Mohammad Usman

Site Civil Engineer at China National Chemical Engineering Third Construction Co., Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Masqaţ, Oman, OM

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • China
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Site Civil Engineer
      • Dec 2020 - Present

      Responsible for PTW work as a Permit applicant such as formal procedure to ensure that the system of work is properly planned and implemented for jobs which have a significant risk. • Responsible for Initiating and completing all applicable section of the permit to work. • Responsible for Supervising the work prescribe in the permit to work to ensure it is conducted in the most efficient manner. • Responsible to Notifying the issuer of work progress and completion, and ensuring that the site is returned to a safe and operational state. • Responsible for Layout, excavation, & Installation of Precast RCC Pedestal with Footings for precast pipe rack. • Responsible for Earth Work Including cutting, filling, sand bedding & post bedding for underground utilities. • Responsible for precast manhole & cover slab casting, internal & external surface preparation according to project specification and finally approved from Client. • Responsible for precast manhole & cover slab erection for storm water , sanitary , oily and chemical drainage network according to IFC Drawing and check orientation & elevation vertically. • Responsible for precast Electrical duct bank casting & external surface preparation according to project specification and finally approved from Client. • Responsible for precast Electrical duct bank erection according to IFC Drawing and check setting out & elevation vertically. Responsible for production of precast & cast in situ pipe sleeper foundation, ladder foundation, tank foundation according to IFC Drawing and check setting out, form work, rebar & elevation vertically. • Responsible for excavation & RCC of Electrical buried cable trench, Main pipe trench according to IFC Drawing and check setting out, form work, rebar & elevation vertically. • Responsible for bed preparation & compaction, form work, rebar, setting out & elevation for medium and heavy duty paving and grad slab. Show less

    • Oman
    • Construction
    • 700 & Above Employee
    • Site Engineer
      • Jul 2015 - Dec 2020

      Responsible for Permit work as a Area Authority such as formal procedure to ensure that the system of work is properly planned and implemented for jobs which have a significant risk & Validate Daily Permit after observer site condition. • Responsible for conduct Daily tool box talk with Permit Holders and provide awareness all of them regarding Hazards & Risk about daily activities. Checking excavation and laying of earth works & Asphalt base course & wearing course to ensure the laying. • Responsible for supervising the work prescribe in the permit to work to ensure it is conducted in the most efficient manner. Checking of shop drawing and bar bending schedule of piles, girder, barriers, culvert slab, wing walls, side walls and bridge base slab & deck slab. • Responsible for Layout, excavation, form work, rebar & elevation of 5000 meter storm water drain. And completed at the due date. Supervision and inspection of casting of girders (pre-stressing and post tensioning). • Responsible for Layout, excavation, form work, rebar & elevation of 1500 meter pipe trench. And completed at the due date. • Responsible for Layout, excavation, form work, rebar & elevation of 1000 meter electrical trench. And completed at the due date. Site supervision and managing inspection record. • Review RFI and forwarded to senior for the approval of the work program of the concessionaire. • Reviewed the various drawings of the contractor and took photographs of the actual site. • Performed regular surveys to ensure that the work is progressing according to the plan. • Responsible for production of painting work and check the surface preparation of wall before 1st coat of primer and check moisture in plaster with Elecometer before start the work. • Exceptional knowledge of the various construction techniques and procedures in the public works • Profound knowledge of the various engineering drawings and terminologies • Sound knowledge of project management and various field survey methods Show less

Education

  • GCT Sargodha Pakistan
    Diploma of Associate Engineer Civil, Civil Engineering Technology
    2012 - 2015

Community

You need to have a working account to view this content. Click here to join now