mohamed Sabry

Commercial Manager at Watania For Trading & Contracting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Alexandria, Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Construction
    • 1 - 100 Employee
    • Commercial Manager
      • Jun 2015 - Present

    • Technical Office Manager
      • Jul 2015 - Present

      Duties Performed:During Tender Phase:Manage, Follow Up and Review tender projects during the following stages:• Preparation of the Project Summary.• Quantities Surveying.• Tender Documents Study: Scope of Work, BOQ, Specifications & Drawings.• Review design provided by consultants in case of design and built projects.• Mechanical Systems’ Packages Preparation.• Issuance of (Request for Quotation) to subcontractors and suppliers and communicating with them until receiving fully compliant quotations.• Preparing Comparison Sheets for Mechanical Systems (HVAC, Firefighting, Compressed Air and Plumbing)• Price Estimation based on Technical and Commercial cost assessment derived from Comparison Sheets.• Preparation of the Proposal Tender Files (Technical + commercial)During Construction Phase:Manage, Follow Up and Review project submittals during the following stages:• Update comparison sheets created during tender phase.• Procurement department stress on all suppliers till reach the best technical and financial choice.• Prepare technical submittal for selected supplier/manufacture.• Covering consultant comments (if any) till submittal approval. Show less

    • Egypt
    • Construction
    • 700 & Above Employee
    • Senior Mechanical Estimator Engineer
      • Sep 2012 - Jul 2015

      Duties Performed:• Preparation of the Project Summary.• Quantities Surveying.• Tender Documents Study: Scope of Work, BOQ, Specifications & Drawings.• Review design provided by consultants in case of design and built projects.• Mechanical Systems’ Packages Preparation.• Issuance of (Request for Quotation) to subcontractors and suppliers and communicating with them until receiving fully compliant quotations.• Preparing Comparison Sheets for Mechanical Systems (HVAC, Firefighting and Plumbing)• Price Estimation based on Technical and Commercial cost assessment derived from Comparison Sheets.• Preparation of the Proposal Tender Files (Technical + commercial)Projects studied since 2012:Project / Location / MEP Value In USDSecurity Forces Medical Center Infra PKG / KSA / 330,000,000King Abdel-Aziz Project (KAP#3) / KSA / 50,000,000Field Operating Division Camp (M045) / Iraq / 118,400,000DS7 Central Support Facilities (M090) / Iraq / 48,000,000Mecca Tunnels / KSA / 238,000,000CFC Living Apartments / Egypt / 18,000,000Baghdad Elevated Train / Iraq / 158,000,000Emaar Package #50 / Egypt / 11,000,000Government Agencies Compound / KSA / 285,000,000Schlumberger Integration Base project / Egypt / 20,000,000 Show less

    • Talent Program Mechanical Engineer
      • Apr 2010 - Sep 2012

      Selected internally from the HR department to join a well-organized program named Talent Program for which the selected engineers will rotate over the company’s departments to gain experience and after 27 months a re-assessment shall be carried out for the selected candidates.July 2012 – September 2012Position: Mechanical Procurement EngineerLocation: Head OfficeFebruary 2012 – July 2012Position: Mechanical EstimatorLocation: Head OfficeDecember 2011 – February 2012Position: Cost ControllerLocation: Head OfficeDuties Performed:• Budgeting September 2011 – December 2011Position: PlannerLocation: Head OfficeDuties Performed:• Tender Time Schedule• Resources HistogramsMarch 2011 – September 2011Position: Technical Office EngineerProject: North Coast Boosters ProjectDuties Performed:• Shop Drawings- Boosters & Pump Station• P & ID Review• Quantity Survey June 2010 – March 2011Position: Site EngineerProject: Abu Qir Thermal Power Plant ProjectDuties Performed:• UnderGround Piping- HDPE pipes “High Density Polyethylene”- RCCP “Reinforced Concrete Cylinder Pipe”- Cast Iron pipes- Carbon Steel pipes• Plumbing System• Galvanized steel pipes for water supply system.• UPVC for drainage system.April 2010 – June 2010Position: Site EngineerProject: Marrassi ProjectDuties Performed:• HVAC System “Split Units”• Plumbing System.- Polypropylene pipes for water supply system.- UPVC pipes for drainage system. Show less

    • Mechanical Quality Control Engineer
      • Dec 2008 - Apr 2010

      Work Experience:• HVAC, Fire Fighting and Plumbing Systems.• Utility (Sewage, Storm, Fire Fighting ,Chilled Water and Irrigation) Networks.• Sewage Treatment Plant.• Baggage Handling System.

    • Site Engineer
      • Sep 2008 - Dec 2008

      Responsible for the following systems: - Air Conditioning. - Fire Fighting. Responsible for the following systems: - Air Conditioning. - Fire Fighting.

Education

  • Alexandria University
    Bachelor's degree, Mechanical Engineering
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now