Mohamed Ismail

Head Of Department at First Group Engineering Services
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Egypt, EG
Languages
  • Arabic -
  • English -
  • Germany Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • NDT Certificates
    Suez Germany Welding Center
    Feb, 2012
    - Oct, 2024
  • Design, application and operation of Centrifugal Pumps
    PUMPSENSE FLUID ENGINEERING PVT LTD
    May, 2011
    - Oct, 2024
  • Operating, Maintenance and control programing for WHQ 13 CNC machine
    TOS VARNSDORF
    Jan, 2011
    - Oct, 2024

Experience

    • Egypt
    • Oil and Gas
    • 1 - 100 Employee
    • Head Of Department
      • Jan 2019 - Present

    • Service Manager
      • Dec 2017 - Present

    • Mexico
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Maintenance and commissioning Engineer
      • Feb 2008 - Dec 2017

      • Provide technical expertise to resolve products/systems problems or recommend improvements for customer installation.• Perform pump and system diagnostic and analysis including review of pumps application and operation, pump design and materials, pumps vibration.• Identify and resolve any defect(s).• Provide Failure Analysis and Field Reports for customers + recommend upgrades and complete expense claims and time sheets to cover on site visits.• Provide technical assistance to sales force and customers in troubleshooting pump and system problems.• Train customers and employees on operation and maintenance of pumps• Analyze customer warranty claims for validity and take necessary action to satisfy RuhrPumpen warranty policy. Involve other departments, as required, to obtain resolution to warranty claims includingSupervise & perform all installation, commissioning, & maintenance activities regarding the units at client fieldPrepare Standard Work Procedure [SWP] of assembly, maintenance for units at both client field & factory workshopTrouble shoot the male functioning units at client fieldAssemble new units in factory workshop as on floor engineer in compliance with the quality control policy with co-operation with the engineering department to make control over document revisions, reduce back log activities & improve productivityPrepare & supervise all the required installations, for testing the units in factory test bed, including identifying required testing procedure for each equipment

    • Spare Parts & Welding and Fabricating Engineer
      • May 2010 - Sep 2012

      • Spare parts engineer responsible for quoting the spares that were requested fby the client and make follow up until deliver it to the client • Responsible to manufacture all the parts for pumps either it is from RUHRPUMPEN or any other manufacturer• Manufacturing Base Plate for the new projects for pump assemblies manufactured by RP® Egypt & Germany • Manufacturing the Discharge Head for RP® Vertical Pumps typesa. Vertical Pump VMT 37 KXL (VS6 acc. To API 610)b. Vertical Pump VTP 12B (VS1 acc. To API 610)• Manufacturing the discharge Head for BAYRON JACKSON Pump• Manufacturing the Column Pipes for RP® Vertical Pumpsc. Vertical Pump VMT 37 KXLd. Vertical Pump VTP 12B• Build up the Seal Planning System for RP® Pumps for different Plans

    • Maintenance and commissioning Engineer
      • Jan 2009 - Jan 2010

      IN Saudi Arabia (KSA)1. SAUDI KAYAN – SABIC –  Working as Field Service Engineer for RUHRPUMPEN Tulsa USA Branch and I was Responsible for a new project and it was submitting about between 400 and 500 pumps with several types, dealing the following subcontractors :A. CTCI ( Taiwanese Contractor ) B. KBR ( American Contractor )C. FLUOR ( American Contractor )D. TR ( Spanish Contractor )E. SAMSUNG ( Korean Contractor )My mission was to:  check all the pumps on site (to make the installation and the pre-commissioning) as per the request from the client that they have to have a field service engineer on site Issuing all the root cause reports that lead to the problem  Leader for the team that was on site  Issuing all the work permit was needed for my colleague to work on site Build a new work shop accepted by the client on site to able us solve any troubles with the pumps on site to save time  Make a strong exist for the company in this area as it wasn’t exist before and we have now our sales office and our facility to serve this area and I was Responsible for a new project and it was submitting about between 400 and 500 pumps with several types, dealing the following subcontractorsMy mission was to: check all the pumps on site (to make the installation and the pre-commissioning) as per the request from the client that they have to have a field service engineer on siteIssuing all the root cause reports that lead to the problem Leader for the team that was on site Issuing all the work permit was needed for my colleague to work on siteBuild a new work shop accepted by the client on site to able us solve any troubles with the pumps on site to save time Make a strong exist for the company in this area as it wasn't exist before and we have now our sales office and our facility to serve this area

    • Maintenance Engineer
      • Aug 2007 - Feb 2008

      Responsible for maintenance the reciprocating compressors Responsible for maintenance and fabricate heat exchangers Responsible for maintenance the rotating equipment Responsible for maintenance the reciprocating compressors Responsible for maintenance and fabricate heat exchangers Responsible for maintenance the rotating equipment

Education

  • Faculty of engineer
    bachelor, Mechanical Power DEPT
    2003 - 2007

Community

You need to have a working account to view this content. Click here to join now