Mohammed Alaswad

Electrical Design Engineer at McKinnell McKinnell & Taylor Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Auburndale, Massachusetts, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Verified International Academic Qualifications
    World Education Services
    Mar, 2020
    - Oct, 2024

Experience

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Electrical Design Engineer
      • Jan 2022 - Present

    • United States
    • Truck Transportation
    • 1 - 100 Employee
    • Project Engineer EIT
      • Mar 2018 - Sep 2020

      • Provide oversight technical support to Port Authority on Newark Airport AirTrain system, including the review of EIRs, TCAs, CARP documents, as well as extra work proposals.• Collect and analyze data to evaluate contractor performance and reliability in order to maintain and operate the APM (Automated People Mover). - Review and analyze daily system performance and alarm reports. - Review databases with maintenance activities and subsystem failure trends.• Find solutions to integrate the PDS system in order to implement an automated grounding system.• Supervise and evaluate coordination studies/power flow analysis performed by (HDR) on the Newark AirTrain PDS using SKM software.• Provide technical support to manage and review EIRs (Engineering Investigation Reports): - Conduct bi-weekly meetings to discuss EIR progress. - Track and log EIR progress on a weekly basis. - Request supporting documents/data to complete official reports.• Review CARP (Capital Assets Replacement Project) recommission documents for 15 trains. - Review documents involving propulsion systems, pneumatic systems, departure tests, and emergency brake tests.• Review and evaluate technical project proposals and provide feasibility studies to Port Authority.• Conduct and participate in the P1 decommissioning project, as well as the commissioning of the WCU, VOBC and AirTrain DPS.• Provide technical support regarding Newark AirTrain Replacement project by calculating needed Power and Gas consumption, evaluating project feasibility and providing alternative approaches as well as creating project packages complete with scope of work, project schedules and technical drawings.

    • United States
    • Mining
    • 1 - 100 Employee
    • E&I Engineer / Deputy Engineering Manager
      • Sep 2013 - Oct 2014

      • Reviewed and evaluated bidder documents for Electrical Contractors (Technical Part).• Ordered electrical equipment according to project standards and specifications.• Designed and calculated temporary lights for four areas in a particular project.• Worked on red line and built drawings for field changes.• Attended FAT (Factory Acceptance Test) for MV Switchgear (34.5 KV) and LV switchgear (480 V) SIEMENS in Jeddah.• Worked with Revit, AutoCAD and 3D SPEL program.• Checked and chose suitable preservation conditions for electrical materials as per specification.• Training achievements: Work at Height, Safety Induction, LOTO, Confined Space, Arc Flash and Safe Drive.• Reviewed material submittals and approved based on compliance with standards and specifications.• Assisted the Electrical Superintendent in resolving technical problems and clarifications.• Used 3D design tools during configuration of selected areas of projects.• Acted as the interface between the lead office and site office in collaboration with other third-party engineering organizations.

    • United States
    • Construction
    • 700 & Above Employee
    • Electrical Field Engineer
      • Jun 2012 - Aug 2013

      • Reviewed and corrected technical drawings (e.g.- single line diagram, grounding, cubstation, cablerouting and general arrangement for electrical equipment).• Distributed loads and created panel schedule.• Worked on red line and built drawing for field changes.• Performed electrical walk downs, including quality checks for MCCs, control panels, LDs, motors, transformers, lighting, instruments, MV/LV/Controls/FiberOptics , HVACs, underground cables, grounding systems and server panels.• Ordered electrical equipment according to project standards and specifications (FMR).• Reviewed test reports for MCCs, switchgears, UPS, CBs and lighting.• Reviewed reports and witnessed tests for Meggering, Tourqing, OTDR, RCD andIllumination (”Lux test”).• Training achievements: Work at Height, Pre-op Induction, People Base Safety, LOTO, Confined Space and Life Critical Requirements.• Became familiar with major regulations, industry codes and standards affecting standard design work in designated discipline, as well as basic engineering deliverables such as drawings, specifications, and material requisitions.

Education

  • Stevens Institute of Technology
    Master of Science (MS), Electrical Engineering
    2016 - 2017
  • Stevens Institute of Technology
    Graduate Certificate, Data Engineering
    2016 - 2017
  • Jubail Industrial College
    Bachelor's degree, Electrical Engineering
    2007 - 2012

Community

You need to have a working account to view this content. Click here to join now