Mohamed imthiyaz

Instrumentation Engineer at M/s punjlloyd Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kuwait, KW
Languages
  • English -
  • Tamil -
  • Hindi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • • Honeywell ESVT LCN/UCN/HPM Troubleshooting and Maintenance Training Course
    Honeywell
    Jun, 2015
    - Oct, 2024
  • • International minimum industry safety training with OPITO approved from borouge, – Abu Dhabi polymers , Abu Dhabi
    Borouge
    May, 2014
    - Oct, 2024
  • Permit to Work Applicant (PTW Signatory) course
    National training institute llc (NTI)
    Sep, 2011
    - Oct, 2024

Experience

    • Oil and Gas
    • 300 - 400 Employee
    • Instrumentation Engineer
      • Dec 2016 - Present

      Project : Expansion and revamping of ahmadi depot – LMClient : KNPC (Kuwait National Petroleum Company)Project Description : Expansion and revamping of Ahmadi depot project where in total fire and gas alarm and action, ESD implementation was done apart from terminal automation system and implemented for entire facility existing seven tank and gantry to new eleven double deckfloating roof tank multiproduct loading gantry ,automatic tank gauging automatic sampling… Project : Expansion and revamping of ahmadi depot – LMClient : KNPC (Kuwait National Petroleum Company)Project Description : Expansion and revamping of Ahmadi depot project where in total fire and gas alarm and action, ESD implementation was done apart from terminal automation system and implemented for entire facility existing seven tank and gantry to new eleven double deckfloating roof tank multiproduct loading gantry ,automatic tank gauging automatic sampling system vapor recovery system modification as per the new requirement Roles & Responsibilities• Installation, pre-commissioning and commissioning of TAS (FMC) with open system architure tankage system and marshalling panels & control panels.• Installation and pre commissioning & commissioning Loading and unloading Gantry automation • Installation ,pre-commissioning & commissioning Fire alarm system (Honeywell – XLS 3000) and related F & A instruments like smoke ,heat and gas detector & all type modules with SLC intelligent loop and SFAP marshalling panels• Installation, pre-commissioning and perform cause and effect checking in Gas suppression control system with Honeywell (XLS –140) and pre-comm &commissioning VESDA –VLP (Xtralis) system • Vapor recovery system (Aereon) modification and perform cause and effect • Installation, pre-commissioning and commissioning Leak detection system (Pentair)with wireless communication• Installation and pre-commissioning and commissioning deluge (Naffco) system Show more Show less

    • Instrumentation Engineer
      • Jul 2015 - Dec 2016

    • Instrumentation Engineer
      • May 2014 - Jul 2015

    • instrumentation engineer
      • May 2011 - Mar 2014

      Client : Petroleum Development Oman (PDO) Project Description : Petroleum Development of Oman’s Harweel Phase 2 & 3 facilities Projects, Birba and Marmul development projects work Involving Oil production Wells. Roles & Responsibilities • Installation and pre-commissioning and commissioning of instrumentation system of crude production well head… Client : Petroleum Development Oman (PDO) Project Description : Petroleum Development of Oman’s Harweel Phase 2 & 3 facilities Projects, Birba and Marmul development projects work Involving Oil production Wells. Roles & Responsibilities • Installation and pre-commissioning and commissioning of instrumentation system of crude production well head like Beam Pump, PCP, ESP, WATER INJECTION, POLYMER INJECTION MSV, RMS and RGMS with SCADA Communication and High pressure oil production wells with DCS Controls• Perform loop checking, functional checking, Cause & Effect checks conducting operational test procedures, commissioning & trouble shooting of all sorts of instrument & its related equipments • Installation and Commissioning of Well Head control (IPS/FCS) Panel (Yokogawa Prosafe, Triconex Emerson & Delta-v, Invensys and Honeywell )• Installation and Commissioning of well head Hydraulic control Panel (Petronash)• Installation &testing and commissioning of fibre Optic cable and accessories and F&G instruments and flow line instruments.• Installation, testing and commissioning of fibre optic cable and accessories from wellhead to RGMS as well as fibre optic transmission node (OTN).• Installation and commissioning of down hole gauge panels ( weatherford)• Installation and termination of all hydraulic tube and tray and hydraulic tube oil flushing and testing as per QWP and scope •Perform site acceptance tests as required during the project phase.•To coordinate with other divisions and department and vendors for all ongoing projects.•Preparation of Quality control documents like calibration reports, impulse leak test reports and cable continuity reports. Show more Show less

    • Instrumentation Engineer
      • May 2009 - Apr 2011

      •THERMAX AFBC boiler (under bed feeding) of 64 KG/CM2, Capacity - 80 TPH, did erection, commissioning and maintenance.•IMPULSE REACTION TURBINE - SIEMENS make, Capacity -15 MW did erection and commissioning.•Installation, commissioning and Maintenance of Dense Phase Pneumatic Fly Ash handling system.•Installation, commissioning and Maintenance of De-Mineralization Water Plants Instruments with PLC systems.•Commissioning and Maintenance of Coal Handling Plant PLC automatic… •THERMAX AFBC boiler (under bed feeding) of 64 KG/CM2, Capacity - 80 TPH, did erection, commissioning and maintenance.•IMPULSE REACTION TURBINE - SIEMENS make, Capacity -15 MW did erection and commissioning.•Installation, commissioning and Maintenance of Dense Phase Pneumatic Fly Ash handling system.•Installation, commissioning and Maintenance of De-Mineralization Water Plants Instruments with PLC systems.•Commissioning and Maintenance of Coal Handling Plant PLC automatic Control systems for power plant. Show more Show less

    • Instrumentation Engineer & Asst Engineer
      • Jun 2006 - Apr 2009

      •Erection, commissioning and maintenance of THERMAX AFBC boiler (over bed feeding) with 105 KG/CM2 - 105 TPH Capacity.•Erection, commissioning and maintenance of HANGZHOU STEAM TURBINE with 25 MW Capacity.

Education

  • University of Madras
    -

Community

You need to have a working account to view this content. Click here to join now