Mohammad Ali Muttaqi

Associate at Frequency
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
NZ
Languages
  • English Native or bilingual proficiency
  • Urdu Native or bilingual proficiency
  • Hindi Native or bilingual proficiency
  • Chinese Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Practising Project Manager
    Australian Institute of Project Management AIPM
    Aug, 2018
    - Nov, 2024

Experience

    • New Zealand
    • Construction
    • 1 - 100 Employee
    • Associate
      • Mar 2021 - Present

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Project Manager
      • May 2016 - Mar 2021

      Project Manager – City Rail Link (October 2019- Present) Delivered through the Link Alliance, the City Rail Link Project is the largest infrastructure project of New Zealand to date. This involves the construction of three new stations as well as the construction of various tunnels to connect these stations to the existing rail network, forming a circular loop around Auckland’s Central Business District. Project Manager – Dunedin City Council (February 2019 – August 2019) The Project involves a one for one replacement of obsolete sodium lights with modern, energy efficient LED lights as well as providing an Internet-of-Things (IoT) solution for remote centralised management of the status of the lights. Contract Administration – AECOM, Auckland International Airport (February 2017 – February 2019) Refurbishment and extension of the International departure terminal including full upgrade of Emigration facilities and Retail facilities Show less

    • New Zealand
    • Utilities
    • 700 & Above Employee
    • Business Development Intern
      • Nov 2015 - Jun 2016

      - Research and evaluation of technologies to develop an automatic LPG reordering system - Coordinating between external vendors with manufacturing capabilities and internal functions such as retail and business development to develop a build able and scale able product which adds to the customer experience - Providing a cost benefit analysis for the project based on risk assessment, technology evaluation and vendor evaluation - Research and evaluation of technologies to develop an automatic LPG reordering system - Coordinating between external vendors with manufacturing capabilities and internal functions such as retail and business development to develop a build able and scale able product which adds to the customer experience - Providing a cost benefit analysis for the project based on risk assessment, technology evaluation and vendor evaluation

    • China
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Process Development Engineer
      • Feb 2014 - May 2015

      - Front camera module manufacturer for Apple, Samsung, LG etc - Responsible for ‘front of line’ production with focus on Stud bump and flip chip process. - Assisted in yield improvement activities in mass production - Conducting DOEs to evaluate efficacy of parameters - Preparing FACA reports including 8D reports using 4M methodology - Front end communication with suppliers as well as customers to troubleshoot and analyze production issues - Coordinate Production and Machinery related concerns between internal parties and external stakeholders - Commissioning and stabilizing machinery for mass production - Targeting and resolving machine errors along with maintenance engineers to minimize downtime - Carrying out tests to ensure machine and process efficiency within given parameters Show less

    • United Kingdom
    • Tobacco Manufacturing
    • 700 & Above Employee
    • Engineering Intern
      • Dec 2013 - Jan 2014

      - Working knowledge of the primary manufacturing department and all related processes including relevant machinery involved in respective processes: 1) Lamina conditioning, cutting , drying 2) Stem conditioning, cutting, drying - Process optimization of lamina conditioning process in the following capacities: 1) Quality 2) 5S 3) Environment health and safety 4) Preventive maintenance 5) Corrective maintenance - Introduction to industry health and safety standards Show less

    • Pakistan
    • Oil and Gas
    • 1 - 100 Employee
    • Intern
      • Jul 2011 - Jul 2011

      - Acquainted with the dynamics of different departments responsible for the extraction of oil such as Tubing Conveyed Perforation, Drill Stem Testing, Wire line Logging and Surface Well Testing - Familiarized with the use of different equipment, their specifications and the maintenance of said equipment - Familiarized with the workings of the petroleum industry along with the different safety regulations associated with it - Trained to work in a team to provide quality services while complying with the given time frame Show less

Education

  • University of Auckland
    Master’s Degree, Engineering/Industrial Management
    2015 - 2016
  • The Hong Kong University of Science and Technology
    Bachelor of Engineering (BEng), Electrical and Electronics Engineering
    2010 - 2013
  • Georgia Tech
    Bachelor of Engineering (B.Eng.), Electrical and Electronics Engineering
    2012 - 2012

Community

You need to have a working account to view this content. Click here to join now