Mohamed Abd-El Aziz Salama
Wellhead Field Services Engineer at Gulf of Suez Petroleum Company( Gupco. Bp Egypt)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Gulf of Suez Petroleum
-
Egypt
-
1 - 100 Employee
-
Wellhead Field Services Engineer
-
Mar 2016 - Present
Perform Preventive Maintenance PM plan for all types of X-Tree valves ( Loose &Block ) types F,FL , FLS,FC with material trim HH,EE,AA Cameron and FLS trim EE for Tharwa Breda according to API 6A Manage and supervise many labor crews working daily in offshore Platforms Execute repair memo for leaking valves after pressure build up PBU test Replace internal passing for gate v/v assembly of SV,UMV,LMV,FLWV,XTWVafter apply two mech. barriers Maintain all natural flow and artificial lift wells ( gas lift , ESP ) Maintain &Test all types of isolation valves (gate, ball , plug ,check ,butterfly)according to API 598, 594 , 6D Maintain all oil & gas top side production facilities such as(piping , pig traps, chokes , manifolds, Separators ) Supervise Measure up ,Fabrication and Welding for oil & gas pipe lines and headers .according to API 5L Hydrostatic test for isolation valves, oil & gas pipe lines after fabrication & RT completed. Follow up sandblasting & painting for oil & gas pipe lines after hydrostatic test completed. Replace defected ( oil , gas & water Inj.) pipe lines and headers ( apply simple & complicated lifting plan ) Implement FCP ( facility change process ) according as built drawing and material list , process flow diagram Infrastructure replacement according to anomaly report scope of work which is issued by inspection Division Execute the PM & CM plan for all safety equipment, firefighting system , grating replacement , handrails, foam station components , eye wash , life rafts ) Carryout the positive isolation boundary for hydrocarbon P/L’s according to isolation procedure and PTW Show less
-
-
-
-
Wellhead Field Service Engineer
-
Feb 2015 - Mar 2016
-
-
-
Weatherford
-
Ireland
-
Oil and Gas
-
700 & Above Employee
-
Wellhead Field Service Engineer
-
Apr 2011 - Jun 2014
Well Head Field Service Engineer Installed slip lock bottom after casing head housing installed Perform test between the T Seals by test pump and inject fluid to 80% of Casing collapse pressure . Installed of 13-5/8" Seal Assembly and Installed Slip Hanger SB-6A Assembly Landing of CS-S Tubing Hanger after Installed Tubing Head Spool Installed Christmas Tree Well Head Field Service Engineer Installed slip lock bottom after casing head housing installed Perform test between the T Seals by test pump and inject fluid to 80% of Casing collapse pressure . Installed of 13-5/8" Seal Assembly and Installed Slip Hanger SB-6A Assembly Landing of CS-S Tubing Hanger after Installed Tubing Head Spool Installed Christmas Tree
-
-
-
Gulf of Suez PetroleumGu Company Gupco. Bp Egypt
-
Ras Shoukheir Red Sea
-
Senior Mechanical Engineer
-
Nov 2007 - Apr 2011
-
-
-
West Delta Electricity Production Company WDEPCO
-
Sidi Krir Power Station
-
Mechanical Maintenance Engineer
-
Dec 2005 - Nov 2007
Mechanical Power Engineer in Turbine Maintenance Department at Sidi Krir Power Station Mechanical Power Engineer in Turbine Maintenance Department at Sidi Krir Power Station
-
-
Education
-
Cairo University
Diploma of Education, Petroleum Engineering -
Alexandria University
Master of Engineering - M.Eng, Mechanical Engineering -
Alexandria University
Bachelor's degree, Mechanical Engineering