Mohd Bukhari
Level 2 Rope Access With NDT Level 2 Ticket at Reliacraft Engineering Sdn Bhd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Reliacraft Engineering Sdn Bhd
-
Malaysia
-
Oil and Gas
-
1 - 100 Employee
-
Level 2 Rope Access With NDT Level 2 Ticket
-
May 2018 - Present
To accomplishwork task given based on workpack by client's Hibiscus (M) LTD. - Perform Visual Inspection with NDT UT,ECT on selected process pipings and structure components via Rope Access. - Perform UT A,B,C- Scan on pressure vessel by spot location via Rope Access. - Perform Manual Lifting of 100mm manual valve and replacement passing issue via Rope Access. - Perform surface preparation and MPI on Lifting Equipment due expire date for lifting activities. - Carried out Drop Survey of potential drop object items on top side platform via Rope Access. - Perform major/minor inspection of Crane as annual inspection ( Pedastal,hoist,boom,A-frame,electrical connection and drum pulley ). - Involved with major annual shutdown,mostly activities relate with manual haulings,liftings of small bore piping spool,lattice structures,Flare Tip Inspection and NDT ( DPT ). - Involved with Tubine exhaust repairs work,fasteners replacements and haulings activities with Rope Access. Show less
-
-
-
danamin m sdn bhd
-
Oil and Gas
-
1 - 100 Employee
-
NDT inspector
-
Feb 2006 - Present
Scope Of Duties . With duties ranging from visual inspection of all welds,perform of NDT Including ultrasonic testing,radiography, magnetic particle & dye penetrant. . Ensure all the tracebility report completed prior submission for the documentation. . Ensure all the job done are comply to the International Codes and Standards such as ASME 1X ASME IIIV,ASME V, AWS D1 .1, API , ABS, NACE etc Particulars: Scope Of Duties . With duties ranging from visual inspection of all welds,perform of NDT Including ultrasonic testing,radiography, magnetic particle & dye penetrant. . Ensure all the tracebility report completed prior submission for the documentation. . Ensure all the job done are comply to the International Codes and Standards such as ASME 1X ASME IIIV,ASME V, AWS D1 .1, API , ABS, NACE etc Particulars:
-
-
-
Velosi Asset Integrity Limited
-
United Arab Emirates
-
Oil and Gas
-
200 - 300 Employee
-
Team Lead NDT Rope Access
-
Jul 2018 - Nov 2019
To accomplish inspection work based on work pack given by client's ( Repsol Malaysia LTD ). - Inspection to determine any anomalies/defect on the process piping either internal or external follows ASME B31.3/API570/API574. - Carried out B-scan on the spot section of pressure vessel to determine thickness based on API510/API574/ASME VII Div 1. - Carried out surface preparation and MPI on expire lifting Pad-Eye,lifting shackle,repair beam strcutures. - Carried out surface preparation and DPT on flare weld weldment after welds / repairs work. - Perform basic rigging,manual haulings using rope access system of turbine exhaust bolts/nuts of flanges body. - Perform Rope access manual liftings and details inepction on the heavy corroded piping ( Corrosion Under pipe supports ) - Perform flare inspection of structures,piping,support,cable tray,instrument cable,Flare Tip,burner and support mechanical lifting for Flare Tip replacement. - Perform annual crane inspection ( major/minor inspection ).Inspection was cover 100% crane body parts,padestal,boom and instrument cable. Show less
-
-
-
Applus+ Asia Middle East and Africa
-
Business Consulting and Services
-
700 & Above Employee
-
Ndt Inspector Rope Access
-
Jan 2012 - Jul 2018
-To perform Ndt ultrasonic thickness measurement/gauging and utfd on flow line piping including close visual inspection.Ad-hoc job such as visual inspection on pig louncher receiver to measure orientation and condition via Rope Access. -To perform ACFM inspection on selected structure such as bracing,jacket leg of platform with rope access. -To disscussion with OIE on board every task and all the reporting following as per standart. - Perform annual crane inspection either major or minor inspection and was cover 100% of crane body and parts,pedastal,electrical components base on API2C/2D. - Involved shutdown activities,work task to perform basic rigging to replace all aviation light and install few structure supports with bolted tightened via ropeaccess. - Drop survey of potetial drop object with Rope Access. - Perform structure inspection ( Top Side ) of platform facilities based on work pack given via Rope Access. Show less
-
-
-
THERMAL LIMITEC PTE LTD
-
Singapore
-
Civil Engineering
-
1 - 100 Employee
-
Pasif Fire Protection Survey and Installation on Structures of FPSO
-
Nov 2013 - Dec 2013
- To take measurement all structure on site of FPSO such as piping,module,static item structure to install Pasif Fire Protection via Rope Access. - To perform Visual and inspection and measurement actual main,secondary,tetiary structure before PFP installation via Rope Access. - To take measurement all structure on site of FPSO such as piping,module,static item structure to install Pasif Fire Protection via Rope Access. - To perform Visual and inspection and measurement actual main,secondary,tetiary structure before PFP installation via Rope Access.
-
-
-
Bureau Veritas Group
-
France
-
Environmental Services
-
700 & Above Employee
-
NDT Technician with UT,MPT,DPT
-
Oct 2013 - Nov 2013
- Responsibility to perform basic NDT such as UTFD on 20'' Sync Gas pipeline during shutdown periods. - Perform MT on the supports of pipe lines after repair/new installation of Sync Gas pipeline during shutdown periods. -Following the ASME B31.3/API570/API574 - Responsibility to perform basic NDT such as UTFD on 20'' Sync Gas pipeline during shutdown periods. - Perform MT on the supports of pipe lines after repair/new installation of Sync Gas pipeline during shutdown periods. -Following the ASME B31.3/API570/API574
-
-
-
NDE Consultancy (M) sdn bhd
-
Petronas chemical olefins (m) sdn bhd
-
C-scan / TOFD
-
Aug 2013 - Sep 2013
-Responsibilities to perform C-scan and Tofd inspection on butanol tank and stripper vessel/coloumn. -Perfom C-scan on 100% plate of stainless steel tank. -Responsibilities to perform C-scan and Tofd inspection on butanol tank and stripper vessel/coloumn. -Perfom C-scan on 100% plate of stainless steel tank.
-
-
Education
-
High school
Mechanical, Computer and Information Sciences and Support Services -
Open University Malaysia
Mechanical