Mohamad Zulfarid

Electrical Engineer/Programmer at Fujimaster Engineering
  • Claim this Profile
Contact Information
Location
Johor Bahru, Johore, Malaysia, MY

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Malaysia
    • Industrial Automation
    • 1 - 100 Employee
    • Electrical Engineer/Programmer
      • Jun 2020 - Present

      -Develop and debug in LabVIEW/PLC codes.-Works with testing equipment eg, Power meter, Flow meter, Programmable Power Supply-Design software architecture and optimize the performance.-Design wiring diagram fortester/machine.-Integrate tester/machine software and hardware.-Liase with customer for project detailed requirement/ project issue/ result verification.-Control and Monitor project schedule, equipment and lead time.-On site service fortester/machine breakdown when required

    • Malaysia
    • Appliances, Electrical, and Electronics Manufacturing
    • 400 - 500 Employee
    • MES Engineer
      • Jan 2019 - May 2020

      -Set up Manufaturing Execution System for all production line. Make sure that MES system running well. Trouble shooting the problem that occur on MES-Give idea to improve the output of the production.-Responsible for new line setup.Make sure the Process Flow Chart, Work Instruction, Process Standard Time, jigs and fixture and machine are readily prepared. The line capacity must meet customer minimum orders.-Must make sure the InforLN Routing is properly setup prior trial run. The Routing setup must reflect production actual situation.-Responsible for the new machine evaluation, recommendation for purchase and buy-off before accepting the machine from supplier.-Responsible for the process optimization and cycle time reduction to achieve the KPI target defined by Management.-Implement any other process improvement projects assigned by Management.Perform any other duties assigned by superior

    • Assistant Engineer
      • Jun 2018 - Dec 2018

      -This company is port equipment specialist. So we do maintanance for crane and spreader. Also we do other project like installing the gearbox -My responsibility is to do maintanance for the spreader. -Must check all mechanical and electrical part of the spreader.-Also do Troubleshooting if there is any breakdown on crane. -Read electrical diagram for electrical Troubleshooting -Meeting with PTP everyday for the daily job that has been done. -Also manage to install gearbox.

    • Paraguay
    • Advertising Services
    • Quality Control Inspector
      • Jul 2017 - Feb 2018

      -Read blueprints and specifications -Monitor operations to ensure that they meet production standards-Recommend adjustments to the assembly or production process-Inspect, test, or measure materials or products being produced-Measure products with rulers, calipers, gauges, or micrometers-Accept or reject finished items-Remove all products and materials that fail to meet specifications-Discuss inspection results with those responsible for products-Report inspection and test data

Education

  • Universiti Kuala Lumpur
    Engineering Technology (Hons) in Instrumentation and Control Engineering, Instrumentation and control engineering
    2014 - 2018
  • Kolej Yayasan Melaka
    Diploma, Electrical and Electronics Engineering
    2012 - 2014

Community

You need to have a working account to view this content. Click here to join now