Mochamad Fajar
Coal and Ash Handling Control Room at Genting Energy- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Fikriawan Kertamuda
humble, komunikatif dan menguasai untuk area kerja coal ash Handling khususnya
Husni Mubarak Taufik
Fajar is creative team player who can easily come up with his idea to achieve the tema goal
Fikriawan Kertamuda
humble, komunikatif dan menguasai untuk area kerja coal ash Handling khususnya
Husni Mubarak Taufik
Fajar is creative team player who can easily come up with his idea to achieve the tema goal
Fikriawan Kertamuda
humble, komunikatif dan menguasai untuk area kerja coal ash Handling khususnya
Husni Mubarak Taufik
Fajar is creative team player who can easily come up with his idea to achieve the tema goal
Fikriawan Kertamuda
humble, komunikatif dan menguasai untuk area kerja coal ash Handling khususnya
Husni Mubarak Taufik
Fajar is creative team player who can easily come up with his idea to achieve the tema goal
Credentials
-
Sertifikat Ahli Pembangkit Level 3 - Operation
PT SKP Tenaga ListrikFeb, 2022- Oct, 2024 -
Sertifikat & SIO - Bulldozer
Kementerian Ketenagakerjaan Republik IndonesiaApr, 2019- Oct, 2024 -
Sertifikat & SIO - Dump Truck
Kementerian Ketenagakerjaan Republik IndonesiaApr, 2019- Oct, 2024 -
Sertifikat & SIO - Excavator
Kementerian Ketenagakerjaan Republik IndonesiaApr, 2019- Oct, 2024 -
Sertifikat & SIO - Wheel Loader
Kementerian Ketenagakerjaan Republik IndonesiaApr, 2019- Oct, 2024 -
IHT Low Rank Coal Stock Pile Management
PT Fresh Galang MandiriMar, 2019- Oct, 2024 -
Sertifikat Ahli Pembangkit Level 2 - Operation
PT SKP Tenaga ListrikSep, 2018- Oct, 2024 -
Emergency Response Team Class C
Building and Plant Safety InstituteFeb, 2018- Oct, 2024 -
Advanced Fire Fighting
PT. Samson TiaraDec, 2016- Oct, 2024 -
On Site Training CFPPP 1x670 MW Banten
Harbin Electric Company LimitedDec, 2016- Oct, 2024 -
Sertifikat & SIO - Stacker Reclaimer
Kementerian Ketenagakerjaan Republik IndonesiaJun, 2016- Oct, 2024 -
Sertifikat Ahli Pembangkit level 1 - Operation
HakitJan, 2014- Oct, 2024 -
Sertifikat & SIO - Stacker Reclaimer
Kementerian Ketenagakerjaan Republik IndonesiaNov, 2012- Oct, 2024 -
In House Training - Modul 1 & 2 PLTU
Cogindo DayaBersamaOct, 2011- Oct, 2024 -
On Site Training CFPPP Pelabuhan Ratu 3x350 MW
CHD Power Plant Operation Co., Ltd.Jul, 2011- Oct, 2024
Experience
-
Genting Energy
-
Malaysia
-
Oil and Gas
-
1 - 100 Employee
-
Coal and Ash Handling Control Room
-
Sep 2019 - Present
PT. Lestari Banten Energi - IPP Banten 1x670 MW Supercritical Coal Fire Power Plant- Control and monitor operation the wholes process of raw material transport (coal) from the ship until the plant, to ensure continues, safe and reliable material supply to production plant- Control and monitor operation the wholes process of raw material transport (fly ash and bottom ash) from the hopper electrostatic precipitator until 3rd party transporter or from bottom ash bin to disposal ash yard, to ensure continues, keep the silo level conditions safe (fly ash silo and bottom ash bin) and minimize the impact of environmental pollution- Control, monitor and coordinate the activities with of coal and ash handling supervisor, coal and ash handling operator (field operator, heavy equipment operator, stacker reclaimer, ship unloader operator), PTW officer, other operation devision (mainplant and wtp), maintenance devision and 3rd party- Analyze problems and find the solution by coordinating with operators, supervisor and engineer to ensure minimum impact of the trouble- Make daily reports (log book, check list, coal stock reports, fuel reports, fly & bottom ash reports, balance of ash yard reports, deffect list and notification list)- Shift operation of coal and ash handling as coal and ash handling control room Show less
-
-
Coal and Ash Handling
-
Mar 2016 - Sep 2019
PT. Lestari Banten Energi - IPP Banten 1x670 MW Supercritical Coal Fire Power Plant- Support mechanical coal and ash handling construction team to conduct inspection and reviewing every works that has been done by subcontractor then decide whether the work was accepted or not (reported to coal and ash handling chief)- Analyze problems and find the solution by coordinating with operators, supervisor and engineer to ensure minimum impact of the trouble- Coordinate the activities with of coal and ash handling supervisor, coal and ash handling control room operator, PTW officer, maintenance devision and 3rd party- Make daily reports (log book, check list and deffect list)- Shift operation of coal and ash handling as stacker reclaimer operator, heavy equipment operator, field operator Show less
-
-
-
Cogindo DayaBersama
-
Indonesia
-
Oil and Gas
-
400 - 500 Employee
-
Coal and Ash Handling
-
Jul 2011 - Mar 2016
PLTU Jawa Barat 2 Pelabuhan Ratu 3x350 MW - Analyze problems and find the solution by coordinating with operators, supervisor and engineer to ensure minimum impact of the trouble - Coordinate the activities with of coal and ash handling supervisor, coal and ash handling control room operator, PTW officer, maintenance devision and 3rd party - Make daily reports (log book, check list and deffect list) - Shift operation of coal and ash handling as coal and ash control room operator, stacker reclaimer operator, ship unloader operator, heavy equipment operator, field operator Show less
-
-
-
-
Final Check
-
Dec 2010 - Jul 2011
-
-
-
-
QC
-
Oct 2009 - Dec 2010
-
-
Education
-
SMK PGRI 1 Kota Serang
automotive mechanical -
Universitas Terbuka