Mohd Hisham Mohd Said

Principal Engineer Instrument at White Quest Synergy Sdn. Bhd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Oil and Gas
    • 1 - 100 Employee
    • Principal Engineer Instrument
      • Jan 2023 - Present

      Strategize equipment reliability improvement through the development of FMEA (Failure Mode & Effect Analysis) for Instrumentation and Controls at PETRONAS Chemicals Methanol Sdn Bhd. Consisting of various instrumentation at Plant 1 and Plant 2, including field instrumentations, control valves, analyzers, metering, DCS and loading arm. Provides technical support during the reviews of Asset Verification and the development of Maintenance Plan activities. Strategize equipment reliability improvement through the development of FMEA (Failure Mode & Effect Analysis) for Instrumentation and Controls at PETRONAS Chemicals Methanol Sdn Bhd. Consisting of various instrumentation at Plant 1 and Plant 2, including field instrumentations, control valves, analyzers, metering, DCS and loading arm. Provides technical support during the reviews of Asset Verification and the development of Maintenance Plan activities.

    • Malaysia
    • Oil and Gas
    • 700 & Above Employee
    • Senior Instrumentation Engineer
      • Jan 2019 - Jul 2021

      Project Engineering at PD&T.Performed basic engineering design, detail engineering design, construction, and commissioning to meet the project specifications and objectives. Conducted various engineering document reviews, constructability review, value engineering, risk assessments, audits, vendor equipment tests and governance assurance activities.

    • Project Engineer
      • Jan 2013 - Dec 2018

      Project Management at PD&T.Performed project management to meet the project specification and objectives. Conducted various schedule integration, risk assessments, site management, audits, change management and governance assurance activities. Coordinated activity integration with various client and vendors to meet the planned timeline of the project.

    • Instrumentation Engineer
      • Jan 2010 - Dec 2012

      Maintenance - Instrument & Control at Gas Processing Plant Kertih Petronas Gas Berhad.Performed maintenance plan and equipment reliability improvement for instrument and control equipment. Supervised and maintained the Instrument workshop activities, consisting of control valve servicing, safeguarding activity, field instrumentation calibration, gas detector calibration and workbench calibration. Team member for the periodic equipment criticality review for equipment. Conducted periodic checks and inspection to ensure the validity of SIRIM calibration certificates of the instruments. Trainer for Instrument Calibration and Safeguarding activities. Show less

    • Instrument Engineer
      • Jan 2008 - Dec 2009

      Maintenance - Analyzer at Gas Processing Plant Kertih Petronas Gas Berhad.Performed maintenance plan and equipment reliability improvement for analyzer, gas chromatographs and analyzer houses. Supervised the planned and reactive maintenance of the equipment. Managed the inventory of calibration and carrier gases supply, to ensure uninterrupted but optimum operation. Conducted periodic checks and inspection to ensure the validity of SIRIM calibration gases certificates. Trainer for Instrument Calibration and Safeguarding activities. Show less

    • Maintenance Planner
      • Jun 2005 - Dec 2007

      Maintenance - Electrical & Instrument at Gas Processing Plant Kertih Petronas Gas Berhad.Performed the maintenance activity coordination for Electrical and Instrumentations. Coordinated and scheduled the maintenance work processes for the team, by prioritizing based on the criticality of the equipment. Consolidated the shutdown and turnaround worklists and planned for the spare parts requirements. Managed the work notification, work order and spare part management thru SAP System. Lead the annual budget preparation and reviews and managed the budget utilization for the section. Show less

    • Instrument Engineer
      • Jan 2004 - May 2005

      Maintenance - Turbomachinery at Gas Processing Plant Kertih Petronas Gas Berhad.Performed maintenance plan and equipment reliability improvement for turbomachinery instrumentations. Supervised the planned and reactive maintenance activity of turbomachinery instruments. Coordinated the activities during equipment shutdown and breakdowns.

Education

  • Universiti Teknologi PETRONAS
    Bachelor of Engineering - BE, Electrical and Electronics Engineering
    1998 - 2003
  • Sekolah Menengah Sultan Abdul Halim
    1996 - 1997
  • Sekolah Menengah Sri Sentosa, Kuala Lumpur
    1993 - 1995

Community

You need to have a working account to view this content. Click here to join now