Mohammad Sohail

Electrical Engineer / Technical Manager at Shandong Tiejun Electrical Power Company Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Umluj, Tabuk, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer / Technical Manager
      • Jun 2021 - Present

       Developing management plans and provide sub-contractors with execution drawings, ensure that works are executed as per drawings, and evolving as scheduled, check on the quality of works deliverables and specs to ensure a proper design implementation.  Managing project initiation and execution through scheduling all relevant phases and work activities to ensure timely and work optimization and ensure that all the works are executed as per company’s policies and procedures and project-specific approvals from management.  Close coordination with client, Consultant and internal management.  Project Management, Project execution and Electrical construction work inspection.  Review and submission of shop drawings and BIM models to the client/Consultant for approval.  Attend weekly Progress and coordination meetings with client, Consultant and sub-contractors.  Review and acceptance of Monthly progress report/payment of subcontractors.  MEP design/Technical Engineering, BIM models and shop drawings coordination.  Prepare Request for Information (RFI), generates change order and/or work orders.  Implementation of work according to IFC and Shop drawings.  Maintain the different phases of the project and evaluate all the technical problems and resolve them.  Schedule the work in accordance to project timeline and deadline.  Assist the site subcontractors in the resolution of drawing interpretation.  Monitoring/Inspecting installation of conduits and sleeves for MV, LV and ELV Systems.  Supervision/Inspection of earthling, bonding works and Lightening system.  Review sub contractors’ submittals related to electrical discipline addressing method of statements, Project Quality Plan, Safety Plan, Schedules and compliance with Project specification.  HSE rules and regulations implementation on site to avoid risks.  Maintain the safety measures on site and ensure that all quality control regulations are met. Show less

    • MEP QC Engineer
      • Nov 2019 - Mar 2021

      ✓ Implementation of all test and inspection schedules, ensure adherence to all procedures. ✓ Monitor an efficient system, record all project activities, and analyze all processes to ensure all work meets quality requirements. ✓ Maintain knowledge upon quality assurance standards, monitor continuous application for all quality assurance process and corrective actions for all operations. ✓ Design knowledge of plumbing (drainage & water supply) system. ✓ Review and approval of material’s submittals for MEP works. ✓ Review and prepare all MEP technical queries & submittals submitted by contractor to the Consultant. ✓ Preparation of mock-up area for all major services to get consultant approval. ✓ Coordination among different contractors to arrange weekly meeting at site to monitor site progress. ✓ Coordination with client, project management, consultant, sub- contractor and making necessary changes in shop drawings to suit the site conditions. ✓ Inspection of materials at site before raising inspection request to consultant. Meet the clients or their representatives at site. ✓ Ensures the quality records, acceptance certificates and the documentation for specific systems and Buildings/areas are prepared and collated in accordance with project requirements. ✓ Attend the weekly QC meetings. ✓ Responsible for developing, implementing and managing the site qualifications and requalification of existing analytical equipment. ✓ Be Deputy of QC Engineer in reviewing and approving the execution of the analytical activities for the batch release if needed when QC Manger was not on site. Show less

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Electrical Site Engineer
      • Sep 2018 - Oct 2019

      ✓ Practically worked in tier 3 Data Center. ✓ All Electrical related works, Planning and reporting. ✓ To have close coordination with customer, Consultant and internal management with respect to the complaints escalated by Private and semi government authorities. ✓ Manage the design, construction, installation, configuration in scope of Data centre infrastructure. ✓ Own the relationships with 3rd party services we use to build our infrastructure. ✓ Site Survey /Identification of communication rooms at all sites. ✓ Staging, Inspection & Site Preparation. ✓ Equipment Installation and Commissioning at Locations/Site Integration. ✓ Daily plan sharing and progress report with Client. ✓ Quality control and quality assurance. ✓ Be on call 7x24x365 if management escalation is required to respond to facilities concerns and emergencies. Show less

    • China
    • Telecommunications
    • 700 & Above Employee
    • Project Coordinator / Engineer
      • Aug 2017 - Aug 2018

      ✓ Site visits regarding CW and Cable Pulling. ✓ Supervising the Fiber Pulling in Pipes according to SLD. ✓ Supervising the OSP civil work, Making of HH/MH pits and installation of HH/MH, making of trenches, pipe laying and coupling, Nala and Bridge attachment, back filling and Re-instatement as per specifications and ensuring the quality. ✓ Supervised the RCC batching plants and inspecting the Hand Hole/Main Hole Pouring. ✓ Data collection and updating daily Progress tracker of OFC and CW. ✓ Gather data from all SE’s regarding CW, Main fiber Pulling, Drop Fiber and send over all progress report to the customer. ✓ Comprehensive understanding of SLD. ✓ Updating Master Tracker on Microsoft Excel of OSP and OFC work on daily basis with signed checklist from the customer. ✓ Sharing daily plan with the customer. ✓ Have worked efficiently on Microsoft word. Show less

    • Junior Electrical Engineer
      • Jun 2016 - Jun 2017

      ✓ Practically worked on different sites regarding HT (11kv) & LT (440v) faults. ✓ Worked on feeders fault. ✓ Supervised different step-up and step-down transformers fault. ✓ Practical knowledge of all engineering related work. ✓ Have worked efficiently on Microsoft word. ✓ Practically worked on different sites regarding HT (11kv) & LT (440v) faults. ✓ Worked on feeders fault. ✓ Supervised different step-up and step-down transformers fault. ✓ Practical knowledge of all engineering related work. ✓ Have worked efficiently on Microsoft word.

Education

  • Abasyn University Peshawar
    Bachelor of Engineering - BE, Electrical, Electronics and Communications Engineering
    2011 - 2015
  • Govt Degree College Mingora Swat
    FSc, Pre-Engineering
    2009 - 2011

Community

You need to have a working account to view this content. Click here to join now