Mohammed Basulailah

Injection Techinical Section Head at Gulfmaid
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jeddah, Makkah, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Saudi Arabia
    • Plastics Manufacturing
    • 200 - 300 Employee
    • Injection Techinical Section Head
      • Jan 2023 - Present

      • Lead and supervise 80+ machines in 4 sections.• Reduce the cost in several products either by reducing operation cost or product recipe or product design… etc • Coordinate with project team to purchase new machine and molds based on production requirement.• Implement the trials for any new raw materials and discussion to improve the trials.• Monthly production planning based on the monthly forecast.

    • Senior Process Engineer
      • Aug 2020 - Jan 2023

      • Lead and supervise 53 machines in 2 sections.• Preparation BOM document for any new product. • Reducing the rejected & scrap generated from machines.• Reduce the breakdown in machines.• Increase the machine productivity to maximum as possible.• Process Improvement in production line

    • Process Engineer
      • Sep 2019 - Aug 2020

      • Lead and supervise 3 machines in one section• Preparation BOM document for any new product. • Reducing the rejected & scrap generated from machines.• Doing monthly physical count for all materials and comparing with the system.

    • Saudi Arabia
    • Food & Beverages
    • 100 - 200 Employee
    • Materials Controller
      • Mar 2018 - Mar 2019

      • Ensure the request & receiving materials are match.• Receiving & transfer the materials to the production (Actually & System).• Check the losses in the materials should be allowed in all lines.• Doing monthly physical count for all materials and comparing with the system.• Daily meeting with plant team to check the materials losses in last shift and find a solution to reduce it . • Reduced the variances in monthly physical count to ZERO.

    • Production Engineer
      • Apr 2014 - Feb 2018

      • Receiving weekly production plan for the production line.• Arrangement & supervising the production line Ex: labors, materials, machines, startup and shutdown.• Taking the stock for raw materials used in the production line in every shift.• Preparation Materials Utilization sheet to estimate the losses in every shift & Consuming in Oracle system

    • Saudi Arabia
    • Investment Management
    • 700 & Above Employee
    • Summer Intern
      • Jul 2012 - Sep 2012

Education

  • King AbdulAziz University
    Bachelor's degree, Chemical Engineering
    2008 - 2013

Community

You need to have a working account to view this content. Click here to join now