Mohammed Anversha

Facilities Manager at QAFAM - Working For Qatar's Future
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Doha, Doha, Qatar, QA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Qatar
    • Facilities Services
    • 100 - 200 Employee
    • Facilities Manager
      • Jan 2019 - Present

       Plan, lead & direct the sub-contractors & subordinate engineers for the daily Operation and maintenance of all MEP systems. Conducts site visits and prepares reports on team progress, status, and level of development. Conducts site visits and prepares reports on team progress, status, and level of development. Managing all activities related to MEP and ELV. Coordinating within Project Teams, Sub Contractors and Vendors on timely basis for a Proper Project Execution Responsible for all Contract activities and commercial performance to meet project goals and objectives, Responsible of managing Quality Performance and Established performance target and KPI and monitor execution against them. Review, adjust and validate the project’s baseline schedule and budget, follow-up on the work progress and relevant cost and take appropriate measures to meet the project’s objectives. Manage proactively all contractual matters related to the project, negotiate variations/changes, and get internal technical support to defend the company against any contractual breaches. Identify and analyze project’s related problems, assess relevant risks, and prepare mitigation plans to minimize relevant costs and meet the project’s objectives. Analyze Progress reports. Communicate with facilities personnel at all organizational levels to promote a positive work environment. Prepares workforce schedule of all skilled workers who are assigned to the facility.

    • Project Engineer
      • Nov 2008 - Jan 2020

      Implementing review systems to complete projects on time and as per budgeted parameters.Coordinating within Project Teams, Sub Contractors and Vendors on timely basis for a Proper Project Execution. Relationship management with Client, Consultant, Sub Contractors and Vendors to resolve technical issues, make clarifications in the course of project execution.Review of Electrical HV/LV Single Line Diagram, AC/DC UPS SLD, Schematic drawing, Feeder schemes, Power / Distribution Transformer Sizing (Load List), HT / LT Cable Sizing, Lighting Calculations, UPS Sizing Calculations, Battery / Battery Charger Sizing, Earthing Calculations / Ground grid calculations, Lightning Protection.Coordination of Fire fighting & HVAC drawings, Reviewing of Switchgear & Transformer drawings as per the Clients requirement and Cable & Termination schedule of LV Power & Control cables. Co -coordinating with the suppliers for technical related issues.Coordination with vendor for the implementation of SCADA , BMS and PLC for HV/LV systems and Waste Water Treatment Plant, Facility building.Ability and experience of managing CAD technicians and engineers to produce necessary design documentsHighly numerate and literate with experience of developing good quality design documentation, design report, drawings, BOMs, specification etc.Good project management skills with the ability to work under pressure, be flexible and respond rapidly to client requirements.As a Company representative supervising inspections of Major Equipment and giving approvals for the same along with the client and to resolve technical issues, make clarifications in the course of inspection if any.Co-ordination of Qatar Civil Defense Department (QCDD) Inspection for getting Fire Safety Certificate(FSC)Reviewing ITP, Method of Statement, Site Acceptance Test Report, Component Test Report, Final Turnover Documentation.Reviewing vendor submittals and drawings as per specification.

    • Saudi Arabia
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Electrical Engineer
      • Nov 2006 - Nov 2008

       Generating Drawings as per client specifications, securing approvals as part of Electrical projects. Developing the Bill of Quantities for the entire project as per budgeted parameters; estimating cable quantity, preparing cable / cable termination schedules. Undertaking costing of parts, identifying vendors to source material. Coordinating with Site managers, Site Engineers, Consultant for various Tendering/Engineering/Project Execution activities. Co-ordination with other CPs for project execution activities. Generating Single Line Diagram (SLD) drawing and detailed load schedule for Central Utility Plant (CUP) in NDIA Project Preparation of FAT ITP’s, Installation ITP’s, Technical Submittal for Major equipments, FAT Reports, Component Test Reports, Site Acceptance Test Reports, etc and securing approval from the client. Reviewing vendor submittals and drawings as per specification. Reviewing of electrical power and control drawing. Preparation of the BOQ for Protection and Control System Preparation and review the schematic for 11KV and LV System. Preparation of the DB Schedules” in 66/11kV Main Substations, WWTP and CUP Buildings. Review the utility CP’s design drawings and co-ordinate with another Cp’s. Preparation of Turnover Documentation for Substations & other areas and securing approval from the client. Co-ordination of Qatar Civil Defense Department (QCDD) Inspection for getting Fire Safety Certificate (FSC)

Education

  • Cochin University of Science and Technology
    Bachelor of Engineering - BE, Electrical, Electronics and Communications Engineering
    -

Community

You need to have a working account to view this content. Click here to join now