Mohammed Alani
Construction Manager at Motif inte- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Motif Interiors
-
United Arab Emirates
-
Design Services
-
1 - 100 Employee
-
Construction Manager
-
Aug 2019 - Present
Responsibilities: - Project Planning - Site & Construction coordination - Resource Planning & Control - Arranging for site inspections and getting all project related approvals form different authorities like civil defense, Dubai Municipality, RTA, and Concordia. Responsibilities: - Project Planning - Site & Construction coordination - Resource Planning & Control - Arranging for site inspections and getting all project related approvals form different authorities like civil defense, Dubai Municipality, RTA, and Concordia.
-
-
-
Larsen & Toubro
-
India
-
Construction
-
700 & Above Employee
-
Project Engineer
-
May 2018 - Aug 2019
(1) Utilities work • Duct There are different types of ducts such as ( SL duct, ED duct, IRR duct etc…) In this project the proposed ducts and existing ducts were meant to be extended , both are done the same way. To begin with, ducts should be properly marked, then the area should be excavated with awareness of any utilities conflicts. After that comes the installation of the duct and backfilling the area with consideration to the depth of the excavation which shouldn’t be filled one time to avoid failiures at the final stage. • Storm water I also worked on the installation of the storm water pipe line and gullies, as well as constructing the storm water manholes. • The excavation for the storm water pipe line should be tested • Installation of the geotextile and gravel bedding • Fixing the pipe and gravel surround • Gully which precast to be installed in the marked area with awareness of the level • Storm water manhole, starting with blinding ,coating , water proofing ,screed, base shutter and wall shutter (2) Earthworks The earthworks is the first step that must be recognized as a part of a road construction. The intent of this step is to provide a stable foundation that the pavement will rest on top of. If the earthwroks are not executed correctly the road surface will definitely have failure at some point.
-
-
-
Saeed & Mohammed Al Naboodah Group
-
United Arab Emirates
-
Executive Offices
-
700 & Above Employee
-
Senior Site Engineer
-
Jul 2017 - Apr 2018
Responsibility: (1) Traffic signal : • Installation of different types of ducts. • Installation of bypass chamber, feeder pillar, traffic signal controller and scoot loop detector. • Installation of traffic signal pole such as down post, traffic signal cantilever (9m.12m) • Installation of light pole foundation. • Following up with RTA for the traffic diversion inspection. • Widening of the road which includes: shifting DEWA cables or protected, removal of sign board and relocation of parking and footpath. (2) Bridge: Working on the ramp on the bridge which includes: • Back filling of the soil wall • Installation of the panels and friction belt • Counter slab • Fixing the rebar for the counter slab with the light pole duct • Installing the soil wall barrier • Fixing the approach slab rebar • Fixing the back wall rebar
-
-
-
Günal Construction Dubai
-
United Arab Emirates
-
Construction
-
1 - 100 Employee
-
Senior Site Engineer
-
May 2014 - Jun 2017
Project :Interchange 7 R1045 (1) Road diversion • Exposing the existing utilities and relocating them (I have alsodone the dusup gas line excavation). • Preparing the new temporary road, which the traffic will be diverted to. Dubai water canal Responsibility: (1) Piling: Mark the area which will be excavated, put the steel case, calipar test, install the rebar, cast concrete, excavate for the piles, breaking of the piles, blinding, sonic test, integrity test, grouting for sonic pipe, block works, water proofing, start the steel work, cast concrete, start scaffolding for the column, shattering, and cast concrete. (2) Scaffolding: Surveryor starts by marking the area for the scaffolding, then the area should be compacted and tested, after that comes the installation of the blocks with reference to the drawing, then start to build the scaffolding, after that doka should be installed, and framework for the bottom slab and cantilever. (3) Steel work: Will be divided into two categories: Bottom slab Start the steel work for the bottom slab which will be given in the drawings (B1,B2..) and it will be included for the cantilever, blestar (if required), web then installation for the duct of the web and bottom slab, finally fixing the shutter for the slab and webs and be casted. Top slab In this stage we will continue the shutter for the webs for it to be casted so we can start the top slab after installing the scaffolding and formwork. We will start the steel work for the top slab in reference to the drawing which will include also the steel of the barriers and street light foundation. We also have to consider the open box for the posttension. (4) Posttension: Start fix for the machines, sending the strain for pier to another pier, pressure test and grout Grout it will be include water, flow cable, cement, ice. (5) NMC wall (retaining walls) Casting different types of moulds for NMC wall, preparing the foundation and blinding for fixing the NMC wall .
-
-
-
Todini Costruzioni Generali S.p.A.
-
Italy
-
Construction
-
1 - 100 Employee
-
Junior Engineer
-
Mar 2013 - Apr 2014
Project : Comprehensive improvements of parallel roads Responsibility: • Earth work • Road work • Utilities Earth work for : (1) Retaining wall (2) Sidewalks (footpath) (3) Road (4) Utilities (1) Retaining wall: • Back filling for retaining wall • laying sub base • Installation of perforated pipe • Pitumen paint (2) Sidewalks (footpath): • Preparation the formation of the footpath • Laying sub base • Laying black sand • installation of the interlocks with red sand and compaction (3) Road: Preparation the layers of the road which is content: • Formation • Sub base • Wet mix • Prime coat • Base course • Wearing course (5) Utilities: • Exposing for the existing utilities • installation for different type of duct Road work for: (1) Sidewalks (footpath) • Casting the blinding for different type of kerbs such as up stand kerb heel kerb trief kerb • installation and hunching for the kerbs • installation of the interlocks
-
-
Education
-
University of Bolton, Academic Centre - Ras Al Khaimah
Bachelor's degree, Civil Engineering -
American College of Dubai
Foundation Certificate -
Al-Ahliya Private School
High School Diploma -
sites power
Autodesk AutoCad