Mohamed Abd-El Aziz Salama

Wellhead Field Services Engineer at Gulf of Suez Petroleum Company( Gupco. Bp Egypt)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Alexandria, Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • 1 - 100 Employee
    • Wellhead Field Services Engineer
      • Mar 2016 - Present

      Perform Preventive Maintenance PM plan for all types of X-Tree valves ( Loose &Block ) types F,FL , FLS,FC with material trim HH,EE,AA Cameron and FLS trim EE for Tharwa Breda according to API 6A  Manage and supervise many labor crews working daily in offshore Platforms  Execute repair memo for leaking valves after pressure build up PBU test  Replace internal passing for gate v/v assembly of SV,UMV,LMV,FLWV,XTWVafter apply two mech. barriers  Maintain all natural flow and artificial lift wells ( gas lift , ESP )  Maintain &Test all types of isolation valves (gate, ball , plug ,check ,butterfly)according to API 598, 594 , 6D  Maintain all oil & gas top side production facilities such as(piping , pig traps, chokes , manifolds, Separators )  Supervise Measure up ,Fabrication and Welding for oil & gas pipe lines and headers .according to API 5L  Hydrostatic test for isolation valves, oil & gas pipe lines after fabrication & RT completed.  Follow up sandblasting & painting for oil & gas pipe lines after hydrostatic test completed.  Replace defected ( oil , gas & water Inj.) pipe lines and headers ( apply simple & complicated lifting plan )  Implement FCP ( facility change process ) according as built drawing and material list , process flow diagram  Infrastructure replacement according to anomaly report scope of work which is issued by inspection Division  Execute the PM & CM plan for all safety equipment, firefighting system , grating replacement , handrails, foam station components , eye wash , life rafts )  Carryout the positive isolation boundary for hydrocarbon P/L’s according to isolation procedure and PTW Show less

    • Wellhead Field Service Engineer
      • Feb 2015 - Mar 2016

    • Ireland
    • Oil and Gas
    • 700 & Above Employee
    • Wellhead Field Service Engineer
      • Apr 2011 - Jun 2014

      Well Head Field Service Engineer Installed slip lock bottom after casing head housing installed Perform test between the T Seals by test pump and inject fluid to 80% of Casing collapse pressure . Installed of 13-5/8" Seal Assembly and Installed Slip Hanger SB-6A Assembly Landing of CS-S Tubing Hanger after Installed Tubing Head Spool Installed Christmas Tree Well Head Field Service Engineer Installed slip lock bottom after casing head housing installed Perform test between the T Seals by test pump and inject fluid to 80% of Casing collapse pressure . Installed of 13-5/8" Seal Assembly and Installed Slip Hanger SB-6A Assembly Landing of CS-S Tubing Hanger after Installed Tubing Head Spool Installed Christmas Tree

    • Senior Mechanical Engineer
      • Nov 2007 - Apr 2011

    • Mechanical Maintenance Engineer
      • Dec 2005 - Nov 2007

      Mechanical Power Engineer in Turbine Maintenance Department at Sidi Krir Power Station Mechanical Power Engineer in Turbine Maintenance Department at Sidi Krir Power Station

Education

  • Cairo University
    Diploma of Education, Petroleum Engineering
    2021 - 2023
  • Alexandria University
    Master of Engineering - M.Eng, Mechanical Engineering
    2008 - 2010
  • Alexandria University
    Bachelor's degree, Mechanical Engineering
    2000 - 2005

Community

You need to have a working account to view this content. Click here to join now