Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Michael Peters

Morgan is a very capable individual with many areas of expertise and an asset to whomever he works with

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Optimizing a Website for Google Search
    Coursera
    Mar, 2023
    - Oct, 2024
  • Google SEO Fundamentals
    University of California, Davis
    Feb, 2023
    - Oct, 2024
  • The Fundamentals of Digital Marketing
    Google
    Jan, 2019
    - Oct, 2024
  • NACE CIP 1
    NACE International
    Sep, 2017
    - Oct, 2024

Experience

    • Australia
    • Advertising Services
    • 1 - 100 Employee
    • Co-Owner
      • Aug 2020 - Present

      I own and operate Grand Cru Digital with my wife, we offer SEO and Google ads services to clients across Australia. I own and operate Grand Cru Digital with my wife, we offer SEO and Google ads services to clients across Australia.

    • Australia
    • Engineering Services
    • 700 & Above Employee
    • Painter
      • Mar 2018 - Aug 2020
    • Brazil
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Senior Technician
      • Oct 2016 - Feb 2018
    • United Kingdom
    • Facilities Services
    • Boat Builder
      • Apr 2015 - Oct 2016
    • Supervisor Technician
      • Apr 2012 - 2015
    • Supervisor
      • 2012 - 2015
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Composite Laminator (Contract position)
      • Jan 2012 - Mar 2012

      Production laminating of automotive parts, modular units offered to vehicle manufactures. Production laminating of automotive parts, modular units offered to vehicle manufactures.

    • Production Manager
      • Apr 2009 - Jun 2011

      Planning, coordination, production and quality control for the company. Direct management of the 22 staff. Ensured products are of high quality, cost effective and produced efficiently. Liaised with clients and suppliers on a day-to-day basis ensuring that at all stages of the production cycle they are satisfied and up to date with important information. Provided technical information and engineering knowledge to the design team. Planning, coordination, production and quality control for the company. Direct management of the 22 staff. Ensured products are of high quality, cost effective and produced efficiently. Liaised with clients and suppliers on a day-to-day basis ensuring that at all stages of the production cycle they are satisfied and up to date with important information. Provided technical information and engineering knowledge to the design team.

    • Travel Arrangements
    • Production Supervisor (Temporary contract)
      • Jan 2009 - Mar 2009

      Worked with a team of 10 Carpenters on the construction of a 68ft hull plug. Worked with a team of 10 Carpenters on the construction of a 68ft hull plug.

    • Fit-Out Supervisor
      • Dec 2007 - Dec 2008

      Supervisor on the production line for the Landmark 43 Cruiser Racer. Supervising all the interior structural fit-out, cabinetry and upholstery detailing. Working with a team of approximately 10 Filipino staff to teach and supervise the interior fit out and infusion on the Landmark projects. In June of 2008 went to France for 3 weeks with hull number two for warranty work and race modifications. Successfully worked on all 5 Landmarks constructed. Supervisor on the production line for the Landmark 43 Cruiser Racer. Supervising all the interior structural fit-out, cabinetry and upholstery detailing. Working with a team of approximately 10 Filipino staff to teach and supervise the interior fit out and infusion on the Landmark projects. In June of 2008 went to France for 3 weeks with hull number two for warranty work and race modifications. Successfully worked on all 5 Landmarks constructed.

    • Boat Building Foreman/Project Manager
      • Oct 2006 - Dec 2007

      Constructed composite racing yachts (IRC40 and IRC46 classes). Worked on the ‘WindJet’ land yacht construction in order for it to attempt the world record for a wind powered land vehicle. This included laminating and general construction. Promoted to Project Manager for full setup and production of a resin infused sailing dinghy (RS Elite) in August 2007. Supervised teams of 5-8 Thai staff who had never worked in the boat building industry previously and spoke little to no English. This required effectively learning to communicate ideas and concepts without the use of language. Pre-preg laminating of bowsprits and tiller arms. Show less

    • Australia
    • Maritime Transportation
    • Boat Builder
      • Sep 2005 - Sep 2006

      Worked alongside 3 New Zealand Boat Builders and 50 Chinese staff to construct tooling for a brand new production facility. Concentrated on areas including; plug construction, facility operation setup, production layouts, supervising part construction, and effectively passing on knowledge and skills to Chinese staffs to aid the companies future success. Supervised teams of 5-10 Chinese staff who had never worked in the boat building industry previously and spoke little to no English. This required effectively communicating ideas and concepts without the use of language. Show less

    • Boat Builder
      • Oct 2000 - Sep 2005

      Completed Boat Building Accredited Apprenticeship, acquiring trade certification. As an apprentice was trained to a high degree in interior joinery and fit-out. Successfully aided the construction of the below projects - everything from structural lamination to cabinet making, joinery and upholstery work; • 34 Metre Ed Dubois (Silvertip) • 26 Metre Bill Langan (Adjutor) • 29 Metre German Frers (K2) • 18 Metre Power-Catamaran (Escape) • 28 Metre German Frers (Symmetry) • 24 Metre Ed Dubois (Intrigue) • 29 Metre German Frers (Vesper) • 22 Metre Reichel/pugh (Pinta) Show less

Education

  • New Zealand Yachting Developments Ltd.
    New Zealand Trade Certificate of Boat Building, Boat Building
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now