Mohamad Zaaroura
Project manager at IJ Build Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Arabic Native or bilingual proficiency
-
Turkish Limited working proficiency
Topline Score
Bio
Credentials
-
White Card: Construction Induction Training Course
Edway TrainingJan, 2020- Nov, 2024 -
Managing Safely
THE INSTITUTION OF OCCUPATIONAL SAFETY AND HEALTHJul, 2019- Nov, 2024 -
Wellness and Medical Fitness in Business
Consolidated Contractors International CompanyOct, 2016- Nov, 2024 -
Ethics and Anti-Corruption Training
Consolidated Contractors International CompanyMay, 2015- Nov, 2024 -
Leadership in Action
Consolidated Contractors International CompanyFeb, 2014- Nov, 2024 -
Occupational Safety and Health Administration OSHA 510-1926
Occupational Safety and Health AdministrationJan, 2012- Nov, 2024 -
How to Negotiate Effectively
Consolidated Contractors International CompanySep, 2011- Nov, 2024 -
Safety Management and Leadership
Consolidated Contractors International CompanyJun, 2011- Nov, 2024 -
Incident and Injury Free Orientation
BOVIS LEND LEASE CEMEA INVESTMENTS LIMITEDNov, 2008- Nov, 2024 -
Risk Management Professional
Project Management InstituteDec, 2016- Nov, 2024 -
Project Management Professional
Project Management InstituteJun, 2014- Nov, 2024 -
Basic First Aid
GTSC UAE - Gulf technical & safety training centerMay, 2011- Nov, 2024 -
Fire Fighting Training
Consolidated Contractors International CompanyMay, 2011- Nov, 2024
Experience
-
IJ Build Group
-
Australia
-
Construction
-
1 - 100 Employee
-
Project manager
-
Jan 2020 - Present
-
-
-
NUROL LLC
-
United Arab Emirates
-
Construction
-
100 - 200 Employee
-
Construction Manager
-
Mar 2018 - Dec 2019
Project: Dubai Creek Harbour The Cove. Dubai, United Arab EmiratesThe budget USD 100 milThe overall built-up area is 76,136 m2 consisting of Podium (2B+G+M), three residential towers comprising 9, 13 and 24 floors. Duties• Reviewed contract / tendering documentation, to ensure a thorough understanding of the relevant contract requirements liaising with planning and budgeting engineers as necessary to establish and implement systems for the section.• Managed project expenditure and cash flow• Led and managed subcontractors.• Managed stakeholders and liaising consultants to obtain the necessary approvals and to solve technical disputes if any.• Contributed to the ongoing development and continuous improvement of health and safety management systems, procedures, measures and controls.• Project managing from initial setup to project completion• Prepared forecast schedule, resources estimation and monitoring costs• Design faults identifying and proposing solution through keen analysis and troubleshooting by coordination with engineering department, • Identified and assessed risks, planned risk response and control risksAccomplishments :• Made several modifications on the structural design which lead to cost saving (e.g. cancelled two big attic slab and replaced mass concrete filling inside MEP pits with suspended slab led to USD 150,000 saving)• Verified several scope discrepancies, accordingly, obtained variations worth USD 370,000 • Change the formwork system which accelerated the progress and saved around USD 70,000.• Implemented two shift work system which led to increase the weekly progress around 50%
-
-
Senior Project Engineer
-
Mar 2018 - Dec 2019
-
-
-
Consolidated Contractors Company
-
Greece
-
Construction
-
700 & Above Employee
-
Project Engineer
-
Jun 2013 - Mar 2018
Project: Abu Dhabi New Airport – Midfield Terminal Complex (MTC), United Arab EmiratesBudget: USD 3.0 bnProject Consist of Central Process area connected to 4 Piers and 48 gatehouse. Total gross area 700,000 m2Duties:• Produced and reviewed methods statements and ITP’s ensure they are submitted and got approvals as per the planning schedules• Ensured material are procured in advance of the requirements of the construction program• Identified changes and variations to the works under the Contract• Conducted progress and coordination meetings with subcontractors to foster communication among various parties in order identify & solve issues and maximised efficiency in scheduling & performance• Provided engineering and construction solutions• Checked invoices from sub-contractors based on the work done at site.• Reviewed the bill of quantities and ensure that all items and quantities are as per the IFC drawings and within project budget.• Health, safety and environment requirements observance ensuring working environment is conducive for workers • Create construction schedule and implement it at site• Followed the work at VIP drop off bridge and departure bridge. Surpassed the completion date target for both bridgesAccomplishment:• Completed milestone 3 one week in advance of contract• Participated in solving structural obstacles and difficulties ahead of construction stage and succeeded in completion of structural works 1 month ahead of schedule• Handed over all technical rooms (stage one rooms) on time• Succeeded in completing the Package Handling System and started the commissioning on schedule.
