Mohamed Ashour
Electrical Site Section Head at Concrete Plus- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Concrete Plus
-
Egypt
-
Construction
-
700 & Above Employee
-
Electrical Site Section Head
-
Oct 2022 - Present
Building and finishing fully (143) residential buildings, included infrastructure network with total MEP budget about 170,000,000 EGP for phase (1) only Building and finishing fully (143) residential buildings, included infrastructure network with total MEP budget about 170,000,000 EGP for phase (1) only
-
-
-
REDCON Construction Co. S.A.E
-
Egypt
-
Construction
-
700 & Above Employee
-
Electrical Site Team Leader
-
Aug 2021 - Jan 2023
Building and finishing fully the building with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm and Public Address) with total MEP budget about 493,000,000 EGP.
-
-
Electrical Site Team Leader
-
Jan 2021 - Jul 2021
Building and finishing fully (32) residential buildings, included infrastructure network with total MEP budget about 300,000,000 EGP for phase (1) only.
-
-
Electrical Site Team Leader
-
Aug 2020 - Dec 2020
Replacement and Renewal the building with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm and Public Address) with total MEP budget about 20,000,000 EGP
-
-
Senior Site Engineer
-
Sep 2018 - Jul 2020
Finishing the Gate Tower divided to tower and podium the tower is 44 floor with total site area 42000m2 included three technical floors with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm and Public Address) total MEP budget about 1,800,000,00 EGP.
-
-
Electrical Site Engineer
-
Dec 2015 - Aug 2018
Building and finishing fully (6) residential buildings, included infrastructure network with total MEP budget about 80,000,000.
-
-
-
Drake & Scull International PJSC
-
Construction
-
700 & Above Employee
-
Technical office engineer
-
Jul 2014 - Nov 2015
Finishing the project divided to (2)tower, podium and Basement the tower is 36 floor and tower is 38 floor included seven podium floors with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm, Public Address, Parking System and Access control) total MEP budget about 2,000,000,00 EGP. Finishing the project divided to (2)tower, podium and Basement the tower is 36 floor and tower is 38 floor included seven podium floors with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm, Public Address, Parking System and Access control) total MEP budget about 2,000,000,00 EGP.
-
-
-
PepsiCo
-
United States
-
Food and Beverage Services
-
700 & Above Employee
-
Electrical Site Engineer
-
Apr 2014 - Jun 2014
Replacement and Renewal of the HVAC system, Power cable and Fire alarm with total MEP budget about 10,000,000 EGP. Replacement and Renewal of the HVAC system, Power cable and Fire alarm with total MEP budget about 10,000,000 EGP.
-
-
Education
-
Thebes Academy
Bachelor's degree, Telecommunications and Electronics