facility at Curtis Island. The foundation project included two trains, using Conocophillips cascade technology, each producing approximately 4.5 Mtpa of LNG. I Involved in this project as EEHA filed engineer, and delivered tasks below to accomplish EEHA requirements. • Had surveillance of activities during EEHA inspections • Checked and signed off equipment Hazardous Area Conformity forms (HACs), completed by EEHA inspections, to ensure compliance with AS/NZ 60079 standards • Compiled EEHA inspection workpacks • Kept EEHA dossier updated and complete • Compiled Audit workpacks, and handed over to EEHA auditor • Delivered Intrinsic Safety (IS) calculations • Delivered Max Dissipation Power (MDP) calculations • Verified installation and commissioning ITRs • Reviewed MDR documentation to ensure testing requirements are in place as per Australian standards • Had effective coordination and communication with filed engineers from other disciplines, and with EEHA auditor team, to expedite the job completion Show less

    • France
    • Oil and Gas
    • 700 & Above Employee
      • Jan 2013 - Dec 2014

      Project: Wheatstone LNG Plant - OnslowWheatstone Project included an onshore facility located in Onslow WA, Pilbara region. The foundation project included two LNG trains using ConocoPhillips cascade technology with a combined capacity of 8.9 million tonnes per annum. I was seconded to Chevron commissioning team as a consultant engineer as functional safety assessor. - As part of an integrated Chevron and Bechtel commissioning start-up (CSU) team delivered Validation of installation and commissioning of Integrated Control and Safeguarding System (ICSS) to support Completion and hand over to Operations;- Performed verification of design for all critical components of Safety Instrumented Functions (SIFs), and accordingly, checked conformity of installed equipment; and- Checked completion of installation and commissioning ITRs to assure compliance in accordance to safety requirements. Project: AnaeCo - Shenton Park Advanced Waste Treatment Plant Project involved the design, construction and commissioning of a 60,000 tpa AnaeCo™ Plant at Shenton Park WA. I involved in this project as a control and functional safety engineer seconded to the AnaeCo engineering team. The project was in Resources sector in EPCM format. - Delivered Modification, Commissioning, FAT and SAT of Process Control System (PCS) ABB 800xA;- Delivered Modification, Commissioning, FAT and SAT of Safety Instrumented System (SIS) PILZ PSS 4000;- Ensured installation and commissioning compliance in accordance to project specifications and local regulations;- Had responsibility of Maintenance, Change Management and Validation of SIS Modifications;- Assisted with project improvement, continuing development and delivered Annual Proof Test Procedures; - Delivered SIL Verification documents for modified SIFs; - Managed completion of SRS (Safety Requirement Specification); - Had effective participation in HAZID studies; Show less

      • 2011 - 2013

      Projects: • Cliff Head offshore facility upgrading project (ROC Oil Company)• Mondarra metering station project (DBP)• Macedon Inlet Station project (DBP)• Yarraloola compressor station upgrading project (APA Group)• Paraburdoo compressor station upgrading project (APA Group)• Delivered power studies for an offshore facility (ROC Oil Company), and two gas compressor stations (APA Group) • Prepared GEA (Gas Engine Alternator) test instructions and performed the test (APA Group)• Electrical calculations, sizing and specifications (Medium Voltage/Low Voltage)• Performed hazardous area classification and design (two gas compressor stations, APA Group and a gas metering station, DBP)• Performed intrinsic safety (Ex i) and power dissipation (Ex e) calculations• Assist with the improvement and continuing development of the project• Participated in HAZOP study • Provide constructability input into engineering design where appropriate• Provide stand-in cover for construction team leader as required• Provision of construction input to workpacks to ensure a quality deliverable is produced • Assure constructability aspects of design Show less

    • Lead Electrical Engineer- Client Representative
      • 2007 - 2011

      Involved in engineering, construction and commissioning of a new cement plant to produce 1M tonnes of cement per annum. The project also included 15km power transmission (63 kV) overhead line, to connect plant HV substation to Zanjan regional power network. As a lead EC&I engineer - client representative , I was responsible for implementation of electrical systems and control systems, and was reporting directly to project manager. My main responsibility was chasing suppliers and contractors for their contractual obligations. I had effective participation in project meetings in supplier’s offices in Germany, Switzerland, Iran and Thailand, to determine project commercial guidelines, and clarify technical requirements. The main suppliers to whom I dealt with were TKF (main crusher and blending bed), Pfeiffer (raw material and clinker roller mills), LVT (preheater and kiln), IBAU (material silos), and ABB (6.6kV high voltage drives, and plant control system). I based in construction job site for 4 years, and had cooperative effort and effective relationship with main EPC contractor (Oxin Sanat) project team. • Had constructive communication with Zanjan region authorities, to grant license for connection to the 63kV regional power network • Assist with the improvement and continuing development of the project, to ensure a quality deliverable is produced • Provided Constructability Reviews, to assure constructability aspects of design • Reviewed and signed off completed E, I & C engineering package delivered by EPC contractor for entire plant • Reviewed and signed off engineering package delivered for 15km power transmission overhead line (63kV) • Performed Technical Bid Evaluation and vendor documents review • Witnessed FAT and SAT for 63kV, 30MW transformers • Witnessed FAT for overhead line insulators • Delivered implementation of protection and interlocking settings of high voltage (63kV) substation Show less

    • Azerbaijan
    • Banking
    • 700 & Above Employee
    • Control System Engineer
      • 2004 - 2006

      Tehran Cement plant is located at Tehran, Iran. The Project involved construction of a new production line to produce additional 1M tonnes of cement per annum. I involved in this project via ABB company, delivered development and implementation of main process control system using 800xA platform. I based in ABB office in Baden Switzerland for six months, to accomplish system hardware design, coding and FAT. Then moved to the project job site to support commissioning team. • Developed plant Wiring Diagrams and Instrument Loop Diagrams in format of ABB documentation known as Consumer Circuits • Developed control network architecture and hardware design, based on 800xA platform, implemented AC800M Controllers, Connectivity Server and Aspect Serve • Developed code using ABB Control Builder (5000 IOs) • Developed HMI pages using ABB Graphic Builder • Delivered FAT witnessed by representatives from Pfeiffer (supplier of Roller Mills), FLSmidth (supplier of Preheater and Kiln), and client • Delivered commissioning and startup support, involved in loop tests, first-start, group-start and optimization. • Assisted with SAT • Performed as-built and drawing markups Show less

    • Electrical Engineer
      • 2000 - 2004

      Project: Pars Carbon Black Project EPC Project proposed to double carbon black production at its plant in Saveh Iran, to 30k tonnes per annum. The project was defined in chemical and resources in EPC format. - Delivered electrical calculations, sizing and specifications - Prepared documentation for electrical packages for procurement - Performed Technical Bid Evaluation, and vendor documents review for packaged units - Prepared P&IDs, Instrument Installation Hook up Drawings and Datasheets Show less

Education

  • Sharif University of Technology
    Masters, Electrical Engineering - Control
    2000 - 2002
  • K. N. Toosi University of Technology
    Bachelors, Electrical and Electronics Engineering
    1996 - 2000

Community

You need to have a working account to view this content. Click here to join now