Mohammad Al-Shaddad
Construction Manager at AL-AMRY GROUP (ATGC)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English, Old (ca.450-1100) -
Topline Score
Bio
Credentials
-
DM Approval For G+1
Dubai MunicipalityApr, 2013- Nov, 2024 -
Primavera P6
Emirates Institute for Technology - Abu DhabiFeb, 2012- Nov, 2024
Experience
-
Al Amry Group
-
United Arab Emirates
-
Construction
-
1 - 100 Employee
-
Construction Manager
-
Oct 2014 - Present
Project : Sheikha Fatima Palace – Khalifa City Description : Create a Cast insitue Palace with 5 Pre-Cast service blocks. Consultant : Hans Knutzen Associates , INC Client : Crown Prince Court of Sheikh Mohammed Bin Zayed.Responsibilities• Following up and controlling site activities including distribution of the working team to proceed with the site works in accordance with the short-term schedule of works, following materials with suppliers• Controlling the quality of work, keep in touch and coordinating with the technical department and consultant, … etc Show less
-
-
Senior Project Engineer (ATGC)
-
May 2014 - Oct 2014
Project : Mock-up Villa in Al-Raha Beach Description : Create a pre-cast villa within 4 months only from A to ZConsultant : Sadeer Engineering Consultants Client : Crown Prince Court of Sheikh Mohammed Bin Zayed.Responsibilities• Following up and controlling site activities including distribution of the working team to proceed with the site works in accordance with the short-term schedule of works, following materials with suppliersControlling the quality of work, keep in touch and coordinating with the technical department and consultant, … etc Show less
-
-
-
Al Amry Group
-
United Arab Emirates
-
Construction
-
1 - 100 Employee
-
Project Engineer (GENCO-MAMMUT JV)
-
Oct 2010 - Oct 2012
Abu Dhabi - United Arab Emirates Project : Civil Defense Training Academy Description : Fifteen buildings with different types of civil work (pre-cast/cast insitue/steel structure/Road work - infrastructure works/U/G tanks) Consultant : Zone Architect Engineering Consultancy Owner : Secure PM-LLC Dubai - United Arab Emirates Project : Water Front (Jebel Ali) Four Pre-Cast Buildings (Basement + GF + 4 Floors + Roof) for each building Each floor include 8 flats (2 bed rooms / 3 bed rooms) Consultant : Woods Bagot Client : Nakheel Responsibilities • Following up and controlling site activities including distribution of the working team to proceed with the site works in accordance with the programme of works, following materials with suppliers • Controlling the quality of work, keep in touch and coordinating with the technical department and consultant, … etc Show less
-
-
-
Nsco construction company
-
Sharjah – United Arab Emirates
-
Project Engineer
-
Jan 2009 - Oct 2010
Project : Residential Tower in Al Taawon area G+4P+24TF+PH+HC+2S+HP Consultant : Mazaya Consulting Engineering Responsibilities • Full manage and control on site activities including distribution of the working team to proceed with the site works in accordance with the programme of works, controlling the quality of work, handing over the completed works to the consultant, … etc Project : Residential Tower in Al Taawon area G+4P+24TF+PH+HC+2S+HP Consultant : Mazaya Consulting Engineering Responsibilities • Full manage and control on site activities including distribution of the working team to proceed with the site works in accordance with the programme of works, controlling the quality of work, handing over the completed works to the consultant, … etc
-
-
-
-
Site Engineer
-
Apr 2008 - Jan 2009
Water supply and drainage network for cities in Al-Madina Al-Monawra . Client : Government Project Consultant : Almadina Municipality Water supply and drainage network for cities in Al-Madina Al-Monawra . Client : Government Project Consultant : Almadina Municipality
-
-
-
-
Site Engineer
-
Jul 2007 - Apr 2008
One Villa in alsaboora . One Villa in alsaboora .
-
-
Education
-
Damascus University
65.8 -
Damascus University
65.8 %, Civil Engineering