-
-
Senior Site Engineer
-
Apr 2011 - Jun 2013
Project: Bab Thamama “G” and Habshan 2 1.8 MMBOPD Phase-1 Development ProjectBudget USD 650 mil Client: Abu Dhabi Company for Onshore Oil Operations (ADCO) / Total / Shell4 RDS’s (Degassing Stations), 54 Oil Production Wells, 52 Water Injection Wells, 8 Water Injection Clusters, Bab Central Degassing Station (BCDS) Expansion and Transfer Pipeline. Duties:• Evaluated construction sequence and requirements• Subcontractors' obligations & tasks assigning. Directed subcontractors scope, requirements and payments• Site supervision & troubleshooting construction activities at site in a controlled timetable• Interacted with Electrical, Pipeline & Piping Departments and Engineering to ensure executed work is in compliance and no clash with other priorities• Technical transmittal (MAR, MS, ITP, TRA) reviewing and proposing modification once required• Site disputes identification by interaction with engineering department, and field modification & solutions as per site condition proposal development• Enforced working environment safety measures as per standard HSE requirements. Managing works and permits in green and brown fields• Handed Over the Project to Client (Civil Works) managing the pre-commissioning and commissioning stage for civil activitiesAccomplishment:• Boosted the productivity at the precast yard and fabrication yard by 70%• Completed milestone 1 (RDS 07) 2 months ahead of schedule, including commissioning. Oil production started ahead of baseline schedule• Completed the project and handed over all civil works to client on time• All work completed with zero LTI (More than 30 million man-hours)
-
-
-
SEREX INTERNATIONAL CONSULTANT INGENIERIE
-
France
-
Business Consulting and Services
-
1 - 100 Employee
-
Civil Engineer
-
Feb 2009 - Apr 2011
Project: Abu Dhabi Financial Centre, Sowwah Square Budget USD 1.6 bn Consist of Four towers (two 31 & two 37 stories) 2 levels of retails, 7 floors stock exchange & 2 car parks at 6 levels. Project: Paris Sorbonne University, Abu Dhabi New Campus (Phase 1 & 2) Budget USD 383 mil Consists of: Central Plaza, Administration Building, Dining Hall, Lecture Wing 1 & 2, Library and Technical building, Three Stories Car Park, Five Stories male and female residential buildings, Auditorium and Sport Halls Duties • Managed Structural activities including climbing formwork, slab formwork, rebar and concrete casting. • Directed Piling works including pile driving, installing reinforcement cage, casting and pile treatment following up • Supervised Fit-out works including façade, flooring, glazing, partitions, miscellaneous metal works, glass, structure, false ceiling, washrooms … etc. • Monthly reporting of projects KPIs • Prepared and validated all documentation required for the project • Liaise with QA/QC department in order to ensure that all works are inspected formally, done as per the project specifications and approved methods statements and ITPs • Reviewing method statements for civil activities • Observed Health, safety and environment requirements ensuring working environment is conducive for workers • Preparing forecast schedule, resources estimation and monitoring cost • Handing over process with ADM (Abu Dhabi Municipality) and Local Authorities Accomplishments: • Improved the structural quality at the projects by close monitoring and audit, accordingly reduced the cost of rectification and repair. • Handed over Phase 1 of Paris Sorbonne University to local authorities on time and classes started in the university accordingly • Handed over 4 towers in Abu Dhabi Financial Centre to Civil Defence Authority
-
-
-
NUROL LLC
-
United Arab Emirates
-
Construction
-
100 - 200 Employee
-
Junior Engineer
-
Aug 2008 - Jan 2009
Project: Jumeirah park project - Dubai (465 Villa with 4 Different Elevations) Budget USD 208 mil Duties: • Led Foremen, labours and subcontractors • Coordinated with design office, MEP team and consultant • Supervised earthwork, fixing rebar, formwork, concrete and witnessing project related test • Managed finishing works including underground mechanical piping, drainage system, block works, plastering & waterproofing • Daily, weekly and monthly progress reporting
-
-
Education
-
Middle East Technical University
Bachelor's Degree, Civil Engineering