Mohamed Ashour

Electrical Site Section Head at Concrete Plus
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cairo, Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Construction
    • 700 & Above Employee
    • Electrical Site Section Head
      • Oct 2022 - Present

      Building and finishing fully (143) residential buildings, included infrastructure network with total MEP budget about 170,000,000 EGP for phase (1) only Building and finishing fully (143) residential buildings, included infrastructure network with total MEP budget about 170,000,000 EGP for phase (1) only

    • Egypt
    • Construction
    • 700 & Above Employee
    • Electrical Site Team Leader
      • Aug 2021 - Jan 2023

      Building and finishing fully the building with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm and Public Address) with total MEP budget about 493,000,000 EGP.

    • Electrical Site Team Leader
      • Jan 2021 - Jul 2021

      Building and finishing fully (32) residential buildings, included infrastructure network with total MEP budget about 300,000,000 EGP for phase (1) only.

    • Electrical Site Team Leader
      • Aug 2020 - Dec 2020

      Replacement and Renewal the building with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm and Public Address) with total MEP budget about 20,000,000 EGP

    • Senior Site Engineer
      • Sep 2018 - Jul 2020

      Finishing the Gate Tower divided to tower and podium the tower is 44 floor with total site area 42000m2 included three technical floors with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm and Public Address) total MEP budget about 1,800,000,00 EGP.

    • Electrical Site Engineer
      • Dec 2015 - Aug 2018

      Building and finishing fully (6) residential buildings, included infrastructure network with total MEP budget about 80,000,000.

    • Construction
    • 700 & Above Employee
    • Technical office engineer
      • Jul 2014 - Nov 2015

      Finishing the project divided to (2)tower, podium and Basement the tower is 36 floor and tower is 38 floor included seven podium floors with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm, Public Address, Parking System and Access control) total MEP budget about 2,000,000,00 EGP. Finishing the project divided to (2)tower, podium and Basement the tower is 36 floor and tower is 38 floor included seven podium floors with all electrical trades (Lighting, Power, Structure Cabling, Fire Alarm, Public Address, Parking System and Access control) total MEP budget about 2,000,000,00 EGP.

    • United States
    • Food and Beverage Services
    • 700 & Above Employee
    • Electrical Site Engineer
      • Apr 2014 - Jun 2014

      Replacement and Renewal of the HVAC system, Power cable and Fire alarm with total MEP budget about 10,000,000 EGP. Replacement and Renewal of the HVAC system, Power cable and Fire alarm with total MEP budget about 10,000,000 EGP.

Education

  • Thebes Academy
    Bachelor's degree, Telecommunications and Electronics
    2007 - 2012