Moniruzzaman Mithu

Deputy Manager, Engineering at ACI HealthCare Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bangladesh, BD
Languages
  • English -
  • Bengali -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Bangladesh
    • Pharmaceutical Manufacturing
    • 100 - 200 Employee
    • Deputy Manager, Engineering
      • Jul 2021 - Present

      Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Building Management System (BMS), Water Treatment Plant (WTP), Air-Compressor, Effluent Treatment Plant (ETP), Production Machineries, Chiller, Boiler and New project implementation.

    • Assistant Manager, Engineering
      • Jul 2019 - Jun 2021

      Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Building Management System (BMS), Water Treatment Plant (WTP), Air-Compressor, Effluent Treatment Plant (ETP), Production Machineries, Chiller, Boiler and New project implementation.

    • Senior Executive, Engineering
      • Jan 2018 - Jun 2019

      Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Building Management System (BMS), Water Treatment Plant (WTP), Air-Compressor, Effluent Treatment Plant (ETP), Pharmaceuticals Machineries, Chiller and Boiler.

    • Bangladesh
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Senior Officer, Engineering
      • Jan 2016 - Dec 2017

      Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Building Management System (BMS), Water Treatment Plant (WTP), Pure Steam Generator (PSG), Water for Injection (WFI), Air-Compressor, Effluent Treatment Plant (ETP), Pharmaceuticals Machineries, Chiller, Boiler, and New project implementation.

    • Officer, Engineering
      • Jan 2014 - Dec 2015

      Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Building Management System (BMS), Water Treatment Plant (WTP), Pure Steam Generator (PSG), Water for Injection (WFI), Air-Compressor, Effluent Treatment Plant (ETP), Pharmaceuticals Machineries, Chiller, Boiler, and New project implementation.

    • France
    • Environmental Services
    • 700 & Above Employee
    • Industrial Surveyor, Electrical (Team Leader)
      • Mar 2013 - Jan 2014

      • Assessment of electrical system for safety in various industries. • Planning assessment of 11/0.4KV HT/LT Panel, Generator, MDB, DB, SDB and other electrical equipments of a large electrical system. • On-Load measurements of 11/0.4KV HT/LT Panel, Generator, MDB, DB, SDB and other electrical equipments. • Off-Load measurements of 11/0.4KV HT/LT Panel, Generator, MDB, DB, SDB, Earthing system and other electrical equipments. • Photography and thermo graphic survey of nonconformities of an electrical system. • Report presentation on planning assessment, on-load measurement, off-load measurement, photography and thermo graphic survey of nonconformities of an electrical system for safety according to BNBC(Bangladesh National Building Code). Bangladesh Electricity Rule & NFPA (National Fire Protection Association). Show less

    • Pharmaceutical Manufacturing
    • 500 - 600 Employee
    • Executive, Engineering
      • Jan 2011 - Mar 2013

      Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Building Management System (BMS), Water Treatment Plant (WTP), Pure Steam Generator (PSG), Water For Injection (WFI), Fire Fighting System, Air-Compressor, Effluent Treatment Plant (ETP), Nitrogen Plant, Chiller and Boiler, and New project implementation. Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Building Management System (BMS), Water Treatment Plant (WTP), Pure Steam Generator (PSG), Water For Injection (WFI), Fire Fighting System, Air-Compressor, Effluent Treatment Plant (ETP), Nitrogen Plant, Chiller and Boiler, and New project implementation.

    • Bangladesh
    • Pharmaceutical Manufacturing
    • 1 - 100 Employee
    • Senior Assistant Engineer
      • Jan 2010 - Dec 2010

      Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Water Treatment Plant (WTP), Air-Compressor, Effluent Treatment Plant (ETP), Production Machineries , Generator and New project implementation. Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Water Treatment Plant (WTP), Air-Compressor, Effluent Treatment Plant (ETP), Production Machineries , Generator and New project implementation.

    • Bangladesh
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Engineering Supervisor
      • Feb 2007 - Dec 2009

      Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Water Treatment Plant (WTP), Air-Compressor, Effluent Treatment Plant (ETP), Chiller and Boiler. Installation, Commissioning, Maintenance, Operation & Documentation of Heating, Ventilation & Air- Conditioning (HVAC) System, Water Treatment Plant (WTP), Air-Compressor, Effluent Treatment Plant (ETP), Chiller and Boiler.

Education

  • World University of Bangladesh
    B.Sc in Engineering, Electrical & Electronic Engineering
    2008 - 2013
  • Dhaka Polytechnic Institute
    Diploma in Engineering, Refrigeration & Air-Conditioning Technology
    2003 - 2006
  • Ramvadrapur R M High School
    S.S.C, Science
    1991 - 2002

Community

You need to have a working account to view this content. Click here to join now