    • Saudi Arabia
    • Civil Engineering
    • 1 - 100 Employee
    • Chief Surveyor
      • Oct 2001 - Present

      Supervision of several projects under the Ministry of Transport, including:1-Supervision of Dualization Makhawa / Majarda Project (Phase I).2-Supervision of Dualization Makhawa / Al-Mazlif Project (3 stages).3-Supervising some contractors for the implementation of highways from the city of Majmaah to Hafr Al-Batin (4 stages).4- Participation in committees affiliated to the Ministry of Transport to check the quantities of some projects in the Al-Baha region (The obstacle of King Abdullah- Baljurashi- and/The obstacle of King Khalid (Qilwah) 5- Supervision of some agricultural road projects in the yard area, for example, the Trigger Road/Upper and Lower Shada Road/Rama Valley Road/Ream Valley Road/Prevention Road/Horan Valley Road/Yaps Yabs Road/Mahla Valley Road/-.-.-.-.-.-- Et cetera.6-Auditing, inventorying and calculating quantities for the projects that I supervised.7-Studies and design work for some projects.All administrative work, correspondence, and archiving of information related to the projects that he supervised Show less

    • Survey Engineer
      • May 2001 - Oct 2001

    • Area Manager
      • May 1997 - May 2002

      Area manager for projects in Wadi Al Dawaser Governorate My work included the following: 1-Construction of His Highness Prince Abdul Rahman bin Abdul-Aziz Al Saud Road (23 km double). 2-Establishment of an internal road network for the municipality of Wadi al-Dawaser. 3-Maintenance of roads for the municipality of Wadi al-Dawaser/network of agricultural roads in agricultural areas. 4-Construction of some roads for the Ministry of Defense in the city of Wadi al-Dawaser and Al-SUlail. 5-Some works for the Saudi Telephone Company (excavation - backfill - asphalting). 6-Management and operation of the asphalt mixer and crusher (to secure the supply of the needs of the projects of the institution). 7-Follow up the design and implementation of projects with the owners that are implemented by the institution. Show less

    • Site Engineer
      • May 1995 - May 1997

      1- I worked at His Royal Highness Prince Sultan bin Abdul-Aziz Air Base in Al-Kharj region (Air Force - US Department of Defense - Pentagon) on a project to construct aircraft fuel tanks, and construct some internal roads. 2-I worked with Al-Saif Company (engineers and contractors) in the project of Al-Tameer Company (subcontractor) in the project of developing the city of Riyadh to establish a market complex in the Deira area. The work included the item of earthworks, digging the foundations according to the technical specifications and handing over the work to the Quality Department. 3-With the Bin Laden Contracting Company in the project of the ninth power plant, Dammam Road (subcontractor), by carrying out the laying works of cable tracks for the station and handing over the consultant according to the technical specifications. Show less

    • Construction
    • 700 & Above Employee
    • Site Engineer
      • May 1995 - May 1997

      project of the ninth power plant, Dammam Road (subcontractor) (Atiq Al-Saedi Trading and Contracting), by carrying out the laying works of cable tracks for the station and handing over the consultant according to the technical specifications. project of the ninth power plant, Dammam Road (subcontractor) (Atiq Al-Saedi Trading and Contracting), by carrying out the laying works of cable tracks for the station and handing over the consultant according to the technical specifications.

    • Site Engineer
      • Apr 1994 - May 1995

      1- Establishing a camp and rest areas for the Korean company Hala at the site of the Bisha cement factory, which included works (buildings - hangars - schools - clinics - service roads - sewage - lighting works). 2-Establishment of a camp and rest areas for the Japanese Mitsubishi company, in partnership with the Korean Sam One Company, at the Tabuk Cement Factory in Duba. 3- The sewage line project for the Korean Hyundai Company, which included works (excavation - backfilling - asphalting - installation of lines). Show less

    • Pianelli & Traversa Industrie (A.R.E)
      • Apr 1989 - May 1995

      Italian company Pianelli & Traversa Industrie (A.R.E) Site engineer and coordinator with the concerned government agencies... and my work included the following: 1-Development and modernization of the grain store of the Development and Agricultural Credit Bank in Alexandria (Customs Gate No. 45). 2-All civil works for the construction of the new building and the development of the steel truss barn. 3-Internal road works and service network (electricity - water - sewage). Italian company Pianelli & Traversa Industrie (A.R.E) Site engineer and coordinator with the concerned government agencies... and my work included the following: 1-Development and modernization of the grain store of the Development and Agricultural Credit Bank in Alexandria (Customs Gate No. 45). 2-All civil works for the construction of the new building and the development of the steel truss barn. 3-Internal road works and service network (electricity - water - sewage).

    • Surveying Engineer
      • May 1991 - Apr 1994

      The project of establishing an Iraqi refugee camp (on an area of ​​five million square meters) in the city of Rafha, which included works (buildings - hangars - schools - network of services, electricity, water and sewage - roads). 2- Rafha/Hafr Al-Batin dual road (Northern Region) affiliated to the Ministry of Transport (one hundred kilometers) in partnership with Bin Laden Company and under the supervision of Saud Consult office. 3- Duba port construction project in the northwestern region, and the works included (passenger hall - desalination plant - utilities and services, which include internal road works - drainage lines - internal and external fences - power station). 4-A project to develop and beautify the city of Riyadh (Aisha Bint Abi Bakr Street - Al-Abraj). Show less

    • Surveying Engineer
      • May 1987 - Apr 1989

      Establishing a five-star hotel (Al Mahrousa Hotel) affiliated with the Navy on Sidi Bishr Beach in Alexandria. Construction of six residential towers belonging to the Navy in Sidi Gaber, Alexandria corniche. The works in these projects included (surveying works - determining the locations and axes of columns and following up the ramping works, excavation and backfilling works), as well as the works of the service network in the public site (water - sewage - asphalting internal roads - swimming pools - garages - fences - electricity). Show less

    • Geographic Information System Intern
      • May 1986 - May 1987

      With the Central Agency for Public Mobilization and Statistics (the main office in Cairo), with a project to update the maps of the Beheira Governorate (topographic maps) with the aim of using them in the work of enumeration and population census. With the Central Agency for Public Mobilization and Statistics (the main office in Cairo), with a project to update the maps of the Beheira Governorate (topographic maps) with the aim of using them in the work of enumeration and population census.

Education

  • Alexandria University

Community

You need to have a working account to view this content. Click here to join now