Morné Van Heerden

Project Engineer Waterbouw at Ingenieursbureau van de gemeente Amsterdam
  • Claim this Profile
Contact Information
Location
Amsterdam, North Holland, Netherlands, NL
Languages
  • Afrikaans Native or bilingual proficiency
  • English Native or bilingual proficiency
  • Dutch Professional working proficiency

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Tasneem Vawda

Working alongside Morné was a pleasure. He always strived to learn from others and impart skills to engineers around him. He has a wealth of technical knowledge and is astute in his communication, interpersonal relationships and self-management. He is passionate about his work and goes the extra mile to improve outcomes and processes.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • AutoCAD Civil 3D: Site Design
    LinkedIn
    Nov, 2018
    - Sep, 2024
  • Construction Change Orders
    LinkedIn
    Nov, 2018
    - Sep, 2024
  • Construction Management: Project Delivery Methods
    LinkedIn
    Nov, 2018
    - Sep, 2024
  • Professional Engineer
    Engineering Council of South Africa & Washington Accord
    Apr, 2018
    - Sep, 2024
  • GPI
    eX:plain
    Jul, 2023
    - Sep, 2024

Experience

    • Netherlands
    • Civil Engineering
    • 500 - 600 Employee
    • Project Engineer Waterbouw
      • Nov 2021 - Present

      Strandeiland - Ijburg Fase 2 en Zeeburgereiland - Waterplein Sluisbuurt • Technisch projectleider voor de maaiveldinrichting van Makerskade. • Raakvlakmanager voor de Makerskade kademuur. • Ontwerpleider van de zuidelijke natuurbaai en het opstellen van het voorontwerp (VO) en detailontwerp (DO) tekeningen (met Revit, Navisworks, Autocad en Civil 3D als ontwerpsoftware) . • Het schrijven van een RAW Bestek voor Strandeiland met betrekking tot de Zuidelijke natuurbaai voorbelasting (Enkelvoudig aanbesteding). • Verificatie en Validatie van het project met betrekking tot normen en standaarden-Relatics. Werkinstructies - Revit integratie met Projectwise • Testen van de integratie van Revit binnen Projectwise. • Maken van workflows voor andere gebruikers in Miro, met films die de procesflow illustreren van het gebruik van Revit binnen Projectwise. • Ondersteunen bij het oplossen van foutmeldingen op de TGW's voor alle voorbereiders. Kennisnetwerk voor voorbereiders • Voorzitter van het kennisnetwerk. Plannen van evenementen, sprekers en werkgroepen om kennis uit te wisselen tussen alle voorbereiders. Show less

    • Belgium
    • Leasing Real Estate
    • Civiele techniek en Projectleider
      • Nov 2019 - Oct 2021

      Hoofdtaken binnen de functie • Projectleiding met betrekking tot de realisatie van één of meerdere projecten in grond-, weg- en riolering. • Opstelling van haalbaarheidsstudies, conceptontwerpen, detailontwerpen, kostenramingen en schrijven van bestekken (volgens SB 250 v4.1) met calculatie. • Modellering van Infiltratie- en-berging mogelijkheden. De projecten waar ik aan gewerkt heb zijn: Infrastructuur projecten • De Drij Dreven - Riolering en wegontwerp (Aanbestedende overheid: FLUVIUS, Medeopdrachtgever: AQUAFIN) • Adriaan Lodewijk, Klauw, Kerkhoven en Creftelbosstraat - Riolering en wegontwerp (Bouwheer: AQUAFIN) • Statiestraat en Watermansstraat - Riolering en wegontwerp (Bouwheer: AQUAFIN) • Driesstraat - Riolering en wegontwerp (Bouwheer: AQUAFIN) • Orgelwinningstraat - Riolering en wegontwerp (Bouwheer: FLUVIUS) • Breilaarschansweg - Riolering en wegontwerp (Bouwheer: FLUVIUS) • Grotestraat en Vondelweg - Riolering en wegontwerp (Bouwheer: FLUVIUS) • Kleinstraat - Riolering en wegontwerp (Bouwheer: FLUVIUS) • Kortenaken - Riolering en wegontwerp (Bouwheer: AQUAFIN) • Koningsbos - Wegontwerp (Opdrachtgever: Gemeente Bekkevoort) Verkavelingen • Manheuvels FASE II - Geel // Provincie Antwerpen • Deggersveld - Diest // Vlaams-Brabant Afgeronde opleidingen: 1) Pavement design - Maccaferri Africa 2) Hydraulic works - Maccaferri 3) Introduction to Soil Reinforcement and Case Histories - Maccaferri 4) Rockfall Mitigation design - Maccaferri 5) Droogtebestrijding - ie-net 6) Sirio Software Opleiding - Sumaqua 7) Opstellen van bestekken - Vlario 8) Projectleider Riolerings-en infrastructuurwerken - Vlario Show less

