Mohideen Imran Khan Syed Masood

Mechanical Engineer at Tasleeh Facility Management
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dubai, United Arab Emirates, AE
Languages
  • English Full professional proficiency
  • Hindi Professional working proficiency
  • Tamil Native or bilingual proficiency
  • Malayalam Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Facilities Services
    • 1 - 100 Employee
    • Mechanical Engineer
      • Apr 2021 - Present

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Mechanical Engineer
      • Oct 2018 - Oct 2020

      I was Worked as Mechanical Engineer for the Royal Atlantis Hotel & Residential Project at Palm Jumeirah.  Submission and Follow up for Material submittal and Method of statement as per project specifications to get approval from the consultant.  Review IFC drawings, project specifications and Raising RFI for the details/modification/confirmation required in IFC drawings.  Taking Quantity from the approved shop drawings for making MR and Verify LPO with MR.  Raising MIR for the delivered materials with documents stated in the Material submittal approval.  Periodic checking of Materials stock list for Material availability.  Prepare the work progress report by daily, weekly and monthly basis and the same submitted to the Project Manager.  General supervision and inspect the installation, modification and commissioning of mechanical systems (HVAC & Plumbing) at construction sites.  Ensure standards in all type of installations like Chillers, DX unit, FCU, AHU, FAHU, Refrigerant Copper piping, CHW piping & Insulation, Valves, GI/PI Duct, Smoke Ventilation Duct (Fire rated), Insulation work, Fire Damper and Motorized Smoke Fire Dampers.  Supervision and Ensure standards in installation of U/G Drainage system, Waste/Soil/Vent, Water supply piping , Acoustic insulation and final sanitary ware fixing as per the project specifications and Municipal regulations.  Following DM/DCD regulation for the complete installation to get approval from concerned authorities.  Communicate with civil services for the required clearance to proceed the work  Co-ordinate with other services for the coordination issues.  Attend technical meetings (Internal meetings, meeting with Main contractor/Consultant).  Raising the inspection for the completed work. Explaining the installation procedures and standards implementation on the erection of the systems with consultant during inspection.  Preparing as Built drawings with marking drawings. Show less

    • Mechanical Engineer - HVAC
      • Jan 2016 - Jan 2018

       Taking Quantity from the approved shop drawings for making materials request.  Verify the LPO based on Material request.  Generate planning, schedules and workload forecasts to optimise the allocation of field resources to fulfil the completion schedule in due time.  General supervision and inspect the installation, modification and commissioning of mechanical systems at construction sites.  Maintaining standards in FCU, GI Duct, Fire rated Duct, MSFD installations.  General supervision on installation of DX units, FCU, AHU, Ducting fabrication & Erection, Chilled water pipeline Erection and insulation.  Communicate with civil services for the required clearance to proceed the work  Co-ordinate with other services for the coordination issues.  Raising the inspection for the completed work. Explaining the installation procedures and standards implementation on the erection of the systems with consultant during inspection  Periodic checking of Materials stock list for Material availability.  Co-ordinate with supplier regarding earliest material delivery to site.  To ensure safety standards and procedures are implemented Show less

    • Mechanical Engineer
      • Nov 2013 - Nov 2015

       Reviewing the Enquiries.  Take the Quotations from Suppliers and Contractors  Preparation of Bills of Quantities (BOQ).  Generate planning, schedules and workload forecasts to optimise the allocation of field resources to fulfil the completion schedule in due time.  Verify shop drawings based on tender drawings.  General supervision on installation of DX units, Package AC, FCU, AHU, Ducting fabrication & Erection, Chilled water pipeline Erection and insulation.  To handle the Refrigerant pipe connections of outdoor and indoor units. (Room Air Conditioners, Ductable Split, DX-AHU) Show less

  • M/S. Unitech Air Systems
    • Chennai Area, India
    • Site Engineer
      • Jun 2011 - Apr 2013

Education