Mohsen Sarijloo
Senior Structural Engineer at Petrogas Jahan- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Farsi Native or bilingual proficiency
Topline Score
Bio
Experience
-
Petrogas Jahan
-
Iran
-
Oil and Gas
-
1 - 100 Employee
-
Senior Structural Engineer
-
Sep 2021 - Present
1) Ilam Refinery (Ilam, IRAN): Position: Structure engineer I designed following structures during the project: - Pipe-rack unit 400 (Structure & Foundation) - Pipe-rack unit 200 (Structure & Foundation) - Stabilizer Tower T-1630Foundation - V-2630 Equipment Foundation - E-4700 Horizontal Vessel Equipment Foundation 2) Bidboland Refinery (Behbahan, IRAN): Position: Structure engineer I designed following structures during the project: - Multi-Platform Structures - Pipe Rack St-004 - Pipe Rack St-006 - Pipe Rack St-007 - Pumps Foundations 3) Urmia Refinery (Urmia, IRAN): Position: Structure engineer I designed following structures during the project: -Liquid Pac Multi-Purpose Building -Raw Material Warehouse Shelter -Pac-Product Warehouse Shelter -Tanks Dike Wall -Buried Concrete Tank
-
-
-
Monenco Iran Consulting Engineers
-
Iran
-
Oil and Gas
-
500 - 600 Employee
-
Structure Engineer
-
Sep 2016 - Sep 2021
1) RUMAILA 3000 MW Combined Cycle Power Plant (Rumaila, IRAQ): Position: Structure engineer I designed following structures during the project: - Condensate Water Storage Tank - CPP Air Storage Tank Foundation - Demin Water Storage Tank Foundation - HRSG Foundation - HRSG Miscellaneous Foundation - Unloading Bay Shelter - Sewage Treatment Package Building 2) HENGAM COMBINED CYCLE POWER PLANT (BANDAR ABBAS, IRAN): Position: Structure engineer I designed following structures during the project: - Gas Turbine Hall Generator Platform - Main Stair Case of Turbine Hall - Unloading Station Gate House Building - Gas Turbine Hall Floor Slab - HRSG Clean Drain Tank - Demin Water Storage Tank Foundation - Platform inside Water Treatment Plant 3) WEST KARUN CYCLE POWER PLANT (AHVAZ, IRAN): Position: Structure engineer I designed following structures during the project: - Condensate Receiver Tank Foundation - Gas Turbine Hall Steel Structure Air Intake Stair - Gas Turbine Hall Roof Access Stair - Steam Turbine Hall Platforms - Steam Switchgear Local Control Container - Waste Water Tank - HRSG Clean Drain Pump House Foundation 4) Second Phase of Isfahan Refinery Development Plant Project (ESFAHAN, IRAN): Position: Structure engineer I designed following structures during the project: - Retaining walls of whole site. - Culverts of Unit 45E located between unit 45B and 45E, culvert 45B located between unit 45A and 45B, culvert 50A, B located between unit50A and 50B. - Pipe sleepers and Pipe supports in units 45A, 45C, 45E, 50A, 50B and 50F. - Dike wall of Tank areas 50 A, 50C and 50D. - Firefighting pump house shelter with its annex in unit 42B. - Ring foundation of water tanks no.TK-4202A and TK-4202B in unit 42B. - Gate house building in north part of site.
-
-
-
Pars Geometry Consulting Engineers
-
Iran
-
Business Consulting and Services
-
1 - 100 Employee
-
Structure Engineer
-
Dec 2014 - Sep 2016
Working from December, 2014 to August, 2016: “Pars Geometry Consultants Company” TEHRAN, IRAN Pars Geometry Consulting Engineers Company is a private company and was formed in 2005, which is specialized in industrial projects especially in oil, gas, petrochemical projects, port construction and marine structures. I designed structures during the following projects: I received the input data and ICWs (Input for Civil Works) from lead engineer and interacted with other involved discipline by email. In addition, I participated in technical meeting and site visit and answered site technical queries (TQ). 1) Kish International Airport Aviation Fuel Facility - (KISH, IRAN): Position: Structure engineer I designed following structures during the project: - Fire Fighting Office Building - Fire Fighting Pump house Shelter - Administration Building - Loading & unloading shelter - Parking lot shelter 2) EHSAN CHEMI STAHBAN TANK FARM - (BANDAR ABBAS, IRAN): Position: Structure engineer I designed following structures during the project: - Gate House & Bascule Room - Office, driver room & Parking building 3) HORMOZAN OIL TANK FARM - (BANDAR ABBAS, IRAN): Position: Structure engineer I designed following structures during the project: - Culvert Type-1 and Type-2 - API Separator 4) JAM POLYPROPYLENE TRUCK UNLOADING- (JAM, IRAN): Position: Structure engineer I designed following structures during the project: - Pipe Supports - Unloading Shelter 5) NEW LINE OF KHONSORKH- (BANDAR ABBAS, IRAN): Position: Structure engineer I designed following structures during the project: - Pipe supports of the whole line. - Pipe Sleepers of the whole line.
-
-
-
TWI
-
United Kingdom
-
Research Services
-
500 - 600 Employee
-
Offshore Structural Engineer
-
Nov 2011 - Jun 2014
"TWI Persia Company” TEHRAN, IRAN I was assigned on following project in TWI Persia Company: 1) Structural Integrity Analysis of platforms and Geotechnical Survey project-(Persian Gulf, IRAN): Position: Structure engineer I have worked on assessment of following offshore platforms in this company: - N1 Drilling Platform (Nasr oil field) - N6 Drilling platform (Nasr oil field) - 2S7, 2S18 and 2S19 Wellhead Platform (Salman oil field) - F/P Facility Platform (Salman oil field) - R1 Facility Platform (Resalat oil field) - R4 Drilling and Accommodation Platform (Reshadat oil field) Responsible for mentioned offshore platforms for site visit such as thickness measuring (NDT), structural survey and metering, data gathering and also responsible of preparing of Structural Assessment Basis and Criteria Document, modeling, preparing of Assessment Analysis (In-Place, Fatigue, Seismic, Pushover and Ship-impact) and prepare of Assessment Summary and Remedy Options documents. 2) Structural Remaining Life Assessment Procedure project-(ABU DHABI, United Arab Emirates): Position: Structure engineer I worked on assessment of following offshore platforms in this company: - ZK-002 Wellhead Platform (Zakum oil field) - ZK-110 Wellhead Platform (Zakum oil field) - US-022 Wellhead Platform (Umm Shaif oil field) - US-235 Wellhead Platform (Umm Shaif oil field) - US-259 Wellhead Platform (Umm Shaif oil field) Responsible for mentioned platforms for modeling, preparing the evaluation of the first and second group of uncertainties on the Design Level In-place analysis and Ultimate Level push-over, and finally verify if the structural integrity of the platform can be endorsed for next seven years. Otherwise preventive measures for reducing the likelihood of hazards and failure modes were identified using the analytical model. Outlines for mitigation and remedy actions were set.
-
-
Education
-
Kharazmi University
Master's degree, Structural Engineering -
Persian Gulf University
Bachelor's degree, Civil Engineering