Mohd Khairy Fazin
C&S Inspector at MIE INDUSTRIAL SDN BHD- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
MIE INDUSTRIAL SDN BHD
-
Construction
-
300 - 400 Employee
-
C&S Inspector
-
Feb 2019 - Present
Project: Refinery and Petrochemical Integrated Development (RAPID) Package 33 - EPCC of Excess LP Steam Turbine Generator Reviewed of Material Approval, Method Statement and Inspection & Test Plan (ITP). Reviewed and check Request for Information (RFIN). Reviewed and check Quality Control Form (QCF). Quality inspection for Civil and Structure works. Reinforcement Concrete (Pre, Pour & Post Inspection) Concrete cube test and record Roadworks and Infra Building Architecture Inspection Steel Structure Issued punch list and defect inspection. Quality walk down with client. Prepared and monitored Non Conformance Report (NCR) issue and closing control. Show less
-
-
-
Wabag Muhibbah JV Sdn Bhd
-
Johor, Malaysia
-
QAQC Engineer
-
Dec 2017 - Jan 2019
Project: Refinery and Petrochemical Integrated Development (RAPID) Package No.16A - EPCC of Effluent Treatment Plant (ETP) Reviewed of Material Approval, Method Statement and Inspection & Test Plan (ITP). Reviewed and check Request for Information (RFIN). Reviewed and check Quality Control Form (QCF). Quality inspection for Civil and Structure works. Reinforcement Concrete (Pre, Pour & Post Inspection) Concrete cube test and record Grouting work Roadworks and Infra Building Inspection Steel Structure Issued punch list and defect inspection. Quality walk down with client. Prepared and monitored Non Conformance Report (NCR) issue and closing control. Show less
-
-
-
Kerjaya Prospek
-
100 - 200 Employee
-
Site Engineer
-
Nov 2016 - Dec 2017
Project : The Tamarind, 1104 units Executive Condominium with Facilities : Seri Tanjung Pinang, 32 units Semi-detached Ensured that all works at site in accordance to Quality Plan and followed at all time during the progress. Responsible managing and supervising for site construction day to day. Ensured that all works carried out are in accordance to the drawings and specifications. Reviewed of Method Statement and Material Approval. Prepared Request for Inspection (RFI). Involved in the inspection of the works and testing with Consultant Engineer and sub-con. Involved in the inspection of the concrete work (check temperature, slump test, cube test and crushing strength). Concrete Plant visit for Concrete Cube Crushing Strength result. Prepared Concrete Cube Test report. Prepared and monitored Non Conformance Report (NCR) issue and closing control. Inspection the delivery of material. Show less
-
-
-
WCT Berhad
-
Malaysia
-
Civil Engineering
-
300 - 400 Employee
-
QA/QC Officer
-
Jan 2015 - Nov 2016
Project: Refinery and Petrochemical Integrated Development (RAPID) Package No. 20C Common Construction Access and Permanent Roads Reviewed of Material & Sample Submission, Method Statement and Inspection & Test Plan (ITP). Ensured and verified that all works are accomplished in accordance with the agreed Material & Sample Submission, Method Statement and Inspection & Test Plan (ITP). Ensured and verified that all works are followed by latest Construction Drawing. Conducted quality assessment for projects under construction and post construction to ensure that finished works meet all specifications and specified quality requirements. Quality inspection of roadworks with client, construction team and sub-con. Concrete inspection (culvert & bridge) Excavation and Backfilling works Soil test Premix test Factory & Plant visit for material inspection. Involved in the inspection of materials receiving. Involved in the inspection of concrete work (check temperature, slump test, cube test and crushing strength). Prepared Concrete Cube Test report. Show less
-
-
-
ABH Mega Sdn Bhd
-
Perlis, Malaysia
-
QA/QC Engineer
-
Jan 2013 - Jan 2015
Project: "Menaiktaraf Empangan TimahTasoh, Perlis (Fasa 2): Pakej 1-Pembinaan Alur Limpah Barat” Upgrading Timah Tasoh Dam. Monitor and control quality works at the project sites. Ensured that all works carried out are in accordance to the drawings and specifications. Prepared Project Quality Plan (PQP), Inspection Test Plan (ITP), Method Statement and Material Submission & Approval. Maintained good housekeeping and implement Quality Control practices. Prepared Request for Inspection (RFI). Prepared Checklist form for RFI. Involved in the inspection of the works and testing with Client and sub-con Prepared Quality Monitoring report. Prepared Site Instruction (SI) about Quality Control. Involved in the inspection of the concrete work (check temperature, slump test, cube test and crushing strength). Involved in the inspection of Soil Test at independent Lab. Concrete Plant visit for Concrete Cube Crushing Strength result. Prepared Concrete Cube Test report. Monitored FDT test report and Soil test report. Prepared and monitored Non Conformance Report (NCR) issue and closing control. Show less
-
-
-
Belati Wangsa (M) Sdn Bhd
-
Government Relations
-
1 - 100 Employee
-
Ass Project Engineer
-
Jan 2011 - Jan 2013
Project: Maintenance project for roadwork and assets in terms of reconstruction pavement, mill and pave, CIPR, drainage, culvert, bridge and other road assets on federal road in Kedah, Penang and Perak. Reviewed of Material & Sample Submission, Method Statement and Inspection & Test Plan (ITP). Ensured and verified that all works are accomplished in accordance with the agreed Material & Sample Submission, Method Statement and Inspection & Test Plan (ITP). Ensured and verified that all works are followed by latest Construction Drawing. Monitored and supervise sub-con to perform their duty. Prepared claim Bill of Quantity (BQ). Prepared Request for Inspection (RFI). Prepared and monitored Non Conformance Report (NCR) issue and closing control. Inspection the delivery of material. Factory/Plant visit for material inspection. Attended internal meeting. Attended Monthly meeting with client. Show less
-
-
-
Belati Wangsa (M) Sdn Bhd
-
Government Relations
-
1 - 100 Employee
-
QC Supervisor
-
Nov 2008 - Jul 2010
Project: Maintenance of federal road in all Penang, Malaysia. Prepared and ensure all quality record were produce during production work, well keep and maintain in good condition at all time. Prepared Site Instruction to sub-contractor for repair work and closing control. Prepared emergency claims. Involved in the inspection with sub-contractor. Check resources, material or machinery for the company. Prepared Bill of Quantities (BQ). Prepared site visit report. Prepared Monthly Quantitative Assessment report. Prepared Routine Inspection report. Show less
-
-
Education
-
Universiti Teknologi MARA
Bachelor's degree, Construction Management -
Polytechnic Sultan Abdul Halim Mu'Adzam Shah
Diploma of Civil Engineering, Civil Engineering