Mojtaba Roghaniha

LDPE Plant Manager at Arya Sasol Polymer
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Iran, IR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Iran
    • Oil and Gas
    • 400 - 500 Employee
    • LDPE Plant Manager
      • Sep 2021 - Present

    • Startup/Normal operation, Process specialist and shift supervisor
      • Mar 2008 - Present

      9th Olefin plant), Pars Special Economic Zone,Asaluyeh,Islamic Republic of IranType of company: Petrochemical Company; Constantly monitor the process for effectiveness and modifying the process where needed.Assist with startup modifications in-doing detail designs.Assist with HAZOPS and writing of new procedures.Oversee the updating of P&ID’s.Liaise with licensor and vendors in order to clarify trouble shooting.Ensure that the production unit produce according design parameters if not, investigate solutions to rectify.Increasing the plant production rate (More than design capacity) by optimization of the LDPE reactor. Show less

    • Pre commissioning / Commissioning/Startup DCS Operator and Shift Supervisor ,Assistant plant manager
      • Oct 2004 - Jun 2012

      9th Olefin plant) , Pars Special Economic Zone,Asaluyeh,Islamic Republic of IranType of company: Petrochemical Company; (LDPE plant).Responsibilities: Taking commands from line manager and organize and mobilize all necessary subordinates to perform.Coordination between all relevant sections related to pre commissioning / commissioning activities such as construction, maintenance, safety department, etc. Prepare the punch list of pre commissioning / commissioning shortage and following to complete it. Cooperation with equipment vendors and hand over the system from vendors after final checks. Making daily report to line manager.Check all control / site check lists.Performing instructions according to documents and vendor comments.Preparing procedures for commissioning and start up activities under licensor’s supervision, Like as preparing Booster Primary Compressor for maintenance and Initiator pumps pumping throw procedure. Working as a DCS operator during start up (Emerson DCS). Informal exposure configuration of HIMA logic. Show less

    • PETROCHEMICAL
      • 2004 - Present

      Assistant Plant Manager

    • Plant Manager Assistant
      • 2011 - Oct 2021

      producing low density polyethylene

    • First Aid
      • May 2006 - May 2007

      HSEQ course (basic and permit steps), 9th Olefin plant HSE department, Asalouye port, Iran. Basic employee HSE Fire Fighting Permit to work Confined space Lock out Gas test Equipment decontamination Source of Ignition Emergency response plan; UEC (Unit Emergency Coordinator) course,9th Olefin plant Training department, Asalouye port, Iran. ASPEN PLUS simulation training, 9th Olefin plant Training department, Asalouye port, Iran. ASPEN Polymer training, 9th Olefin plant Training department, Asalouye port, Iran. Show less

    • ASPC
      • Aug 2005 - Sep 2005

      Licensor training in Geleen plant, Mastricht (SABTEC LDPE Tubular reactor technology), Netherlands. Licensor training in Geleen plant, Mastricht (SABTEC LDPE Tubular reactor technology), Netherlands.

Education

  • azad university
    Bachelor's degree, Chemical Engineering
    2000 - 2004
  • 청강아카데미학원
    B.S, Chemical Engineering

Community

You need to have a working account to view this content. Click here to join now