Mohammed Ezzat

Testing and commissioning Engineer at Egyptian Electricity Transmission (EETC)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Al Fayyum, Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Government Administration
    • 300 - 400 Employee
    • Testing and commissioning Engineer
      • Mar 2011 - Present

      • I work in electrical testing and protection field in Egyptian Electricity Transmission Company (EETC) Ministry Of Electricity and Energy for 12 years.• I have experience in testing and commissioning of high voltage AIS and GIS substations, and the latest one was EL LAHOUN substation (220/22) KV constructed by El Sweedy T&D Company. • I have experience in testing High, Medium and Low voltage equipment, and also programming and testing protection Relaysas follow:A. Periodic Testing For Static and Digital Protection Relays Using Secondary Injection Tester Kits for the following equipment:1- Distance protection Relay:2- Differential protection Relay:3- Over Current and Earth Fault protection Relay:4- Other types of protective relays such as: (over / under voltage) relays, (over / under frequency) relays, (Restricted Earth Fault) relays, (Over Flux) relays and (Synchro check) relays. B. Testing of Low,Medium and High Voltage Equipment Using Tester Kits like Omicron CPC 100, Megger (5,10 kv) , Megger DWR , TTR330 , Programma TM1600, Megger DLRO200 , Doble M4100 Capacitance and Dissipation Factor Test Sets as follow : - Periodic testing of Power and Auxiliary Transformers (Tan δ, Megger, Turns Ratio, DC winding Resistance, and Functional Test). - CT, VT testing (Tan δ, Megger, Turns Ratio, Saturation for CT).- C.B testing (Megger, Timing, Contact Resistance, leakage current).- Bus Bar testing(Megger)- Surge Arrestors testing (Megger, leakage current).- Power Cables (Megger, leakage current).- Periodic Maintenance and Troubleshooting for AC and DC systems (Batteries and Chargers). - Disconnectors testing (Timing, Contact Resistance).- Wall Bushings testing (Megger, partial discharge).- Grounding system testing (measuring) and maintenance.- MV Capacitor Bank testing and maintenance.C. Measurements and Calibration:- Calibrate and Program (Mk6 and Mk6n) Genius Meters.- Calibrate and Program ABB Meters. Show less

    • Testing and commissioning Engineer
      • Mar 2011 - Present

Education

  • Fayoum University
    Master of Engineering - MEng, Electrical Engineering
    2014 - 2016
  • Fayoum University
    Master's degree, Electrical and Electronics Engineering
    2005 - 2010

Community

You need to have a working account to view this content. Click here to join now