mohammad awada
site engineer at ACC-ATS- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
French Professional working proficiency
-
Arabic Native or bilingual proficiency
Topline Score
Bio
Experience
-
Debbas Group
-
Lebanon
-
Mechanical Or Industrial Engineering
-
100 - 200 Employee
-
site engineer
-
Aug 2016 - Present
Climtech-ATS ( currently, from 27/7/2016)Job title: mechanical site engineer supervising the work flow on site.Water front city ( M buildings,dbayi). Responsible for follow –up of:*all mechanical services distributed in buildings, mechanical services inside floors, fans rooms, technical rooms,VRV system,pluming,ducting…*external network for rain water pipes, sewage pipes, water supply.*inspector for the works flow on site.
-
-
mechanical site engineer
-
Aug 2013 - Aug 2016
Debbas enterprise (currently, from 15/8/2013) Job title : mechanical site engineer supervising the work flow on site And as built drawings. • Summerland hotel resort (al jinah). Responsible for follow –up of:*all mechanical services distributed in the hotel, firefighting pipes as per NFPA comments, ducting ,piping,plumbing,AHU rooms,fire pumps rooms,chiller rooms…..*inspector for the works flow on site. Show less
-
-
-
Al Bonian Group
-
Lebanon
-
Wholesale
-
1 - 100 Employee
-
Site Engineer
-
Nov 2011 - Aug 2013
Job Title: Mechanical site Engineer supervising the work flow on site And as built drawings. • Beirut City Center ( BCC, 196000m2) – Hazmieh. Responsible for follow-up of: *fire pumps room, submersible pumps ,chiller and cooling tower rooms *external network for rain water pipes, sewage pipes, water supply. *all mechanical services distributed in the floor of mall, firefighting pipes as per NFPA comments, ducting ,piping, connection of FCU’s,AHU rooms… Job Title: Mechanical site Engineer supervising the work flow on site And as built drawings. • Beirut City Center ( BCC, 196000m2) – Hazmieh. Responsible for follow-up of: *fire pumps room, submersible pumps ,chiller and cooling tower rooms *external network for rain water pipes, sewage pipes, water supply. *all mechanical services distributed in the floor of mall, firefighting pipes as per NFPA comments, ducting ,piping, connection of FCU’s,AHU rooms…
-
-
-
meemar
-
beirut
-
Mechanical Engineer
-
Sep 2009 - Oct 2011
Meamar Engineering and Contracting (10/9/2009 to 20/10/2011) Job Title: Mechanical site Engineer supervising the work flow on site and responsible to finalized the as built drawings. • SOHMOR Hospital • Educational Compound in maaroub content 5floor, the total area of compound is 10000m2. Meamar Engineering and Contracting (10/9/2009 to 20/10/2011) Job Title: Mechanical site Engineer supervising the work flow on site and responsible to finalized the as built drawings. • SOHMOR Hospital • Educational Compound in maaroub content 5floor, the total area of compound is 10000m2.
-
-
-
-
Mechanical Engineer
-
Mar 2009 - Aug 2009
Adnan Alayan engineering Office (from 3/3/2009 to 3/8/2009). Job Title: Preparation of calculation studies for different systems over different projects (hotel, village…..). Sub-Contracting MEP contracts. Job Title: Mechanical Team Leader responsible to finalize the project from initiation till closing (testing and commissioning). • Tebnin building: installation for mechanical systems in the building (drainage, water supply,cooling,heating).the building content 4 floor ,the total area of building is 2000m2 Show less
-
-
Education
-
lebanese university faculty of engineering
Master's Degree, mechanical engineer