Mohammadreza Amiri
Senior Project Planner at MAPNA MD2- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Mapna-MD2
-
Oil and Gas
-
1 - 100 Employee
-
Senior Project Planner
-
Jan 2018 - Present
Combined cycle power plant project with a capacity of 3000 MW (12 gas units +6 steam units) Combined cycle power plant project with a capacity of 3000 MW (12 gas units +6 steam units)
-
-
-
Headquarter of Mapna Group Co., Power Division
-
Tehran Province, Iran
-
Senior Project Planner
-
Mar 2010 - Jan 2018
Qarn Alam Power Station Phase 3 - Petroleum Development Oman LLC 1 unit single power plant with 1 Heat Recovery Steam Generation in Qarn Alam Qeshm Power and Water Desalination Project 2 units single power plant with a capacity of 50 MW with 4 units water desalination Qarn Alam Power Station Phase 3 - Petroleum Development Oman LLC 1 unit single power plant with 1 Heat Recovery Steam Generation in Qarn Alam Qeshm Power and Water Desalination Project 2 units single power plant with a capacity of 50 MW with 4 units water desalination
-
-
-
MAPNA Special Power Plants Construction and Development Company (MD3)
-
Tehran Province, Iran
-
Senior Project Planner
-
Dec 2007 - Mar 2010
Engineering, Procurement, and Construction of 2 units single cycle power plant(GE Frame 9 Turbines) with a capacity of 246 MW and 2 units heat recovery steam generation (HRSG). Engineering, Procurement, and Construction of 2 units single cycle power plant(GE Frame 9 Turbines) with a capacity of 246 MW and 2 units heat recovery steam generation (HRSG).
-
-
-
Ghods Niroo Consulting Engineers Company
-
Assaluyeh, Iran
-
Senior Project Planner
-
Feb 2007 - Dec 2007
Engineering, Procurement, and Construction of 6 units single cycle power plant project with a capacity of 942MW Engineering, Procurement, and Construction of 6 units single cycle power plant project with a capacity of 942MW
-
-
-
Oil Exploration Operations Company
-
Iran
-
Oil and Gas
-
1 - 100 Employee
-
Senior Project Planner
-
Dec 2006 - Mar 2007
Seismic Seismic
-
-
-
Tide Water Co.
-
Bandar Abbas, Iran
-
Senior Project Planner
-
Dec 2005 - Dec 2006
Construction 4 terminal containers Construction 4 terminal containers
-
-
-
Machine Sazi Arak Company
-
Arak, Iran
-
Senior Project Planner
-
May 2003 - Nov 2005
Project Type: Bridge and Petrochemical Equipment Project Description: Engineering, Procurement, and Fabrication of several projects as follows: 1)The Bridges: - Arch open spandrel Bridges - Composite box girder bridges - Truss bridges and Truss arch bridges 2)The Petrochemical Projects: - Towers of Petrochemical units - Heat exchangers of Petrochemical units - Storage vessels - Spherical storage tanks - Oil coolers of power plant projects Project Type: Bridge and Petrochemical Equipment Project Description: Engineering, Procurement, and Fabrication of several projects as follows: 1)The Bridges: - Arch open spandrel Bridges - Composite box girder bridges - Truss bridges and Truss arch bridges 2)The Petrochemical Projects: - Towers of Petrochemical units - Heat exchangers of Petrochemical units - Storage vessels - Spherical storage tanks - Oil coolers of power plant projects
-
-
-
SAB Construction Company
-
Assaluyeh, Iran
-
Project Planner
-
Feb 2002 - Nov 2002
Projects: 1) Land Reclamation of South Pars Gas Field Phases 2) Highway Construction in Pars Special Economic Energy Zone Projects: 1) Land Reclamation of South Pars Gas Field Phases 2) Highway Construction in Pars Special Economic Energy Zone
-
-
Education
-
University Of Hormozgan
Bachelor's, Industrial Engineering