Mohammad Wendy Agustion

Site Supervisor at Rasa Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bekasi Regency, West Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Food and Beverage Services
    • 1 - 100 Employee
    • Site Supervisor
      • Mar 2023 - Present

      - Make a layout design factory and office building - Ensure that the entire project progresses according to the concept that has been designed and runs well and correctly - Oversee the entire project, from planning, design, construction and commissioning, to the closing phase and be responsible for the maintenance of the company's infrastructure assets - Help create concept drawings according to the expectations of the owner and/or project team - Review each contractor's tender technical data that has been sent or submitted by the contractor - Check and study documents for construction implementation which will be used as a basis for monitoring work in the field (aspects of procedures and quality of work based on contract documents) - Supervise the implementation of construction work in terms of quality, quantity and rate of achievement of volume/physical realization - Examining drawings that are in accordance with implementation in the field (As-Built Drawings) before handover Show less

  • PT. Merbaujaya Indahraya
    • Jakarta, Indonesia
    • Engineering Infrastructure
      • Sep 2021 - Mar 2023

      - Infrastructure Planing - Make a design road maintenance - Report civil (House Building, Road Access and Bridge) - Report workshop (Excavator, Vibro, Dump Truck, Trailer, Compacto) - Report transportation ( Dump Truck, Quick Tractor, Bin System) - Project extention factory pam oil from 30 Ton/Hour to 45 Ton/Hour - Project road repair 146 Km in 1 year - Review proposal budgeting building (Road, Bridge and Building) - Report maintenance factory palm oil - Review budgetingfor 1 year Show less

    • Indonesia
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Engineering Specialist
      • Jan 2016 - Apr 2021

      - Make a chemical rebar calculation - Make a chemical anchor Calculation - Make a carbon fiber calculation - Presentation about products used in a project (chemical anchor, chemical rebar dan carbon fiber, water proofing, fire stop and fire rated) - Inspection project and control project - Tension and shear test chemical rebar and chemical rebar - Propose approval material to Owner and Main Contractor - Make a shop drawing and work methode - Explain shop drawing to tim project - Calculate estimated material requirements - Operate the chemical anchor calculation application - Operate the carbon fiber calculation application - Make a test report - Presentation calculation sheet (chemical anchor, chemical rebar and carbon fiber) Show less

    • Indonesia
    • Construction
    • 1 - 100 Employee
    • Assisten Surveyor
      • Dec 2015 - Dec 2016

      - Assist surveyors in measuring points on buildings to be built - Assist surveyors in monitoring the results of work that has been carried out - Help surveyors to make daily reports of measurement results - Create a surveyor to create a layout plan for measurement results - Helping surveyors to supervise work that requires accuracy in terms of position and level of work - Measuring the land or area before construction begins - Assist surveyors in measuring points on buildings to be built - Assist surveyors in monitoring the results of work that has been carried out - Help surveyors to make daily reports of measurement results - Create a surveyor to create a layout plan for measurement results - Helping surveyors to supervise work that requires accuracy in terms of position and level of work - Measuring the land or area before construction begins

Education

  • Universitas Mpu Tantular
    Engineer's degree, Civil Engineering
    2013 - 2017

Community

You need to have a working account to view this content. Click here to join now