    • South Africa
    • Civil Engineering
    • 1 - 100 Employee
    • Senior Civil Engineer
      • Nov 2018 - Nov 2019

      • Hydraulic design Engineer for the National Road Upgrade (SANRAL) Four river crossing bridges and three large portal culverts on a 55km road. • Project Engineer for Alexandra Single Quarters: Repairs and Maintenance Contract (Total Value of Engineering Work - ZAR 8 million). This included: a) Coordinated with engineers in other disciplines and architects in the development of critical engineering solutions. b) Provided civil engineering expertise and support for civil construction engineering problems. • Project Engineer for Roodepoort CBD Transit-Oriented Development Consortium of Engineers (Total Value of Engineering Work - ZAR 2.5 million). This included: a) Project Managed engineering services for a multidiscipline engineering team (Civil and Structural, Mechanical and Electrical). b) Compiled the scope of works for surveyor and wayleave applications. c) Performed civil design checks on the stormwater, road and earthwork designs. • APP assistant and Project Engineer on the Second Dam Safety inspection for Steve Tshwete Municipality. a) Compiled Dam Safety Reports for Category 2 dams (5m to 12m wall height, Hazard potential rating of High) : Athlone Dam, Kruger Dam and Pienaar Dam. • Proposal manager for multiple tenders. • Mentored junior engineers and draughtsmen in Autodesk Civil 3D. Show less

    • Australia
    • Mining
    • 700 & Above Employee
    • Infrastructure Design Engineer
      • Apr 2018 - Nov 2018

      Lead Design Engineer for the following Projects: • Design Phase of Waterberg Platinum Mine - Limpopo (South Africa), and • Feasibility Phase of Der Brochen Platinum Mine - Limpopo (South Africa). Infrastructure Engineer on the following Projects: • Execution Phase of Nokeng Fluorspar Mine - Limpopo (South Africa), • Design Phase of Kamoa Copper Mine - Katanga (DRC), • Design Phase of Lesego Platinum Mine - Limpopo (South Africa), • Execution Phase of Nexus Gold Mine - Gauteng (South Africa), • Execution Phase of Ngezi Platinum Mine - Mashonaland West Province (Zimbabwe), • Feasibility Phase of Tri-K Gold Mine - Kankan (Guinea), and • Design Phase of Lubambe Copper Mine - Chililabombwe (Zambia). Tasks included: • Earth embankment Pollution Control Dam design: a) Waste classification with HDPE lining and clay lining design. b) Concrete spillway design. c) Silt settling pond design. • Stormwater management: hydrology, bridge hydraulic design, erosion control, channel size and lining designs, stormwater berm design, culvert design, culvert erosion protection, gabion drop structures and gravity walls. • Road designs with geometric layout design (Includes traffic assessment, stormwater design and parking layouts). • Potable water, fire water, sanitary system, raw water and service water pipeline designs. • Terrace, grading and bulk earthwork design. • Retaining wall, gabion gravity wall and RidgeBlok, TerraceBlok, Waterloffel wall design. • High water pressure system design for fire, stormwater and potable water (Pump design included). • Compiled tender drawings and bill of quantities. All modelling was completed in AutoCAD Civil 3D and Infraworks. Show less

    • Utilities
    • 700 & Above Employee
    • Lead Discipline Engineer and Package Lead on Underground Utilities for Kusile Power Station
      • Mar 2017 - Mar 2018

