Mohammed Mujeebuddin

Electrical Engineer at QD-SBG Construction
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Hyderabad, Telangana, India, IN
Languages
  • URDU, ENGLISH, HINDI, ARABIC, TELUGU -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Qatar
    • Construction
    • 500 - 600 Employee
    • Electrical Engineer
      • Feb 2018 - Present

    • Electrical Engineer
      • Jun 2018 - Dec 2019

    • Electrical Site Engineer
      • Jun 2019 - Nov 2019

  • Advance Vision Electro Mechanical Co.
    • Al Duhail North, Doha, Qatar
    • Electrical Engineer
      • Oct 2016 - Feb 2018

  • NIZAMI Inc.
    • Chicago USA
    • Electrical Supervisor
      • Jan 2006 - Aug 2009

  • AQUAT FOOD INDUSTRIES
    • Jeddah, Kingdom of Saudi Arabia
    • Electrical Maintenance Engineer
      • Oct 2002 - Aug 2005

  • Saudi Wiemer & Trachte Co.Ltd.
    • Jeddah, Kingdom of Saudi Arabia
    • Site Electrical Engineer
      • Oct 1997 - Sep 2002

  • ABB Electrical Industries
    • Riyadh, Kingdom Of Saudi Arabia
    • Electrical Engineer
      • Aug 1996 - Nov 1997

      •Work on Saudi Ceramic Eight floor Building Project and Khalid Masood Bin Abdul Rahman Palace project. Complete Lighting, Power, Fire Alarm, Burglar Alarm, system, Main Distribution, Distribution Panel Board termination, Cable Tray installation, •Carry out all planned site inspections as per the intervention points marked in the relevant ITP. •All site inspection shall be carried out vide an official Inspection and Test request (ITR) submitted by the CONTRACTOR through the proper Channels. •Work on a Manfouha Water treatment Plant, Riyadh Saudi Arabia complete installation of pump power supply, Pumps control panels wiring termination, Lighting, Power, system of plant •In the event he notices that the relevant Shop Drawing, materials used, MS, QCP and TIP do not cover all specification requirements, he should report the same in writing to the Construction Manager and the Senior Discipline Engineer. Copy of such report shall be forwarded to COMPANY project manager. •Closely monitor site activities to ensure quality of work is in compliance with contract requirements, good construction practice, only approved materials are used, compliance with shop drawings, and report to Senior Structural Engineer! Construction Manager. •Make sure that all materials used comply with the approved Material Approval Request. •Make sure that the CONTRACTOR’s personnel are using the latest edition of the approved shop drawings, MS, QCP and ITP as per the project master index. Show less

Education

  • Jawaharlal Nehru Technological University, Hyderabad
    Bachelor of Technology (B.Tech.), Electrical and Electronics Engineering
    1992 - 1996
  • Islamia Junior College Warangal A.P. India
    M.P.C., Maths, Phyics, Chemistry, Hindi, English
    1989 - 1992
  • Islamia High School, Warangal, A.P., India
    English, Urdu, Telugu, Maths, Science, Social
    1989 - 1989

Community

You need to have a working account to view this content. Click here to join now