MOHINDER SINGH THAKUR
Sr. Manager (DPM) at Airef Engineers Private Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Airef Engineers Private Limited
-
India
-
Construction
-
1 - 100 Employee
-
Sr. Manager (DPM)
-
Aug 2018 - Present
4 lane road project with tunnelling work
-
-
-
Valecha Engineering Limited
-
Construction
-
200 - 300 Employee
-
Senior Construction Manager
-
Apr 2016 - Jul 2018
Responsibilities span overall irrigation tunnel project execution including supervision, monitoring, labor management, co-ordination, conducting project review meeting / organizing, analysis of rates, selection of contractors, all construction activities in side tunnel & slope protections work including inspection of rock bolting, shotcreting, concrete lining etc. and strongly dealing with locality related to project issues.
-
-
-
-
Project Manager Civil
-
May 2012 - Mar 2016
Responsibilities span overall project execution including supervision, monitoring, labor management, co-ordination, conducting project review meeting / organizing, analysis of rates, selection of contractors, Construction of main components of power project such as Head Race Tunnel, Power House, Desilting Chamber, Trench Weir, Fore bay & slope protections work including inspection of rock bolting, shotcreting, concrete lining etc. and strongly dealing with locality related to project issues.
-
-
-
-
Sr. Engineer Civil
-
Jun 2008 - Apr 2012
Execution of U/g Excavation of head race tunnel, Trench Weir & U/g Desilting Chamber with supporting system, Slope protection work including inspection of rock bolting, shotcreting, concrete lining and liaisoning and dealing with locality related to project.
-
-
-
-
Asstt.Manager (Civil)
-
Apr 2006 - May 2008
In the capacity of AM (Civil) reporting to Thai expert, and leading team of engineers and support staff to successfully execute the excavation and concrete lining for galleries(16Nos.) each gallery dia 3.6 meter. Base gallery 40 M. below the river bed. This gallery is the most critical and integral structure of the 800 MW Koldam Hydro Power Project, completed underextreme physical circumstances, geology and technicality. I’m looking after the Foundation treatment of dam, Drainage and Grouting Galleries work, such as planning & scheduling of various activities, drilling blasting, rock protection, concrete lining, grouting work etc.
-
-
-
-
Project Engineer Civil
-
Jan 2004 - Mar 2006
Execution of civil works of Underground Power House, TRT & control bay building works etc. Making of daily progress report, Preparing OK cards and protocols of all activities.
-
-
-
-
Site Engineer civil
-
Feb 2000 - Dec 2003
Execution of open excavation, rock stabilizing work for 16.00m dia diversion tunnels including drilling, blasting, fixing of wire mesh, shotcrete, installation of rock bolt with resin capsules , cement grouting & fixed of cable anchors length varying from 25.00m to 40.00m .
-
-
Education
-
Sunder Nagar
B-Tech Civil, Civil engineering