Experience
-
SWAED Petroleum & Technical Services Co. Ltd
-
Sudan
-
Oil and Gas
-
1 - 100 Employee
-
Sr. E&I engineer
-
Dec 2022 - Present
-
-
-
Al Mashariq Group
-
Construction
-
300 - 400 Employee
-
Electrical Engineer
-
Nov 2018 - Present
Managed team of 90 employees for successful installation and commissioning of 24 13.8 KV Capacitor bank Systems in highly sensitive SAUDI ARAMCO Plants including YANBU REFINERY, KSA. Closely led modification of 13.8 Main substation switchgear's in YANBU REFINERY without affecting the operation. Reviewed and modified IFC drawings as Redline Drawings and Maintained Project Documents. Managed Project Cash Flow and procurement. Highly participated in the resolve of major project stakeholders' conflicts. Composed the 2week look ahead plan, and daily as well as weekly Reports to the management to incorporate it with the overall project progress report. Continuously implementing tools and techniques to perform project activities safely. Continuously implementing tools and techniques to reduce the project duration as well as cost without impacting the quality requirements. Directly responsible for Subcontracts, monitoring and controlling their progress, invoicing, and follow up on daily basis for all related Civil Activities including but not limited to surveying, excavation, compaction, installation and leveling of the precast foundation, installation of steel structure, QC Related tests, RFI’s, soil sampling reports, field density test reports, survey reports, torqueing, grouting, fence installation and asphalting. Gained strong knowledge of Electrical related Saudi_Aramco_Engineering_Standards while supporting Q.C department submitting documentation for Aramco OMPP Project (Oil Wells construction project on Khurais Oil Field, KSA). Show less
-
-
-
Technical & Industrial Services Co (TISCO)
-
Construction
-
1 - 100 Employee
-
Project Engineer
-
Sep 2016 - Sep 2018
Successfully completed Replacement of 4.16Kv MV Switchgears & LV Switchboards at sensitive MARAFIQ seawater cooling plant, Jubail, KSA, and managed compatibility struggle between old infrastructure and new automated state of the art technology. Successfully designed and constructed alternative power supply for all emergency loads during shutdowns. Managed Replacement of old 13.8KV RMUs with new compact automated RMUs in SAUDI ARAMCO Dhahran, KSA. Prepared method Statements, testing & commissioning procedures, operation & maintenance manuals, risk assessment, MIR, and others. Supported in the design of 4 Switchgear ATS, Sizing of Electrical Equipment, Earthing & Lighting equipment. Supervised complete installation and commissioning of the new equipment; reviewed technical specifications & analyzed contractor's change order proposals & submittals. Maintained records of all project documents, transmittals, approved drawings, RFI’s, Material inspection requests, testing reports, punch list, approved baseline schedule, and others. Gained strong knowledge of SAUDI ARAMCO standards, Marafiq Standards, and international standards. Show less
-
-
-
EXICO Petroleum Services Co. Ltd.
-
Sudan
-
Oil and Gas
-
1 - 100 Employee
-
Electrical Engineer
-
Jul 2014 - Jun 2016
Guided my team with installation and commissioning of 630A, 33KV RMUs, 150KVA 33KV/415V AUX Transformers, MDBs, Lightning Arrester, Oil Wells, and Water Injection Wells Motors including VSD, FSD, and ESP SKID. Successfully planned, drafted, executed, maintained, and improved electrical equipment, facilities, components, and systems, using computer-aided engineering and designed tools to perform engineering tasks. Guided my team with installation and commissioning of 630A, 33KV RMUs, 150KVA 33KV/415V AUX Transformers, MDBs, Lightning Arrester, Oil Wells, and Water Injection Wells Motors including VSD, FSD, and ESP SKID. Successfully planned, drafted, executed, maintained, and improved electrical equipment, facilities, components, and systems, using computer-aided engineering and designed tools to perform engineering tasks.
-
-
-
STAR CONTRACTING OIL & GAS
-
Heglig, Sudan
-
Electrical Engineer
-
Mar 2013 - Jun 2014
Heglig Airport & Terminal Building Upgrade Project Oil Field Surface Facilities Project Supervised 33kv distribution substations, procurement, installation, testing and commissioning, as-built drawings, final documentation and proficiently execute various tasks involving construction management. Successfully completed a project of renovation of Heglig Airport& Terminal Building Renovation including all Runway Lighting, CCTV, public announcement, lightning arrester, New LV Switchboard and ATS System, HVAC system, etc…. Show less
-
-
-
Al-Mobashir
-
Khartoum, Sudan
-
Electrical Engineer (Maintinance)
-
Feb 2013 - Aug 2013
Supervised electrical and telecommunication team to perform preventive and corrective maintenance for more than 90 mobile base station sites for MTN telecommunication company, Sudan Supervised electrical and telecommunication team to perform preventive and corrective maintenance for more than 90 mobile base station sites for MTN telecommunication company, Sudan
-
-
-
Vasavi Power Services Pvt Ltd
-
India
-
Oil and Gas
-
100 - 200 Employee
-
Electrical Engineer
-
Mar 2012 - Oct 2012
Positioned to be involved in 220KV substation testing and commissioning. Positioned to be involved in 220KV substation testing and commissioning.
-
-
Education
-
University of Khartoum