      • Managed site meetings with clients, engineers and contractors to clarify a broad range of construction and engineering issues. This included the fire water, raw water and potable water pressure system, sewage system and underground networks of dirty and clean water.• Reviewed and commented on trench designs and a wetland pile design.• Assessed the sustainability and environmental impact of projects.• Managed construction activities, conducted site inspections and ensured quality control procedures were complied with (SHE, OHSA, NEMA and ISO 9001 and 14001).• Monitoring of construction activities and progress, while ensuring adherence to procedures, specifications and applicable design codes.• Evaluated contract specifications and requirements.• Conducted handover of all underground works to the client.• Manage existing and new task orders.• Compiled job specifications and conducted tender evaluations.• Managed project resources (engineers, surveyors and draughtsman), project schedules, budgets, progress reports and mentoring of younger engineers. Show less

    • Package Lead for Bulk Material Handling Structures
      • May 2016 - Feb 2017

      • Supervised civil works on the Bulk Material Handling Structures.• Provided civil engineering expertise and support on Water Management.• Designed access control infrastructure, whiles considering National Key Point Standard.• Appointed as an environmental safety engineer on all erosion and water management.• Ensured compliance certificates were issued by the Department of Water and Sanitation (DWS) and Department of Environmental Affairs (DEA).• Resident Engineer on contractors lay down area stormwater management design. Show less

    • Design Engineer
      • Jun 2014 - Apr 2016

      • Designed the stormwater and internal access roads at Komati Power Station.• Designed the access road culverts on the Concentrated Solar Panel (CSP) plant. Issued the work's information report, bill of quantities and drawings.• Inspected Kusile Power Station stormwater manholes.• Designed the stormwater system for the contractor's lay down area. This included: channel lining, Gabion drop-structure, a 3 m Gabion retaining wall with stability analysis (GEO5), attenuation dam, erosion management, road design, reinforcement and concrete design of wing walls, and a concept design of a 5 m deep attenuation earthfill embankment dam.• Investigated the pollution control dam leaks at Kusile and Medupi Power Station and advised on remedial works required.• Designed the infrastructure of Medupi Power Station Substation North.• Researched small hydropower locations in South Africa.• Completed and issued detailed design drawings, design reports, design calculations and cost estimates.Wrote the Eskom Specifications on Dam Inspections and Dam Design Standards. Show less

    • Engineer in Training
      • Feb 2013 - May 2014

      • Conducted site inspections to ensure adherence to engineering standards, design and specifications. This included: concrete pour and repair monitoring, drilling and pressure grouting, blasting and rock support inspections, shotcrete placement and rock bolt installation.• Designed a new stormwater channel, recalculated the post-tensioning of the Surge Shafts, designed and conducted a cable trench re-aligning, designed a substation embankment.• Reviewed and commented on method statements, drawings and laboratory results. Compiled weekly and monthly feedback reports, bill of quantities and payment certificates.• Issued defect notifications and site instructions. Show less

    • South Africa
    • Higher Education
    • 700 & Above Employee
    • Junior Design Engineer
      • Feb 2011 - Jan 2013

      Tanjung Bin Power Station Study in Malaysia (2013) • Captured data from the intake estuary to simulate sediment movement in Mike 21: Hydro-dynamic and sedimentation two-dimensional model. • Retrieved sediment monsters on 18 pre-determined sites during this expedition. • Retrieved ADCP flow velocity profiles on 18 other pre-determined sites, including the suspended sediment load, bedload samples, TDS and Castaway measurements. Berg River Abstraction Feasibility Study (2011) • Completed and issued the Hydrology and Flood analysis for the 1:2, 1:10 and 1: 100 year floods. • Simulated a two-dimensional Hydro-dynamic and sediment movement (CCHE 2D) model on the Berg River abstraction proposed positions. • Designed the abstraction works with a crump weir, compiled the feasibility report, layout drawing and orientation of the abstraction structure for minimal sediment abstraction. MPR (Mitchell’s Pass River) Abstraction Work Feasibility Study (2011) • Conducted a one-dimensional analysis (Mike 11) on the possible abstraction works and crump weir designs. • Designed the abstraction works and compiled the feasibility report, layout drawings and hydraulic calculations. Show less

Education

  • Stellenbosch University/Universiteit Stellenbosch
    Master of Engineering (MEng), Hydraulic Structures and Sedimentation
    2011 - 2012
  • Stellenbosch University/Universiteit Stellenbosch
    Bachelor of Engineering (BEng), Civil Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now