Mohd Khairy Fazin

C&S Inspector at MIE INDUSTRIAL SDN BHD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pengerang, Johore, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 300 - 400 Employee
    • C&S Inspector
      • Feb 2019 - Present

      Project: Refinery and Petrochemical Integrated Development (RAPID) Package 33 - EPCC of Excess LP Steam Turbine Generator  Reviewed of Material Approval, Method Statement and Inspection & Test Plan (ITP).  Reviewed and check Request for Information (RFIN).  Reviewed and check Quality Control Form (QCF).  Quality inspection for Civil and Structure works.  Reinforcement Concrete (Pre, Pour & Post Inspection)  Concrete cube test and record  Roadworks and Infra  Building Architecture Inspection  Steel Structure  Issued punch list and defect inspection.  Quality walk down with client.  Prepared and monitored Non Conformance Report (NCR) issue and closing control. Show less

    • QAQC Engineer
      • Dec 2017 - Jan 2019

      Project: Refinery and Petrochemical Integrated Development (RAPID) Package No.16A - EPCC of Effluent Treatment Plant (ETP)  Reviewed of Material Approval, Method Statement and Inspection & Test Plan (ITP).  Reviewed and check Request for Information (RFIN).  Reviewed and check Quality Control Form (QCF).  Quality inspection for Civil and Structure works.  Reinforcement Concrete (Pre, Pour & Post Inspection)  Concrete cube test and record  Grouting work  Roadworks and Infra  Building Inspection  Steel Structure  Issued punch list and defect inspection.  Quality walk down with client.  Prepared and monitored Non Conformance Report (NCR) issue and closing control. Show less

    • 100 - 200 Employee
    • Site Engineer
      • Nov 2016 - Dec 2017

      Project : The Tamarind, 1104 units Executive Condominium with Facilities : Seri Tanjung Pinang, 32 units Semi-detached  Ensured that all works at site in accordance to Quality Plan and followed at all time during the progress.  Responsible managing and supervising for site construction day to day.  Ensured that all works carried out are in accordance to the drawings and specifications.  Reviewed of Method Statement and Material Approval.  Prepared Request for Inspection (RFI).  Involved in the inspection of the works and testing with Consultant Engineer and sub-con.  Involved in the inspection of the concrete work (check temperature, slump test, cube test and crushing strength).  Concrete Plant visit for Concrete Cube Crushing Strength result.  Prepared Concrete Cube Test report.  Prepared and monitored Non Conformance Report (NCR) issue and closing control.  Inspection the delivery of material. Show less

    • Malaysia
    • Civil Engineering
    • 300 - 400 Employee
    • QA/QC Officer
      • Jan 2015 - Nov 2016

      Project: Refinery and Petrochemical Integrated Development (RAPID) Package No. 20C Common Construction Access and Permanent Roads  Reviewed of Material & Sample Submission, Method Statement and Inspection & Test Plan (ITP).  Ensured and verified that all works are accomplished in accordance with the agreed Material & Sample  Submission, Method Statement and Inspection & Test Plan (ITP).  Ensured and verified that all works are followed by latest Construction Drawing.  Conducted quality assessment for projects under construction and post construction to ensure that finished works meet all specifications and specified quality requirements.  Quality inspection of roadworks with client, construction team and sub-con.  Concrete inspection (culvert & bridge)  Excavation and Backfilling works  Soil test  Premix test  Factory & Plant visit for material inspection.  Involved in the inspection of materials receiving.  Involved in the inspection of concrete work (check temperature, slump test, cube test and crushing strength).  Prepared Concrete Cube Test report. Show less

  • ABH Mega Sdn Bhd
    • Perlis, Malaysia
    • QA/QC Engineer
      • Jan 2013 - Jan 2015

      Project: "Menaiktaraf Empangan TimahTasoh, Perlis (Fasa 2): Pakej 1-Pembinaan Alur Limpah Barat” Upgrading Timah Tasoh Dam.  Monitor and control quality works at the project sites.  Ensured that all works carried out are in accordance to the drawings and specifications.  Prepared Project Quality Plan (PQP), Inspection Test Plan (ITP), Method Statement and Material Submission & Approval.  Maintained good housekeeping and implement Quality Control practices.  Prepared Request for Inspection (RFI).  Prepared Checklist form for RFI.  Involved in the inspection of the works and testing with Client and sub-con  Prepared Quality Monitoring report.  Prepared Site Instruction (SI) about Quality Control.  Involved in the inspection of the concrete work (check temperature, slump test, cube test and crushing strength).  Involved in the inspection of Soil Test at independent Lab.  Concrete Plant visit for Concrete Cube Crushing Strength result.  Prepared Concrete Cube Test report.  Monitored FDT test report and Soil test report.  Prepared and monitored Non Conformance Report (NCR) issue and closing control. Show less

    • Government Relations
    • 1 - 100 Employee
    • Ass Project Engineer
      • Jan 2011 - Jan 2013

      Project: Maintenance project for roadwork and assets in terms of reconstruction pavement, mill and pave, CIPR, drainage, culvert, bridge and other road assets on federal road in Kedah, Penang and Perak.  Reviewed of Material & Sample Submission, Method Statement and Inspection & Test Plan (ITP).  Ensured and verified that all works are accomplished in accordance with the agreed Material & Sample  Submission, Method Statement and Inspection & Test Plan (ITP).  Ensured and verified that all works are followed by latest Construction Drawing.  Monitored and supervise sub-con to perform their duty.  Prepared claim Bill of Quantity (BQ).  Prepared Request for Inspection (RFI).  Prepared and monitored Non Conformance Report (NCR) issue and closing control.  Inspection the delivery of material.  Factory/Plant visit for material inspection.  Attended internal meeting.  Attended Monthly meeting with client. Show less

    • Government Relations
    • 1 - 100 Employee
    • QC Supervisor
      • Nov 2008 - Jul 2010

      Project: Maintenance of federal road in all Penang, Malaysia.  Prepared and ensure all quality record were produce during production work, well keep and maintain in good condition at all time.  Prepared Site Instruction to sub-contractor for repair work and closing control.  Prepared emergency claims.  Involved in the inspection with sub-contractor.  Check resources, material or machinery for the company.  Prepared Bill of Quantities (BQ).  Prepared site visit report.  Prepared Monthly Quantitative Assessment report.  Prepared Routine Inspection report. Show less

Education

  • Universiti Teknologi MARA
    Bachelor's degree, Construction Management
    2010 - 2012
  • Polytechnic Sultan Abdul Halim Mu'Adzam Shah
    Diploma of Civil Engineering, Civil Engineering
    2005 - 2008

Community

You need to have a working account to view this content. Click here to join now