Mohamed Eid

Chief Land Surveyor - Team Leader at QD-SBG Construction
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cairo, Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Holds a Training Course On The Device Trimble 5500 GPS From Trimple Company.
    -
  • Holds a Training Course On The Device Viva TS 15 Total Station From Leica Company .
    -

Experience

    • Qatar
    • Construction
    • 500 - 600 Employee
    • Chief Land Surveyor - Team Leader
      • Feb 2016 - Present

      Key Projects: 1- CP07B Lusail Plaza Infrastructure, LRT Station, Public Car Park and Landscape. 2- BP12 Enabling/Early Works, Excavation, Piling and Substructure. Responsibilities:  Receipt of the Location from the Consultant.  Establishing High Accuracy Control Points either by Traverse or Triangulation Method  Build maps, sketches, and charts.  Leading Work Team at Site.  Purchase and maintain equipment  The Work of Raising the Cadastral of the Project to Determine the Natural Levels of the Ground.  Follow-up Drilling and Filling in the Project.  Calculate Quantities of Drilling and Reclamation of the Project and Follow up with Contractors Extracts.  Matching Structural Drawing with Architectural Drawing to Ensure That the Work Is Going in the Right Way.  Execute an Oriented Drawing to the Project Local Coordinates in Various Formats and Give it to the Surveyor to Setting Out on the Site.  Coordinating With Other Disciplines  Submit Reports on survey work results to the client Show less

    • Saudi Arabia
    • Construction
    • 700 & Above Employee
    • Senior Surveyor
      • Dec 2005 - Feb 2016

      Key Project 3- King Abdul-Aziz International Airport Development Project (Phase1) Jeddah 4- Development King Abdul Aziz Airport, Main Hajj Terminal and Support Facilities 5- Jamarat Bridge, Developing the Bridge and the Surrounding Area Responsibilities:  Receipt of the Location from the Consultant.  Establishing High Accuracy Control Points either by Traverse or Triangulation Method  Leading Work Team at Site.  The Work of Raising the Cadastral of the Project to Determine the Natural Levels of the Ground.  Follow-up Drilling and Filling in the Project.  Calculate Quantities of Drilling and Reclamation of the Project and Follow up with Contractors Extracts.  Matching Structural Drawing with Architectural Drawing to Ensure That the Work Is Going in the Right Way.  Execute an Oriented Drawing to the Project Local Coordinates in Various Formats and Give it to the Surveyor to Setting Out on the Site.  Coordinating With Other Disciplines Show less

    • Egypt
    • Construction
    • 700 & Above Employee
    • Land Surveyor
      • Jul 2004 - Dec 2005

      Key Project 6- Beverly Hills Villas and Buildings, EGYPT Responsibilities:  Conduct surveys on land sites and properties  Examine previous records and evidence to ensure data accuracy  Research and design methods for survey processes  Use equipment and tools to accurately measure land features  Supervise and provide guidance to field staff  Collaborate with engineers and architects on site Key Project 6- Beverly Hills Villas and Buildings, EGYPT Responsibilities:  Conduct surveys on land sites and properties  Examine previous records and evidence to ensure data accuracy  Research and design methods for survey processes  Use equipment and tools to accurately measure land features  Supervise and provide guidance to field staff  Collaborate with engineers and architects on site

Education

  • Tanta University.
    Bachelor's degree, Survey and Maps
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now