Mohammad Sufyan

Section Head QA/QC at AL BARRAK INDUSTRIAL SERVICES
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Muhammad Junaid

I had the pleasure of working under Mr-Sufyan's leadrship. Any company would be lucky to have Mr Sufyan as a department lead.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • BGAS CSWIP Painting Inspector Grade-2
    TWI
    Sep, 2017
    - Oct, 2024
  • CSWIP -3.1 (Welding Inspector Level – 2)
    TWI
    May, 2017
    - Oct, 2024
  • ASNT LEVEL-II ( RT,UT,DPT,MPT).
    -

Experience

    • Saudi Arabia
    • Oil and Gas
    • 100 - 200 Employee
    • Section Head QA/QC
      • Dec 2012 - Present

      ABIS is providing the maintenance /shutdown/Turn around services to oil & Gas,Petrochemical and Fertilizer companies across the KSA. 1) Study contract & specification thoroughly for developing PQP and ITP’s to meet customer’s requirements comprehensively. 2) Responsible to ensure / implement Quality Inspection Plan at site for overall execution through a well-managed team of activity Inspectors. 3) Provide technical guidance on matters related to Engineering, Maintenance and Construction team. 4) Execute detailed engineering activities using different industrial specification as ASME, API, ANSI and other International Engineering practices. 5) Provide technical assistance to proposal department at bidding stage. 6) Develop scope of work & technical specifications for Materials & Procurement. 7) Managing the work force to ensure the optimal utilization of available resources. 8) Liaison with all other sub contractors involves in different stages of construction /repair/maintenance activities to synchronize things as per master plan. 9) Attend weekly meetings with clients to shares ongoing work progress, approvals; highlight bottle necks to avoid delays & future work fronts. 10) Monitoring the running project and insure that work is being carried out as per required standard or as per spec. provided by Client 11) Keep a close coordination with execution & client and resolve site issues related to quality and expedite / monitor progress, compare with master plan. 12) Conducting audits of departmental & Projects. Show less

    • Saudi Arabia
    • Oil and Gas
    • 300 - 400 Employee
    • QC Manager
      • Jun 2016 - Sep 2017

      1) Ensure Implementation of Quality System at Project site. 2) Quality formats for various quality management systems at the projects site using the standard guidelines provided to him by the corporate office / Client specifications. 3) Assist the engineering and procurement dept to develop technical specification quarries. 4) Select, train and certify quality-critical manpower locally. 5) Attending weekly coordination meeting with the customer to review the quality levels at project site. 6) Attend to customer complaints, take corrective& preventive actions. 7) Prepare Monthly QA/QC Report and send to P.H.O for QA Manager (QA/QC) review. 8) Ensure that all Special Processes are Validated and Performed within the established parameters. 9) Follow up Corrective and Preventive actions and close out the NCR. 10) Maintain all inspection & test / Quality records. 11) Final Documents review and ensure the conformance to the PO/PR requirements as agreed, including No. of Copies either Hard/Soft. Show less

    • Saudi Arabia
    • Oil and Gas
    • 100 - 200 Employee
    • Lead QA/QC Engineer
      • Nov 2009 - Feb 2012

      1) Preparing QIP for Piping and stationary equipment.2) Conducting inspections of erection work as per QIP. 3) Preparing Work Instructions and Method Statements as required.4) Preparing WPS as per approved PQR’s.5) Plan and execute in-house quality audit program.6) Liaison with senior management regarding QA/QC matters.7) Interaction with Client for safety clearance and starting of activities.8) Develop QA&QC teams for the projects. Deploy QA&QC inspectors.9) Preparing all QA/QC documentation and technical reports for submission to client.10) Keeping track of acceptance & rejections of all Application for Inspections (AFI) initiated.11) Keen monitoring of project activities to ensure that jobs are carried out as per approved quality plan, procedures, and client specification.12) Coordination of all inspection and testing activities with project execution team, preparation of inspection & testing schedules.13) Supervising NDT (RT, DPT, UT and MPI) Preheating, and Post Weld Heat Treatment of the welded joints as per Designer’s Specifications and WPS.14) Inspection of maintenance jobs for Columns, Vessels, Heat exchanger, Pressure Safety Valve (PSV’s), Non Return Valve (NRV’s) and Fugitive Emission Valves.15) Supervising Welder Qualification Test (WQT) and preparing records.16) Analyzing the rejection and repair data to propose remedial measure.17) Prepare, Plan and Conduct internal audit and initiate Corrective Actions.18) Up keeping quality records/reports for Equipment installation, Steel Structure & Piping work.19) Preparing and updating Non-conformance log.20) Line walking and punch listing of RMC. 21) Witnessing of Hydro test, Leak test, Pneumatic test, Flushing/Air Blowing and Baroscopic inspection activities.22) Dossiers preparation to release spools from fabrication shop with related inspections 23) Preparing & submitting the final dossier to client. Show less

    • Lead QA/QC Engineer
      • Nov 2009 - Jan 2012

    • QC Engineer
      • May 2009 - Nov 2009

      Worked as QA/QC Engineer with Pipe link construction & maintenance services, there i had diversified experience of working at Oil & Gas plants which provided me knowledge and experience to enhance my professional skills, working with clients like OMV & ENI. 1) MIANO -13 WELLHEAD DEVELOPMENT PROJECT. It involves in prefabrication, erection and installation of CS & Duplex Piping with underground and above ground piping along with all inspection and tests met all the QC standards. 2) LATIF -2 EWT FACILITY DEVELOPMENT PROJECT. It involves in prefabrication, erection and installation of CS & Duplex Piping with underground and above ground piping along with all inspection and tests, to meet all the QC standards. 3) LATIF -1 WELLHEAD DEVELOPMENT PROJECT. Participated in the construction and maintenance, Attend client quality management meetings, Coordinate all QA/QC activities with the site QC manager. Control all achieves documentation upon the completion of the project Show less

    • Pakistan
    • Manufacturing
    • 700 & Above Employee
    • QC Engineer
      • May 2005 - Apr 2009

      Preparing different type of Quality Reports, material inspection, in-process inspection and final inspection; 1) Implementation & verification of Quality & Environmental Standards during production. 2) Planning & implementation of annual audits & training program. Providing training regarding ISO-9001, ISO-14001 & HSE protection to different Levels of working & management classes. Preparing different type of Quality Reports, material inspection, in-process inspection and final inspection; 1) Implementation & verification of Quality & Environmental Standards during production. 2) Planning & implementation of annual audits & training program. Providing training regarding ISO-9001, ISO-14001 & HSE protection to different Levels of working & management classes.

Education

  • Mehran University of Engineering and Technology Jamshoro
    Bachelor's degree, Mechanical Engineering
    2000 - 2004
  • Mehran University of Engineering and Technology Jamshoro
    Bachelor's degree, Mechanical Engineering
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now